Appendix D Geotechnical report · MCU18/0013
Attached to the e-mail Detached House - MCU18/0013.
JT wy SOIL SURVEYS PROJECT NO. 304-2014 NOVEMBER, 2004 GABRIEL & ELIZABETH POOLE DESIGN COMPANY GEOTECHNICAL INVESTIGATION PROPOSED RESIDENCE 26 ARAKOON CRESCENT SUNSHINE BEACH OFFICES IN BRISBANE, GOLD COAST AND SUNSHINE COAST
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 21 pages
Page 2
Soil Surveys Engineering Pty Limited Directors ew, Specialists in Applied Geotechnics PJ Dixon BE(Hons) RPEQ A.B.N. 70 054 043 631 PR Cosh BE(Civil) CPEng MIE Aust RPEQ. www.soilsurveys.com.au NT Perkins BAppSc(AppGeol) BEng(Hons1) ay MV Geale BEng(Civil) MBA CPEng MIE Aust RPEQ GEJ Gray SOIL SURVEYS Associates PElkington BE(Civil) AM Rutten BE(Honst) MEngSc LGE CPEng MIE Aust RPEQ SLGamble BE(Geol) CPEng MIE Aust RPEQ Sunshine Coast Office REF: 304-2014 Author: Brett Egen 30th November, 2004 Gabriel & Elizabeth Poole Design Company PO Box 1158 NOOSAVILLE QLD 4566 ATTENTION: MR DAN SPARKS Dear Sir, RE: GEOTECHNICAL INVESTIGATION - PROPOSED RESIDENCE 26 ARAKOON CRESCENT, SUNSHINE BEACH Enclosed is one copy of our report for the above project dated March, 2003. Three copies of the report have been issued to Gabriel & Elizabeth Poole Design Company. Authority to proceed with the investigation was received from Dan Sparks of Gabriel & Elizabeth Poole Design Company dated 19" October, 2004. Should you have any queries regarding this report, please do not hesitate to contact Stephen Gamble at our Sunshine Coast Office. Yours faithfully, R. COSH (RPEQ 1821) jhe for and on behalf of SOIL SURVEYS ENGINEERING PTY LIMITED Brisbane Gold Coast Sunshine Coast Level 2, 19 Finchley Street Unit 9, 39 Lawrence Drive 11 Production Avenue Milton Qid Nerang Qid Kawana Waters Qid PO Box 317 PO Box 2743. PO Box 2 Paddington Qld 4064 Nerang Qld 4211 Buddina Qid 4575 Australia Australia Australia Ph 617 3369 6000 Ph 617 5596 1528 Ph 617 5493 1980 Fax 617 3369 6660 Fax 617 5578 3916 Fax 617 5493 2837 [email protected] [email protected] [email protected]
Page 3
TABLE OF CONTENTS 1.0 INTRODUCTION ...........0 0.00 c cece cette eee 2.0 SCOPE OF GEOTECHNICAL SERVICES ...............-. 3.0 PROPOSED DEVELOPMENT ...............-..-++++55+++ 4.0 GEOTECHNICAL INVESTIGATION ..............-+-++++++ 4.1 Field Investigation ........... 0.0.60. cece cece eee 4.2 Site Description .......... 0.66.5 c eects 4.3 Laboratory Testing ........... 0.6.06 c eee eee e tenes 5.0 GEOTECHNICAL MODEL .................0.000 cece eee 5.1 Subsurface Profile ............ 0.6 ccc cece eens 5.2 Groundwater ........... 0500 e ccc eee nee ene 6.0 ENGINEERING ASSESSMENT .................-.-.50+55+ 6.1 Traffickability and Site Preparation ................+++5+: 6.2 Earthworks .......... 0.00 ccc nets 6.2.1 General ...... 20.000. 6.2.2 Subgrade Preparation ............+-+.++ see ee eens 6.2.3 Fill Material ...........0. 0000 cece cence eee 6.2.4 Compaction Standards ..............+-+++0+ +5000 6.2.5 Earthworks Supervision .............-.00.0002000+ 6.2.6 Excavation Characteristics ...............0..000es 6.2.7 Batters ©... 0... ent nnees 6.3 Building Foundations ...............-+ +2 see eee e eee ees 6.3.1 Site Classification .............0 0060 cece eee eee ee 6.3.2 High Level Footings ...........+-+:++s+e rece ences 6.3.3 Raft Foundation ............00. 00 c cence eee eee es 6.3.4 Deep Foundations .............0.0e cece eee eee 6.3.5 Construction Considerations ............-.++++++- 6.4 Slab On Ground ..........0. 0.60 c cece eens 6.4.1 General ........ 0.00 ccc nents 6.4.2 Sub-BaSe 0.0... tenets 6.5 Retaining Walls ............ 6.02 c cence ene 6.5.1 General .... 0.0... ccc eee eens 6.5.2 Pressure Distribution ..............00 0c cece eres 6.5.3 Water Regime ........... 6.620. e cence eee 6.5.4 Construction Considerations .............-..+++++ 6.5.5 Construction Details ............ 6.660 c cece eee 7.0 CONSTRUCTION INSPECTION .............-..0000 000 eee 8.0 LIMITATIONS. ........... 000. c cece cnet es
Page 4
TABLE OF CONTENTS APPENDICES A __ Notes Relating to this Report B Borehole Records Cc Site Plan
Page 5
Project No. 304-2014 November, 2004 Page 1 1.0 2.0 INTRODUCTION This report presents the results of the geotechnical investigation carried out by Soil Surveys Engineering Pty. Limited at the site of the proposed residence at 26 Arakoon Crescent, Sunshine Beach. The objective of this investigation were to assess subsurface conditions at the site in accordance with the Scope of Services detailed in Section 2.0. SCOPE OF GEOTECHNICAL SERVICES The scope of geotechnical services provided by Soil Surveys Engineering Pty Limited was directed towards evaluating the following items. * Investigation of the subsurface profile at the proposed location area by drilling, sampling and in-situ testing with four (4) boreholes. * Engineering analysis of site investigation and laboratory test results to evaluate:- - Foundation and slab recommendations - Retaining wall design recommendations - | Recommendations on site preparations - Construction recommendations (where applicable) PROPOSED DEVELOPMENT We understand that a three-storey residence is proposed. Based on the architectural plan included with the brief, the proposed building is to have suspended slab floors with the ground floor supported on deep foundations. Significant earthworks are expected for the proposed development, with a 6m retaining wall proposed along the western site boundary adjacent to Arakoon Crescent. # SOIL SURVEYS ENGINEERING
Page 6
Project No. 304-2014 November, 2004 Page 2 4.0 GEOTECHNICAL INVESTIGATION 4.1 Field Investigation Subsurface conditions at the site were investigated by drilling and sampling a total of four (4) boreholes to depths of between 3.3m and 12.0m. Two (2) boreholes were drilled to depths of 12.0m, where access was permitted for our Gemco HP7 top drive rotary drilling rig mounted on a 4x4 Mitsubishi Canter truck. In addition, where vehicle access was not permitted, two (2) boreholes were drilled to depths of 3.6m (HA3) and 3.3m (HA4) using hand auger equipment. Dynamic cone penetrometer (DCP) tests were carried out adjacent to the hand auger boreholes to depths of 5.0 meters. The classification of soils in the field is subjective, based on the experience and judgement of the supervising geotechnician and some variations in the soil description, from the actual material type may occur. The soil classification descriptions, field and laboratory testing were carried out in general accordance with the following Australian Standards. ° AS.1726 - 1993 Geotechnical Site Investigations . AS.1289 Methods of Testing Soils for Engineering Purposes A description of the investigation method, borehole records and a site plan showing the location of the boreholes are included in the Appendices. 4.2 Site Description The site is located at 26 Arakoon Crescent, Sunshine Beach. The site is on the eastern side of the street. At the time of the investigation, the land was seen to slope down from the street frontage at an angle of approximately 20 degrees, and became relatively level at the bottom of the site. The ground surface was partially grassed with medium sized trees located adjacent to the access track which traversed down across the site from the street frontage. # SOIL SURVEYS ENGINEERING
Page 7
Project No. 304-2014 November, 2004 Page 3 Photograph 1 taken from the northern boundary indicates typical site conditions. PHOTOGRAPH 1 4.3 Laboratory Testing Due to the sandy nature of the subsurface profile, laboratory testing was not required for this investigation. The nature of the soils was measured by field testing only. 5.0 GEOTECHNICAL MODEL 5.1 Subsurface Profile The subsurface profile encountered in the two deep drilled boreholes consisted of fine to medium grained sand inferred to be deposited as a beach ridge dune. The consistency of the sand was seen to be medium dense sands for the upper 3.5 to 3.8 meters overlying dense to very dense indurated sand. Dense to very dense sand was encountered at depths of 5.7m and 6.3m beneath the indurated sands,. The hand auger boreholes encountered similar fine to medium grained sand, but with some gravelly sand fill material to a depth of 0.85m in borehole HA3. Dynamic cone penetrometer soundings indicate medium dense sand conditions to depths of between 4.8m and 4.9m and becoming dense below this level. A summary of the subsurface profile is presented in Table 1 with detailed borelogs included in Appendix B. # SOIL SURVEYS ENGINEERING
Page 8
Project No. 304-2014 November, 2004 Page 4 TABLE 1 SUMMARY OF THE SUBSURFACE PROFILE Material BH 1 BH2 HA3 HA 4 Fill (Gravelly Sand)|Medium Dense to Dense - - 0.00 - 0.85 - (m) Natural SAND (m) |Medium Dense 0.00 - 3.80] 0.00 - 3.50} 0.85- TD | 0.00 - TD Dense to Very Dense 3.80-TD | 3.50- TD - - Borehole Termination (m) 12.00 12.00 3.60 3.30 DCP Termination (m) - - 5.20 5.10 5.2 Groundwater Groundwater was not encountered in the boreholes at the time of the investigation. However, some seepage through the upper material may occur following periods of extended heavy rainfall. # SOIL SURVEYS ENGINEERING
Page 9
Project No. 304-2014 November, 2004 Page 5 6.0 ENGINEERING ASSESSMENT 6.1 Traffickability and Site Preparation At the time of the field investigation, the site was only accessible (by vehicle) using the existing access track which crosses the site diagonally from the street frontage. Traffickability problems may be further exacerbated with the disturbance of the upper level soil fabric with removal of vegetation. It is recommended that after stripping, clearing and grubbing, the exposed surface in the construction area be proof rolled and compacted to improve traffickability., although it is noted that this would only apply to the lower parts of the site where excavation is minimal. Maintaining adequate surface drainage conditions is essential to ensure that runoff is diverted away from the construction area to prevent erosion. The contractor should fully inform himself of the ground conditions, on site, prior to commencement of earthworks. This requirement should be explicit in any earthworks specifications or contract. 6.2. Earthworks 6.2.1 General It is understood that the proposed earthworks will consist of cuts of up to 6.0 meters to establish the proposed building platform. Earthwork procedures should be carried out in a responsible manner in accordance with AS.3798-1996 “Guidelines on Earthworks for Commercial and Residential Developments". 6.2.2. Subgrade Preparation Subgrade preparation procedures should include the following:- * Clearing, stripping and grubbing should be carried out in areas subject to earthworks. Also all soils containing organic matter should be stripped from the construction area; this material is not considered suitable for use as structural fill. * Depressions formed by the removal of vegetation, existing structures, underground elements etc. should have all disturbed weakened soil cleaned out and be backfilled with compacted select material. #F SOIL SURVEYS ENGINEERING
Page 10
Project No. 304-2014 November, 2004 Page 6 The subgrade should be proof rolled (where appropriate) under the supervision of Soil Surveys Engineering using a vehicle with a tare of at least 5 tonnes and then compacted to the required degree. In areas of cut, proof rolling may be deferred until after the cut operation. Areas demonstrating excessive movement should be treated (dried and recompacted) or removed and replaced with compacted fill. Treatment should be to a standard sufficient so that the subgrade passes proof rolling and that compaction can be achieved in the first layer of fill. 6.2.3 Fill Material While it is noted that significant filling is not anticipated, backfilling around the proposed in-ground water tank should be carried out in accordance with AS.3798-1996, and the following should be noted: The insitu soils, where free of organic and deleterious material, may be used for structural fill provided the moisture content of the soils on placement approximates the optimum moisture content required for compaction. This may require conditioning to bring the soils to optimum. Any imported fill, if needed to make up earthwork deficiencies, should have a soaked CBR of not less than 10 percent and a maximum aggregate size of not greater than 75mm with not more than 20% greater than 20mm. 6.2.4 Compaction Standards Guidelines for minimum relative compaction values for insitu soils and imported fill for the building and pavements are presented in Table 2. TABLE 2 COMPACTION RECOMMENDATIONS Location Minimum Density Index Building Area 70 * Field density testing should be carried out to check the standard of compaction achieved and the placement moisture content. The frequency and extent of testing should be as per guidelines in AS.3798-1996, Section 8.0. Backfilling for service trenches etc. should use good quality material free of organic and deleterious matter, either select fill won from site or imported fill. The backfill should be placed in uniform layers over the full width of the excavations with the layers not exceeding 200mm thickness, loosely placed. The backfill material should be compacted to the specifications outlined above for insitu or imported cohesive material. # SOW SURVEYS ENGINEERING
Page 11
Project No. 304-2014 November, 2004 Page 7 6.2.5 Earthworks Supervision Given the building type and the nature of the earthworks operation associated with the in-ground water tank, it is recommended that earthworks operations be carried out under geotechnical engineering supervision as set out in Appendix B of AS.3798-1998. It should be made clear in any earthworks specification as to what is actually required of the Engineer/Supervisor/Geotechnical Testing Authority to provide in terms of certification. It is recommended that the following objectives (as a minimum) be incorporated into the earthworks specification:- * Certification that all general earthworks operations (ie. stripping, proof rolling of subgrade, etc.) have been carried out in accordance with the earthworks specification. * Certification that uncontrolled fill has been replaced (if required) and compacted to the required minimum density in accordance with the earthworks specification. ° Certification that the controlled fill material is suitable to support a conventional slab on ground floor (slab loads of 10 to 15kPa). * Certification that the quality of any imported fill complies with the earthworks specification requirements. Engineering certification should be provided by a Registered Professional Engineer of Queensland. 6.2.6 Excavation Characteristics It is anticipated that excavations will consist of the following:- * Bulk Cuts - for site stripping and excavation to create basements, building platforms and carpark/driveway areas. * Trenching - for high level footings and underground services. * Drilling - for bored pier foundations. Excavations on site should be within the capabilities of light plant, small dozer (Cat D4c or similar) in bulk cuts and a medium sized backhoe (Case 580 or similar) or small excavator (12t - 15t) in trenching, based on the investigation findings. Should substantial excavations be required, larger plant could be budgeted to expedite workings. # SOW SURVEYS ENGINEERING
Page 12
Project No. 304-2014 November, 2004 Page 8 6.2.7 Batters Maximum batter angles for different material types are outlined in Table 3 for the unsurcharged temporary cut and fill batters less than 3m high on the site. Where surcharges (eg. footings, live loads, etc.) are located within H (height of batter) of the top of the batter, then some reduction in design angle will occur. Steeper batters are possible with suitable surface protection such as stone pitching, etc. or by use of retaining structures (temporary and permanent). Fill batter slopes are dependent on suitable compaction being achieved. TABLE 3 BATTER ANGLES (Slopes less than 3m high) Material Batter Angle Loose Sand 24 degrees (1V:2.25H) Medium Dense Sand 26 degrees (1V:2H) Dense to Very Dense Sand 28 degrees (1V:1.9H) Notes: 1. These values assume no seepage. If seepage is present the recommended angles would need to be significantly reduced or the use of dewatering considered. 2. Subject to inspection by an experienced geotechnical engineer/engineering geologist. It is essential that any batters be suitably protected from erosion and scour by appropriate drainage and placement of plastic or hession sheeting, etc. Pavement runoff should not be allowed to discharge directly across the batters without suitable scour protection. 6.3 Building Foundations 6.3.1 Site Classification While a site classification in accordance with AS.2870 ‘Residential Slabs and Footings' relates to conventional residential type construction and is not directly applicable for this development, it is, however, a valuable method of classification. Given the sandy nature of the site, the site may be designated Class 'A’ (non reactive) in accordance with AS.2870.1-1996 'Residential Slabs and Footings’, where ground surface movement is not expected to occur with changes in soil moisture content. It is recommended that the designers satisfy themselves that the use of AS.2870 is applicable for the proposed design. # SOIL SURVEYS ENGINEERING
Page 13
Project No. 304-2014 November, 2004 Page 9 6.3.2 High Level Footings Table 4 outlines allowable bearing capacities for high level footings on the site. TABLE 4 ALLOWABLE BEARING CAPACITIES FOR HIGH LEVEL FOOTINGS Material Allowable Bearing Capacity (kPa) Strip Footing Pad Footing Sand - Loose NR NR - compacted to 70% Density Index 125 150 - Medium Dense 125 150 - Dense 200 250 - Very Dense 350 500 The base of all pad and strip footings should be individually recompacted using a vibrating plate compactor prior to placement of reinforcing steel and concrete as soils may be loosened during the excavation process by machinery action. If the sand is dry, it should be saturated and left for a short period prior to vibration. Should any loose areas be encountered in the footing excavations the density of these areas must be improved. If any doubt exists as to whether ground improvement has achieved the required density of 70% density index for support of the proposed building loads, further testing in the way of dynamic cone penetrometer tests should be carried out to confirm the adequacy of the founding soils. 6.3.3 Raft Foundation Where sensitive and heavy masonry construction is proposed, consideration may be given to the use of a raft foundation to reduce the effects of the differential settlements. Compaction of the sand foundation as per high level footings is recommended. Due to the raft size, bearing capacity failure is unlikely, however to limit local overstressing a maximum design allowable bearing pressure of 125kPa should be adopted based on 70% density index being achieved for a minimum distance of 1.0m below foundation level. Rafts have an advantage over individual strip and pad footings in that the effect of an isolated loose area is much less under a raft than under an individual strip or pad footing. # SOIL SURVEYS ENGINEERING
Page 14
Project No. 304-2014 November, 2004 Page 10 Footing bases should be individually recompacted, eg. by vibrating plate compactor, to remedy disturbance of the sand foundation during excavation. Testing of footing bases is recommended to confirm the compaction status of the foundation. If footing beams cannot be cast on the same day as excavation, a concrete blinding layer of at least 50mm thickness is recommended across the footing base. 6.3.4 Deep Foundations Deep foundations using piles are considered as an alternative solution for the proposed residence. The choice of suitable pile types should be made from non-vibration piling methods. Push-in preformed piles, continuous flight auger (CFA) or bored piles are considered suitable pile types, although the construction of the latter may be problematic in loose sand, where collapse of the pile hole is likely. Depending on the load requirements, and the piling contractors design, it is recommended that the piles are founded in material which is at least medium dense, and at a minimum depth of 3m below existing ground surface. The design of piles in cohesionless soils may be carried out using the following method: Ou =Q0+Qs ultimate pile resistance where: QO» =Ap-Pa- (Ng -1) ultimate base resistance QO; =As+pa+ Ks + (tand) ultimate skin friction As;= area of pile shaft Ap= __ areaof pile base Pa= effective overburden pressure at depth d Pa= average effective overburden pressure K,= lateral earth pressure coefficient 6 = __ pile-soil angle of friction N,= bearing capacity factor (Nq = 60 for medium dense sands, N, = 100 for dense sands) # SOIL SURVEYS ENGINEERING
Page 15
Project No. 304-2014 November, 2004 Page 11 Broms (1966) relates the lateral earth coefficient (K) and pile-soil friction angle (6) to the internal angle of friction of the soil (¢)and pile material as follows: TABLE 5 LATERAL EARTH COEFFICIENTS Pile Material 3 Ks Loose Medium Dense Dense Steel 20° 0.5 0.75 Concrete 0.75*¢ 1 1.5 2 It should be noted that the calculated ultimate resistance of a given pile should also take into account the installation effects of that particular type, i.e. whether displacement or non-displacement pile performance can be expected. According to the limit state design approach in AS2159-1995 (Piling Code), the design geotechnical strength R,* is calculated by multiplying the ultimate geotechnical strength Rug (which is equivalent to Q. above) by the geotechnical strength reduction factor ($s). For static design for piles on this project, we would consider $y = 0.45 to be appropriate. Uplift and lateral capacities of piles are not considered, as these are both wholly dependent on the specific pile type selected. 6.3.5 Construction Considerations Inspections It is recommended that inspections be undertaken by an experienced and qualified geotechnical engineer following footing excavations to confirm the adequacy of the founding soils. Inspections should be carried out prior to placement of reinforcing steel and ordering of concrete. Underground Services Where footings are located adjacent to underground services, the footings should extend to base a minimum of 200mm below the trench base level for a distance of 1.0m out from the trench. Beyond 1.0m the footings should be taken a minimum of 200mm below an imaginary line drawn up at 45° from the trench base level (Figure 1). # SOW SURVEYS ENGINEERING
Page 16
Project No. 304-2014 November, 2004 Page 12 These requirements do not override minimum footing levels. (— > 1 . 1 &< Service [4 ss Trench £ 7 Found footings below these lines \ FIGURE 1 ) High Level Footings It is recommended that the footings be poured as soon as possible following excavation. Where the footings cannot be poured within a short period of time it is recommended that a blinding layer of concrete, at least 50mm thick, be placed immediately following excavation, cleaning and inspection of the footing bases. Piles As mentioned above, both cast insitu or preformed piles may be suitable on this site. However, given the sandy soils, it is unlikely that unsupported bored pile excavation could be successfully achieved. Casing or other forms of hole support would be necessary for conventional bored piles. Continuous flight auger (CFA) piles may be a suitable alternative cast insitu type pile. This type has the advantage of not requiring any casing or other support, even when drilling loose sand. Preformed driven or pushed piles may also be suitable, however the environmental constraints that may be present at this site might preclude driven piles due to the noise and vibration associated with this method. Pushed-in piles avoid these problems, but a push-in rig of sufficient reaction capacity may not be able to successfully negotiate the sloping site. # SOU SURVEYS ENGINEERING
Page 17
Project No. 304-2014 November, 2004 Page 13 6.4 Slab On Ground 6.4.1 General The field test results indicate that the existing natural soils, along with any controlled fill, are suitable for slab on ground construction provided that site preparation earthworks are carried out in accordance with recommendations in Sections 6.1 and 6.2. In addition, as noted in Section 6.3.1, the slab on ground floor should be designed to accommodate the anticipated potential ground surface movement. 6.4.2 Sub-Base It is suggested that a 150mm layer of sub-base be provided under all concrete slabs. The sub-base material should be compacted to a density not less than 95% of maximum dry density in accordance with AS.1289 5.2.1 (Modified compaction). The sub-base is provided under a concrete slab to:- * Provide a stable ‘working platform’ on which to operate construction equipment; * Facilitate the provision of a uniform bearing surface under the slab. Sub-base material should be of good quality conforming to requirements (minimum) of Material Type 2.4 as specified in the Queensland Department of Transport, Standard Specification MRS 11.05, Unbound Pavements (December, 1993). 6.5 Retaining Walls 6.5.1 General It is understood that retaining walls would be required for the construction of the proposed ground floor. We understand the expected maximum retained height will be up to 6 metres. The lateral earth pressure distribution that effects the retaining walls on the site will depend upon the following parameters :- ¢ Insitu and backfill material properties * Design water regime at the rear of the wall ¢ Wall and cut geometry * Surcharges effecting the wall ¢ Wall type * The structural bracing of the wall and the timing of backfilling behind the wall #F SOIL SURVEYS ENGINEERING
Page 18
Project No. 304-2014 November, 2004 Page 14 Given that the excavation is expected to be up to 6m deep, a braced retaining wall will be required. This retaining wall should be installed prior to excavation to ensure stability of the sandy profile. Several types of retaining walls could be employed including steel sheet piles, contiguous CFA piles or diaphragm wall. Each of these have relative advantages and disadvantages (technical and economic) which are best evaluated at the detailed design/tender stage. 6.5.2 Pressure Distribution In designing the retaining wall, consideration should be given to the following:- * For cantilever walls, which allow some movement at the top, (ie. at least 0.001H in sand) the active case (Ka) applies with a triangular distribution in both the short and long term situations. * For cantilever walls which cannot tolerate this movement, the at rest case (Ko) applies with a triangular distribution in both the short and long term situations. * For structurally braced walls the wall design should be checked for both a trapezoidal (short term conditions) and triangular distribution with Ko values (long term conditions). The pressure distributions as referred to above are shown in Figures 2 and 3. The parameters selected for use in the figures are dependent on the preconstruction geometry of the face being retained. Where the material has been cut using the recommendations (or a flatter) as outlined in section 6.2.7, the backfill parameters will control. Where a steeper angle is used the earth parameters will control. The lateral pressure distributions shown in Figures 2 and 3 include hydrostatic pressure and show typical surcharge loadings pressure distribution. It is recommended that where the retaining walls are expected to be surcharged (eg. by footings, traffic loads, sloping ground surface, etc.) Soil Surveys Engineering should be contacted to provide a recommended lateral earth pressure distribution. As a general guide (using an elastic model) line loads located 2.5H away from the wall (where H is the wall height) results in lateral forces of less than 10% of the line load. Parameters for assessment of lateral earth pressures are outlined in Table 6. # SOIL SURVEYS ENGINEERING
Page 19
Project No. 304-2014 November, 2004 Page 15 (— TRIANGULAR DISTRIBUTION \ Lateral Earth Pressure Lateral Pressure Due to Surcharge KyH + hwy w(1-K) K = appropriate earth pressure coefficent UDL Point Load or H = Vertical height of the wall ( ‘ hw = Height of design water table Strip Footing Y = Soil bulk density (kKN/m3) yw = Water bulk density (kKN/m3) . — r ‘ TRAPEZOIDAL DISTRIBUTION Lateral Pressure Hydrostatic Due to Surcharge Pressure H + + + 0.65 KayH hwy Sand or Gravel UDL Point Load or Strip Footing LO FIGURE 3 — # SOIL SURVEYS ENGINEERING
Page 20
Project No. 304-2014 November, 2004 Page 16 TABLE 6 RETAINING WALL DESIGN PARAMETERS Material Density Earth Pressure Coefficient Long Term (kNim’) Flat Top Slope Top Slope 1V:4H__ | Drained (degrees) Ka Ko Ka Ko Compacted Fill * 19 0.41 0.58 0.46 0.76 25 Fill? 17 0.27 0.43 0.31 0.56 35 Loose Sand 17 0.33 0.50 0.37 0.66 30 Medium Dense Sand 18 0.29 0.46 0.33 0.60 33 Dense Sand 20 0.27 0.43 0.31 0.56 35 Very Dense Sand 22 0.21 0.36 0.27 0.47 40 Notes: 1. If fill is compacted against a retaining wall the actual earth pressure could exceed the vertical pressure (ie. Ka > 1.0). 2. Infers granular free draining material placed behind the retaining wall as a drainage layer. 6.5.3 Water Regime Not withstanding the absence of groundwater in all the boreholes and due to possible long term problems with blocking of gravel filters and drains and short term storm conditions that could flood the fill behind retaining walls, it is recommended that all retaining walls be designed for some water pressure distribution. A suggested water pressure distribution for retaining walls on this site would be one third height water pressure. 6.5.4 Construction Considerations A suitable temporary support system must also be determined to ensure the stability of the retaining wall during excavation for the proposed basement. It is expected that temporary ground anchors would be required to provide lateral restraint for the wall. In the long term, this lateral restraint would be provided by the basement slab floors propping the wall. It is expected that the temporary anchors would be installed in several rows, at staged intervals during the excavation of the basement. The design of number of rows, spacing of anchors and required anchor capacity, would be determined by the retaining wall designer. #F SOW SURVEYS ENGINEERING
Page 21
Project No. 304-2014 November, 2004 Page 17 6.5.5 Construction Details With all retaining walls, it is essential that adequate drainage be provided behind the wall. Any backfill placed behind the wall should be loose granular material. The backfill should not be heavily compacted since research has shown that compaction can raise the earth pressure to above the ‘at rest’ pressure. A permeable geofabric should be placed between the natural soils and the loose granular backfill to prevent fine material piping out of the natural soils and blocking the backfill. During installation of any retaining walls, the insitu soils should be battered back to minimise fall-in and subsequent disruption of works. Temporary batter angles are given in Section 6.2.7. Suitable precautions to satisfy Health & Safety requirements must also be adhered to; a maximum unsupported height of 1.5m is recommended. CONSTRUCTION INSPECTION It is recommended that placement of all structural fill, footing excavations, and cut batter slopes in soil together with building subgrades should be inspected by Soil Surveys Engineering Pty Limited. or a duly qualified Geotechnical Engineer. Should subsurface conditions other than those described in this report be encountered, Soil Surveys Engineering Pty Limited. should be consulted immediately and appropriate modifications developed and implemented if necessary. # SOIL SURVEYS ENGINEERING
Page 22
Project No. 304-2014 November, 2004 Page 18 8.0 LIMITATIONS We have prepared this report for the use of GABRIEL & ELIZABETH POOLE DESIGN COMPANY, for design purposes in accordance with generally accepted geotechnical engineering practices. No other warranty, expressed or implied, is made as to the professional advice included in this report. This report has not been prepared for use by parties other than GABRIEL & ELIZABETH POOLE DESIGN COMPANY or their associated consultants. It may not contain sufficient information for purposes of other parties or for other uses. Soil Surveys Engineering offer a documentation review service to verify that the intent of geotechnical recommendations is properly reflected in the design. It is recommended that the client avail themself of this service; our standard rates will apply. 4 / [re /P. R. COSH (RPEQ 1821) S. L. GAMBLE (RPEQ 6644) PRINCIPAL ENGINEER SUNSHINE COAST MANAGER for and on behalf of SOIL SURVEYS ENGINEERING PTY LIMITED # SOIL SURVEYS ENGINEERING
Used in these records