08/0613 - Operational Works - Prescribed Tidal Work - Transport Type 5 (Jetty) [As Published] · 142008.613

of 20

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)

 

Name of water body, watercourse or aquifer (¥ known) |

 

1 Woon Sound Gaal

 

Table E Complete if the Premises ar are on Strategic | Port Land under the Transport infrastructure Act 1994

1

Port Authority for the fot
Table F Complete it the premises are in tidal water

~ Name of local government for the tidal area f applicable)
[1 Sunshine Coast Regional Council Noosa Office

 

 

 

 

 

 

  

 

 

 

 

 

3. __ Indicate the total area of the premises on which the 'e development i is proposed: (Note: The total area may include land both above and below water)

“Total area ofpremises “|

 

 

 

 

 

 

 

589.00 Km? [hectares (Tick appcable unit)
[Existing use of the premises - , ]

 

4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)

[|

5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.)?

 

No Oo Yes - Ensure the type, facation and dimensions of each easement are included in plans, submitted with the application

[Proposal details J
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture)

 

 

Timber jetty & concrete boat ramp

 

 

 

7. Does the poposal include new buildings or operational work (including any services) on the premises?
{[] No LR] Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application

 

Resource entitlement wWzpp.cabioy «further mlormationss pwouided.n the advice-secton at the end ofthe form : oa! ah

 

8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)

BS No -Gotoa9 Oo Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.

 

‘Owner's consent (fepe:cab’} - fuer form ston ts provided 1 the ed Ze Section it the end of tie fom : i

9. Complete Table H for applications involving a material change of use; reconfiguration of a tot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor fand defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable.

 

 

 

Premises Owner's name/s Details.of the premises owned . . Date consent
Table H and postal address (siteet address or fol on plan description} Owner's signature was obtained
Michael Brew
1 |p¢ Box 299 Noosavile 4566 | 1” Key Crt, Noosa Heads. QLD 4567 6/12/2007

 

 

 

 

 

 

 

* Owner's signature cannol be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the awner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .

 

‘Attachments and supporting information (Camsice Table 1 Use a 5¢r-sate cow for each ype: of atischment or infomation. sncudng.mtormston required
It’s P=). Please ensure all documentation submitied with this form, inducing other Parts of Fonn 1, of owner's consent, ett, are secegely dtached to this Part of the Forni,

 

 

 

 

 

 

Description of attachment | of information Title @appicabie) . “Method of delivery to | q
Table | Teg. Pa Cet Fonn E rs 3 unsere ane Ofresautce (e.g, Ganera Aunonty, tes SteatTrafe Rept Date assessment manager
Eco Access Application form 31-Mar-2008 | mail
2 Part P 31-Mar-2008 | mail

 

 

 

 

 

 

 

Used in these records

About this file

File size
968 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0613 - Operational Works - Prescribed Tidal Work - Transport Type 5 (Jetty) [As Published].pdf · 968 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.