Council archive · source document
Delegated Report - Code - Planning OPW20 0017 · OPW20/0017
Author Monkeith Kadhum Development Assessment APPLICATION DETAILS Application No. OPW20/0017 Applicant David Austin Dunworth Proposal Operational Works - Landscaping Properly Made Date 3 February 2020 Information Request Date 2 March 2020 Information Response Date 1 June 2020 Decision Due Date 06 July 2020 Report Completed Date 19 June 2020 Number of Submissions Not Applicable PROPERTY DETAILS Property Address 46 Plover St Peregian Beach Qld 4573 RP Description Lot 16 P 9313 Land Area 506 m² PROPOSAL The application seeks approval for Operational Works – Private Frontage Works/Landscaping site details Site Description - Site Map - assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017 The Noosa Plan. The following codes from the Noosa Plan are applicable to this development: Engineering Works Codes including in particular; Detached House Driveways Code and Driveway and Carparking Code cONSULTATION The application was forwarded to the following internal Council officers: Park & Gardens Coordinator, Infrastructures Services Department –Re: works within road reserve Conor Neville – Re: Landscaping works Comment Following a site meeting on 05 May 2020 attended by Council officers, owners and the consulting engineer and the designer; and to achieve a reasonable and acceptable outcome in relation to the unauthorised pedestrians entry gate and steps within the road reserve, Council advised the applicant: As was suggested at the meeting that a ramp approximately 6.0m long and 1.0m wide along the fence line runs from the edge of the driveway to the existing landing outside the pedestrian gate shall be constructed at compliant or safe grades for the users with a vegetated fall barrier/buffer. Also, it was emphasised that the option of relocating the pedestrian’s entry gate at different location and at a higher must be duly considered. On 02 June 2020, applicant provided updated design generally consistent with Council’s advice and the site meeting agreement. The updated design was referred to Council’s authorised officer (Park & Gardens Coordinator) Infrastructures Services Department who advised: I have reviewed the plans and also had a quick site visit to the property. Although the proposed structure and landscaping to be located on private property extend slightly wider than the 800mm width from the front boundary line which is being proposed in the draft Landscaping on the Road Reserve Policy and Guideline which is yet to be adopted by Council, I’m satisfied that the proposed landscaping will not restrict or block pedestrian thoroughfare on this road verge so I have no objections to it in this regard. The proposed species are native and will not create a weed issue and won’t intrude further into the road verge as they grow, so they will be unlikely to block pedestrian access in the future. The proposal is therefore acceptable in terms of its impact on the road reserve from a Parks & Gardens perspective. As such it was concluded that the updated design be approved subject to conditions and a Property Note regarding owner/s responsibility for on-going mainatemnace and public liabilities for the works in the road reserve. Also, given the hazard associated with the existing unauthorised works within public road reserve, a condition is included to require works be completed within three months. conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No OPW20/0017 for Operational Works – Frontage Works/Landscaping situated at 46 Plover St Peregian Beach Qld 4573 and described as Lot 16 P 9313, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: OPW20/0017 Street address: 46 Plover St Peregian Beach Qld 4573 Real property description: Lot 16 P 9313 Planning Scheme: The Noosa Plan (8 June 2018) Decision details Council decided to issue the following type of approval: Development Permit for Operational Works – Private Frontage Works/Landscaping CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions APPROVED PLANS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 4395_L104 D Proposed Frontage 46 Plover St, Peregian Beach - Operational Works Plan, prepared by Blackburn Jackson 29/05/2020 CURRENCY PERIOD The Currency Period for this development approval lapses if the development has not substantially started by 20 June 2022 unless an application to extend the currency period is approved by Council. SITE SPECIFIC CONDITIONS Proposed private pedestrian ramp, two riser steps and 500mm vegetation buffer/fall barrier within the road reserve must be constructed in accordance with the approved plan and the and relevant conditions of this approval; and must comply with the following: The 500mm vegetation buffer must well established and maintained to achieve effective long-term fall barrier; and be certified accordingly prior the final inspection by Council. The current owners and any subsequent owners are responsible for all ongoing maintenance of the proposed pedestrian ramp, two riser steps and 500mm vegetation fall barrier necessary to ensure their safe performance for the life of the development. The current owners and any subsequent owners are wholly responsible for all public liabilities attributed to the proposed pedestrian ramp, two riser steps and 500mm vegetation fall barrier (*). (*) refer to property notes. Given the hazards to the public associated with the existing unauthorised and unapproved works within the public road reserve, the proposed upgrading works of this permit must be completed within three (3) months starting the day that this development approval takes effect. PRIOR TO COMMENCEMENT OF WORKS Engineering Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. A condition report including photographs of the frontage of the site must be completed and submitted to council at the prestart meeting and prior to any works commencing. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering and Landscape works; Erosion and sediment control works; Traffic management. A Construction Management Plan is required to be submitted to Council at or prior to the prestart meeting and must specifically address the following: Traffic Management during all aspects of the construct phase including: Appropriate traffic control signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD), and without impacting on local traffic flows and safety. Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased. Proposed fencing to the site during the construction phase of the development. Adequate parking arrangements for construction workers. Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. DURING CONSTRUCTION Engineering The developer must meet any costs to repair damage to any existing Council and/or public asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. All works must be constructed and work procedure undertaken in accordance with: The approved plan and conditions detailed in this Decision Notice. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines. The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Works within Road Reserve/Reinstatement Safe pedestrian access on the street in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. The existing street trees near the road’s edge of bitumen must be removed by suitably qualified or experienced person. Any replacement trees must only be provided after consultation and written consent from Council. The verge is to be modified such that the maximum crossfall for the verge is 5%, except in the location of a pathway where the maximum crossfall is to be 2.5%. Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (eg by blocking or interfering with natural overland flows). Pedestrian Private Ramp The proposed private ramp within the road reserve must be constructed generally in accordance with the approved plan and in compliance with the following general requirements: Must have compliant grades that ensure it is safe for its intended users including during adverse weather condition and poor lighting. Must be made of durable and stable material with an appropriate finish to provide a slip resistant surface at all time. Be provided with all necessary drainage provisions and measures according to the supervising engineer recommendations to maintain its safe use in all weather conditions. To match or abut adjoining surfaces so as not to create a pedestrian trip or fall hazards. Be certified by the supervising engineer on completion of works. Note: it is recommended that property lighting be provided to illuminate the pedestrian ramp when used in the dark. Landscape works Landscape works must: Delineate all planting to grassed area interfaces with spade cut edge. Ensure permanent irrigation is not installed within the road reserve. Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free of foreign matter including anthropogenic waste, rock, soil/sediment contamination and is applied to all planting areas to ensure a minimum 100mm depth once settled. Turfed areas must be must be free of pest, diseases and weeds and level with adjoining surfaces. It is important that all landscape works must be established and maintained in accordance with the approved design for the life of the development, particularly the proposed 500mm vegetation buffer/barrier, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. Driveway Driveway crossover must be in compliance with the relevant sections of AS 2890.1 and best engineering practices, and shall be certified by RPEQ. Erosion and Sediment Control Sediment and erosion control measures must be in place prior to works commencing. If such measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such fines can be issued if sediments from the site are found to enter or have the potential to enter Council’s stormwater system, natural waterways, any downstream stormwater filtration system or adversely impacting on other properties. It is the site's Supervising Engineer who is responsible for ensuring that the sediment and erosion control measures have: Been duly designed by an RPEQ or CPESC and constructed in accordance with "best practise" methods, Been revised to address predicted rainfall events, and Achieve the desired environmental outcomes. Council may request further controls to be installed should the implemented measures be found inefficient. The erosion and sediment control measures must be designed, installed and maintained in accordance with the supervising engineer instructions and the current best practice standards * (Refer to Advisory Note). The developer must ensure non-essential exposure of soil is prevented by restricting the extent of disturbance and minimising the duration of soil exposure to adverse weather conditions and effectively turf, cover or stabilise any disturbed area without delay and prior to rainfall occurring. The developer must ensure sediment does not leave the site or enter onto adjoining properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or machinery. Where sediments or other contaminants are deposited on a road, they must be removed so as not to enter Council’s drainage system or waterways. Prior to the completion of the development works, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. FOLLOWING CONSTRUCTION Certification and Final Inspection Upon completion of the work and prior to final inspection by Council a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. A final inspection and approval of the completed works by Council’s Inspector is required. Please contact Council on 5329 6245 to arrange for the inspection. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes As the driveways are private structures, the property owner bears full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction and maintenance. Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the accuracy of the drawings has not been undertaken. The applicant bears full responsibility for all aspects of the engineering design. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the changes must be lodged with this application along with any fees if applicable. Prestart and Inspections Request Contact Council on 5329 6245 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. Environmental Advisory notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include: the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Council; Best Practice Erosion and Sediment Control, International Erosion Control Association (2008) As a general rule, a site is determined to have achieved effective short-term stabilisation if at the time of the plan sealing inspection: Methods of stabilisation are: appropriate for slopes and slope lengths; and are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination. If at the time of request for plan sealing, the method of short-term stabilisation has not achieved a level of stability that Council's Officers believe will have a high probability of achieving long term stability (i.e. until house construction has occurred on all lots), Council Officers may take the following matters into consideration in determining whether the site is capable of achieving medium to long-term stability: evidence that the site has been effectively stabilised in the short term; evidence that soil has been adequately ameliorated; evidence that seed of annual and perennial grass species has been applied at an adequate rate; and that grass seed has germinated at a density that is likely to achieve an effective grass cover .Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to discuss any obligations under the ACH Act. property notes The following property notes or similar will be placed against the subject property in Council’s property record system upon approval of the completed works: The current owners and any subsequent owners are responsible for all ongoing maintenance of the proposed pedestrian ramp, two riser steps and 500mm vegetation fall barrier necessary to ensure their safe performance for the life of the development. The current owners and any subsequent owners are wholly responsible for all public liabilities attributed to the proposed pedestrian ramp, two riser steps and 500mm vegetation fall barrier.(Council reference no:OPW20/0017). VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 5 of 9 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW20 0017Related documentApplication case desk ↗
About this file
- File size
- 501 KB (small file)
- File type
- DOCX
No other editions are linked here.