Original source · versioned page text
QB1910553 - STG 1 19 Ind Units - Lot 13 (#64) - QB1910553 - MISC - Form 11 Final & Supporting Certificates - 26.11.2021 KW
Very large file: it may take a few minutes
The original of this document is very large (10.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Construction and Establishment Sign-off Forms: Bioretention Systems Version 1.1, April 2010 The Construction and Establishment Sign-Off Forms: Bioretention Systems outline the key items to be reviewed when delivering and inspecting bioretention systems. The Sign-Off Forms follow the construction step-by-step sequences provided in Sections 3.9 and 3.10 of the Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2010, accessible from www.waterbydesign.com.au). The Sign-off Forms are to be used by contractors, construction site superintendents, designers and local authority compliance inspectors to ensure all the elements of the bioretention system have been constructed in accordance with the design. It is the responsibility of the site superintendent and contractor to ensure the most recent version of the forms are being used. The Sign-Off Forms provide the basis of the certification and compliance requirements for bioretention systems. They are designed for easy incorporation into asset databases managed by Councils or private organisations such as body corporates. The following Construction and Establishment Sign-Off Forms are provided in this document: * Bioretention System Construction and Establishment e Pre-Start Meeting Sign-Off Form e FORMA — Earthworks and Functional Structures ° FORM B — Under-drainage e FORM C -~ Bioretention Media e FORM D ~ Finished Levels * FORME — Coarse Sediment Forebay e FORM F — Protective Measures »° FORM G — Landscape Installation e FORM H — Landscape Establishment If an item receives an ‘N’ in the ‘Satisfactory Criteria’, indicating that an element is ‘not satisfactory’, appropriate actions must be specified to rectify the construction issue before final inspection sign-off is given. Disclaimer The material contained in this publication is produced for general information only. It is not intended as professional advice on specific applications. It is the responsibility of the user to determine the suitability and appropriateness of the material contained in this publication to specific applications. No person should act or fail to act on the basis of any material contained in this publication without first obtaining specific independent professional advice, The South East Queensland Healthy Waterways Partnership (SEQHWP) expressly disclaim all and any liability to any person in respect of anything done by any such person in reliance, whether in whole or in part, on this publication. The information contained in this publication does not necessarily represent those of the funding partners. CONSTRUCTION & ESTABLISHMENT SIGN-OFF FORMS — BIORETENTION SON CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS — BIORETENTION SYSTEMS 1 © Sout weensland Healthy Waterways Partnership 2010
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.