08/0613 - Operational Works - Prescribed Tidal Work - Transport Type 5 (Jetty) [As Published] · 142008.613
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.4, 3 March 2008
(b) !s any of the proposed tidal work to be carried out in one or more of the following tidal areas?
@ One only local government tidal area [ No &] Yes
{ii) Starting in one local government tidal area and extending into another local J No C1 Yes
government tidal area (but in no strategic port tidal area)
(ii) In two or more focal government tidal areas but not starting in either local
government tidal area XX No [] Yes
{iv) One only strategic port tidal area {] No (J Yes
{v) A Neel area that is not a strategic port tidal area or a local government tidal Bq] No Cl Yes
Note: The answers you provide in (i) - (v} above may affect who the Assessment Manager is for the application.
IPA, schedule 8, part 7, table 4, item 5; IP Regulation, schedule 2, table 2, items 12, 14 and 17. IP Regulation. schedule 1, part 3. table 4, tems 4A and §
Coastal Protection and Management Act 1995, section 104A {wild river area)
ICOASTAL MANAGEMENT DISTRICT; WILD RIVER AREA : |
4.14 Is any of the operational work proposed to be carried out within a coastal management district?
[X] No -Gotoas12 [[] Yes
IPA. schedule 8, part 7, table 4, item 5; IP Regulation, schedule 2. table 2, items 12 and 14; IP Regulation, schedule 1, part 3, table 4, items 4A and §
Coastal Protection and Management Act 1995 Act 1995, section 104A {wild river area); Wid Rivers Act 2005, seciion 43A
WATERWAY BARRIER WORKS; WILD RIVER AREA oe aa 7 |
4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
1X] No -Gotoas13 [[] Yes
IPA, schedule 8, part 1. lable 4, nem 6; IPA, schedule 8, pari 2. table 4, item 2; Fisheries Regdlation 1995 571A (self assessable codes); IP Requiakn, schedule 2 table 7, item 28; 1P
Roguiston, schedule |, part 3, table 4, tem 6; f shenas Act 1904, sechon 76D {vald fiver area}; Wild Revers Act 2008, section 43A.
IDEGLARED FISH HABITAT AREA; WILD RIVER AREA : , : . : a |
4.13 's any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
No - Goto 04.14
0 Yes
IPA, schedule 8, part 1, table 4, dem 7: IPA, schedule 8, part 2. table 4, tens 3: Fishenes Regulation 1995 511.2A {self assessable cores); IP Regulation, schevule 2, table 2, item 25;1P
Regulation, schedule 1, patt 3, table 4, ilem 7; Wild Rivers Act 2005, sections 43A; Fisheries Act, section 76DC (wild srver ama).
JREMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA : so {
4.14 ts any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
IX] No -Gotoas75 ((] Yes
IPA, schedule 8, part 1, lable 4, tem 8; IPA, schedule 8, part 2. lable 4, item 4; Fishenes Regulabon 1995 5113A (selfassessabie cores); IP Requiation, schertile 2, tale 2, tom 79, IF
Regulation, schedule 7, part 3. talte 4, dem 8; fishertes Act 1994, section 760B (valu iver area): Wild Rivers Act 2005, section 43/: relevant wild river declaravon; Wild Rivers Code
AWILD.RIVER AREA. . . ; . |
4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
EX] No -Gotoas16 [_] Yes
IPA, schedule 8, part 1, table 4, item 10, IP Reguiation, schedule 2, table 2, item 37; Wild Rivers Act 2008, sections 42, 43A
ISTATE-CONTROLLED ROAD |
4.16 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
[EX] No -Endorsections (_] Yes
IP Regulation, schedule 2. table 2, Kem 3
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable iegislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0613 - Operational Works - Prescribed Tidal Work - Transport Type 5 (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 968 KB (small file)
- File type
No other editions are linked here.