Original source · versioned page text
QB1910553 - STG 1 19 Ind Units - Lot 13 (#64) - QB1910553 - MISC - Form 11 Final & Supporting Certificates - 26.11.2021 KW
Very large file: it may take a few minutes
The original of this document is very large (10.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Correct mulch has been supplied AK Yes Mulch applied to correct depth and AK Yes secured Supplied plants are correct species AK Yes Supplied plants are in correct pot sizes and maturity (300 mm min) AK Yes Plants have been installed at correct AK Yes planting density (min 6 plants/m?) As constructed drawings marked up with final plant species and densities Mulch is clear of plant stems by approximately 50 mm AK Yes Comments (attach and refer to additional pages if necessary) NB: As constructed drawings and photos attached. Signed by superintendent: Print name: Date: AND Signed by bioretention designer: Print name: Date: FORM H — Landscape Establishment Purpose: To ensure the correct plants are supplied, installed and established. Items Checked Satisfactory Action (if unsatisfactory) Initial PLANT ESTABLISHMENT CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS — BIORETENTION SYSTEMS © South East Queensiand Healthy Waterways Partnership 2010 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.