Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

08/0613 - Operational Works - Prescribed Tidal Work - Transport Type 5 (Jetty) [As Published] · 142008.613

of 20

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 Part P, Version 2 1, 3 March 2008

 

(Certification . . |

 

4. Has a Registered Professional Engineer of Queensland (RPEQ) or interstate equivalent certified that the works comply with the design
and safety provisions of the State IDAS code for Prescribed Tidal Works contained in the Coastal Protection and Management

 

 

 

 

 

 

 

Regulation 2003?
[CO No
Dd Yes - Provide details below
Name of RPEQ or equivalent John Norden Structural Civil Design Engineers
IRPEQ No. or equivalent
Contact maiing address : {PO Box 205, Tewantin. QLD 4565
Contact telephone number 107 5449 7137
Contact facsimile number 107 5449 7172
FReference number of 2:t plans to which this certification relates jor/244-1 , 07/244-2, 07/244-3

 

 

 

Mandatory infortnation . Te |

 

e@ 5. Confirm the following mandatory information accompanies this application.

 

Confirmation of

fodgement of lodgement |

 

ns and written documentation
(i) The location and dimensions of the proposed tidal work in relation to the lot/s abutting the proposed
work and the tidal land on which the work is proposed to be located
(ii) All other structures on the waterfront and within 20 metres of the proposed works Xi Confirmed mail

(iii) The current location of Lowest Astronomical Tide (LAT), Highest Astronomical Tide (HAT) and
Mean High Water Springs (MHWS)

(iv) The slope angles of the beds and banks of the tidal area & Confirmed mail

(v) Details of the proposed work in accordance with the IDAS code for prescribed tidal work in the

Coastal Protection and Management Regulation 2003, schedule 4A (e.9. physical appearance, lighting, |<] Confirmed mail
signage, earthworks, public access, infrastructure, structural components, engineering design standards)

 

[X] Confirmed — | mail

 

 

[X) Confirmed =| mail

 

 

 

 

 

 

 

 

 

 

 

 

 

(vi) — The finished levels of the proposed works [XJ Confirmed mail
{X] Confirmed
(vii) — Details of the largest vessel, if any, to be moored at the structure mail
[J Not applicable
@ (vil) Evidence that the proposed work will not prejudice the access rights of adjoining property X Confirmed mail
owners [Not applicable
OFFICE USE ONLY

 

 

Date Recaved Reference Numbers [dA sted fe

 

 

 

 

 

 

Used in these records

About this file

File size
968 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0613 - Operational Works - Prescribed Tidal Work - Transport Type 5 (Jetty) [As Published].pdf · 968 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.