SARA reference:        2202-27255 SRA
Council reference:     OPW22/0029
Applicant reference:   Noosa Oyster Project



7 April 2022

Chief Executive Officer
Noosa Shire Council
PO Box 141
Tewantin Qld 4565
[email protected]

Attention:       Mark Lewis


Dear Mr Lewis


SARA response—1B Serenity Close and 1, 3, 11, 13 and 15
Natasha Avenue Noosa Heads, Goat Island, Noosa North
Shore and 9 Pelican Street, Tewantin
(Referral agency response given under section 56 of the Planning Act 2016)

The development application described below was confirmed as properly referred by the State
Assessment and Referral Agency (SARA) on 10 February 2022.


Response
Outcome:                             Referral agency response – with conditions.
Date of response:                    7 April 2022
Conditions:                          The conditions in Attachment 1 must be attached to any
                                     development approval.
Advice:                              Advice to the applicant is in Attachment 2.
Reasons:                             The reasons for the referral agency response are in Attachment 3.


Development details

Description:                         Development permit        Operational work for prescribed tidal works
                                                               (Habitat restoration / enhancement in the
                                                               Noosa River)


                                                                             South East Queensland (North) regional
                                                                             office
                                                                             Mike Ahern Building, Level 3, 12 First
                                                                             Avenue, Maroochydore
 Page 1 of 13                                                                PO Box 1129, Maroochydore QLD 4558
Log in to download the original file

2202-27255 SRA - Response with conditions.pdf · 423 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 12 pages

Page 2

                                                                                                  2202-27255 SRA




SARA role:                              Referral agency
SARA trigger:                           Schedule 10, Part 17, Division 3, Table 1 (Planning Regulation 2017)

                                        Tidal works in a coastal management district

                                        Schedule 10, Part 17, Division 3, Table 2 (Planning Regulation 2017)

                                        Tidal works in a coastal management district

                                        Schedule 10, Part 6, Division 2, Subdivision 3, Table 1 (Planning
                                        Regulation 2017)

                                        Works in a declared fish habitat area

                                        Schedule 10, Part 6, Division 3, Subdivision 3, Table 1 (Planning
                                        Regulation 2017)

                                        Removal, destruction or damage of marine plants
SARA reference:                         2202-27255 SRA
Assessment Manager:                     Noosa Shire Council
Street address:                         1B Serenity Close and 1, 3, 11, 13 and 15 Natasha Avenue Noosa
                                        Heads, Goat Island, Noosa North Shore and 9 Pelican Street,
                                        Tewantin
Real property description:              604SP188270; 35MCH4795; 326CP855842; 1RP92804; 1RP97493;
                                        3RP106422; 5SP234718; 7RP107007; 0SP103385; 0BUP13469;
                                        0BUP8432; 0BUP2048; 2RP106422
Applicant name:                         The Nature Conservancy Ltd
Applicant contact details:               PO Box 306
                                         Main Beach QLD 4217
                                         [email protected]


Representations
An applicant may make representations to a concurrence agency, at any time before the application is
decided, about changing a matter in the referral agency response (s.30 Development Assessment Rules)
Copies of the relevant provisions are in Attachment 4.

A copy of this response has been sent to the applicant for their information.

For further information please contact Danika Cowie, Principal Planning Officer, on (07) 5352 9776 or via
email [email protected] who will be pleased to assist.

Yours sincerely




Jamaica Hewston
Manager

cc      The Nature Conservancy Ltd, [email protected]



 State Assessment and Referral Agency                                                                Page 2 of 13

Page 3

                                                              2202-27255 SRA



enc     Attachment 1 - Referral agency conditions
        Attachment 2 - Advice to the applicant
        Attachment 3 - Reasons for referral agency response
        Attachment 4 - Representations provisions
        Attachment 5 - Approved plans and specifications




 State Assessment and Referral Agency                           Page 3 of 13

Page 4

                                                                                                       2202-27255 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)


 No.     Conditions                                                                     Condition timing
 Operational work for prescribed tidal works (habitat restoration)
 10.17.3.2.1—The chief executive administering the Planning Act 2016 nominates the Director-General
 of the Department of Transport and Main Roads (Maritime Safety Queensland) to be the enforcement
 authority for the development to which this development approval relates for the administration and
 enforcement of any matter relating to the following conditions:
 1.      The development must be carried out generally in accordance with               At all times
         the following plans:
             (a) General Notes and Site Selection prepared by International
                  Coastal Management dated 09/07/2021, Drawing Number
                  NROR-2021-00 Revision A.
             (b) Module Designs prepared by International Coastal
                  Management dated 09/07/2021, Drawing Number NROR-
                  2021-02 Revision A.
             (c) Phase 1 – Goat Island Restoration Site prepared by
                  International Coastal Management dated 09/07/2021,
                  Drawing Number NROR-2021-03 Revision A as amended in
                  red by SARA dated 07/04/2022.
             (d) Phase 1 – Tewantin Restoration Site prepared by
                  International Coastal Management dated 09/07/2021,
                  Drawing Number NROR-2021-04 Revision A as amended in
                  red by SARA dated 07/04/2022.
             (e) Phase 1 – Noosa Sound West Restoration Site prepared by
                  International Coastal Management dated 09/07/2021,
                  Drawing Number NROR-2021-05 Revision A.
             (f) Phase 1 – Noosa Sound East Restoration Site prepared by
                  International Coastal Management dated 09/07/2021,
                  Drawing Number NROR-2021-06 Revision A.
 2.      The development must be carried out generally in accordance with               For the duration of
         the Noosa Oyster Ecosystem Restoration Project - Project                       works
         Restoration Plan prepared by The Nature Conservancy Australia
         dated January 2022, as amended in red by SARA dated 07/04/2022
 3.      All vessels, structures, plant and equipment associated with the               While the works are
         construction of the approved works must be lit/marked in accordance            occurring
         with the following specifications and requirements such that
         undertaking the construction works does not cause a risk to the safe
         navigation of ships:

         (a) any anchors deployed must be marked with yellow buoys and
         fitted with FL yellow lights fitted

         Lighting provided must not obscure, disguise or otherwise interfere
         with the effectiveness of navigational lighting.
 10.17.3.2.1— The chief executive administering the Planning Act 2016 nominates the Director-General
 of the Department of Environment and Science to be the enforcement authority for the development to
 which this development approval relates for the administration and enforcement of any matter relating
 to the following conditions:


 State Assessment and Referral Agency                                                                    Page 4 of 13

Page 5

                                                                                             2202-27255 SRA




4.      The construction of the oyster reefs must be undertaken generally in      For the duration of the
        accordance with the following plans:                                      works.
            General Notes and Site Selection prepared by International
               Coastal Management dated 09/07/2021, Drawing Number
               NROR-2021-00 Revision A.
            Module Designs prepared by International Coastal
               Management dated 09/07/2021, Drawing Number NROR-
               2021-02 Revision A.
            Phase 1 – Goat Island Restoration Site prepared by
               International Coastal Management dated 09/07/2021,
               Drawing Number NROR-2021-03 Revision A.
            Phase 1 – Tewantin Restoration Site prepared by
               International Coastal Management dated 09/07/2021,
               Drawing Number NROR-2021-04 Revision A.
            Phase 1 – Noosa Sound West Restoration Site prepared by
               International Coastal Management dated 09/07/2021,
               Drawing Number NROR-2021-05 Revision A.
            Phase 1 – Noosa Sound East Restoration Site prepared by
               International Coastal Management dated 09/07/2021,
               Drawing Number NROR-2021-06 Revision A.
5.      For the proposed works, only use clean materials and ensure that          For the duration of the
        the works do not cause contamination.                                     works.
6.      Erosion and sediment control measures which are in accordance             For the duration of the
        with Best Practice Erosion and Sediment Control (BPESC)                   works.
        guidelines for Australia (International Erosion Control Association),
        are to be installed and maintained to prevent the release of sediment
        to tidal waters.
7.      Should the oyster reef structures collapse, fail or otherwise suffer      As soon as reasonably
        structural consequences which impact their integrity or ability to        practicable subsequent
        function as intended, the works must be:                                  to the damage.
           a. reinstated in accordance with this development approval; or
           b. removed and disposed of at an appropriately licensed facility.
8.      Submit “As Constructed drawings” to [email protected] or mail           Within two (2) weeks of
        to:                                                                       the completion of the
            Department of Environment and Science                                 works.
            Permit and Licence Management
            Implementation and Support Unit
            GPO Box 2454
            Brisbane Qld 4001
9.       (a)    In the event that the works cause disturbance or oxidisation of   (a)   Upon
                acid sulfate soil, the affected soil must be treated and                disturbance or
                thereafter managed (until the affected soil has been                    oxidisation until
                neutralised or contained) in accordance with the current                the affected soil
                Queensland Acid Sulfate Soil Technical Manual: Soil                     has been
                management guidelines, prepared by the Department of                    neutralised or
                Science, Information Technology, Innovation and the Arts,               contained.
                2014.
                                                                                  (b)   At the time the
         (b)    Certification by an appropriately qualified person,                     soils have been
                confirming that the affected soil has been neutralised or               neutralised or


State Assessment and Referral Agency                                                           Page 5 of 13

Page 6

                                                                                                       2202-27255 SRA




                contained, in accordance with (a) above is to be provided to                  [email protected] or mailed to:

                  Department of Environment and Science
                  Permit and Licence Management
                  Implementation and Support Unit
                  GPO Box 2454
                  Brisbane Qld 4001

        Note: Appropriately qualified person means a person or persons who has
        professional qualifications, training, skills and experience relevant to soil
        chemistry or acid sulfate soil management and can give authoritative
        assessment, advice and analysis in relation to acid sulfate soil management
        using the relevant protocols, standards, methods or literature.
10.6.2.3.1.1 and 10.6.3.3.1.1 — The chief executive administering the Planning Act 2016 nominates
the Director-General of the Department of Agriculture and Fisheries to be the enforcement authority for
the development to which this development approval relates for the administration and enforcement of
any matter relating to the following conditions:
10.     Development authorised under this approval is limited as follows:               At all times
            Operational work for the temporary removal, destruction or
               damage of marine plants for placement of oyster reef base
               being limited to 479m2 of macroalgae and shown in Phase 1
               – Tewantin Restoration Site, International Coastal
               management, 05 Aug 2021, NROR-2021-04, Revision A and
               amended in red by SARA dated 07/04/2022.
        AND
            The operational works within the Noosa River declared Fish
               Habitat Area Management A being limited to trial restoration
               of oyster reefs 2,504m2 in area and installation of
               navigational and educational signage if required and shown
               in the following plans:
                Phase 1 – Tewantin Restoration Site, International
                    Coastal management, 05 Aug 2021, NROR-2021-04,
                    Revision A and amended in red by SARA, dated
                    07/04/2022; and
                Phase 1 – Goat Island Restoration Site, International
                    Coastal management, 05 Aug 2021, NROR-2021-03,
                    Revision A and amended in red by SARA dated
                    07/04/2022.
11.     The reef construction and sediment control must be carried out                  For the duration of
        generally in accordance with Sections 6.1 and 6.4 of Noosa Oyster               works
        Ecosystem Restoration Project - Project Restoration Plan prepared
        by The Nature Conservancy Australia dated January 2022, amended
        in red by SARA dated 07/04/2022.
12.     Maintain the signage and navigation markers development in                      At all times
        accordance with the plans referenced in condition 10, and the
        requirements of any conditions included in this referral agency
        response.
13.     Provide written notice to [email protected], when the                At least 5 business
        development authorised under this approval:                                     days but no greater
        (a)     will start, and                                                         than 20 business days
        (b)     when it has been completed.                                             prior to the



State Assessment and Referral Agency                                                                     Page 6 of 13

Page 7

                                                                                                       2202-27255 SRA




        These notices must state this permit number 2202-27255 SRA.                     commencement of the
                                                                                        works

                                                                                        Within 15 business
                                                                                        days of the completion
                                                                                        of the fisheries
                                                                                        development works
14.     Spoil or construction debris is not disposed of on tidal lands or within        At all times
        waterways and is managed to prevent acid soil development.
15.     This fisheries development (as defined by the Fisheries Act 1994)               At all times
        constitutes a place that is required to be open for inspection by an
        inspector at all times, pursuant to section 145 of the Fisheries Act
        1994.
16.     Marine plants that are temporarily removed, damaged or destroyed                Within 5 years of
        by this development must be restored to pre-disturbance condition.              removal, damage or
                                                                                        destruction of the
        Note: Marine plants are matters of State environmental significance under       marine plants.
        the Environmental Offsets Act 2014. Due to the claims that restoration will
        occur made in this development application these have not been included in
        a significant residual impact for the purpose of calculating an environmental
        offset for this development. Failure to rehabilitate or restore these marine
        plants within 5 years will represent unlawful removal damage or destruction
        of marine plants under the Fisheries Act 1994 from that date.
17.     The area shown as the ‘buffer zone’ from mangroves and seagrass                 Prior to
        on plans:                                                                       commencement of the
         Phase 1 – Tewantin Restoration Site, International Coastal                    works and maintained
                                                                                        until their completion
             management, 05 Aug 2021, NROR-2021-04, Revision A and
             amended in red by SARA dated 07/04/2022; and
         Phase 1 – Goat Island Restoration Site, International Coastal
             management, 05 Aug 2021, NROR-2021-03, Revision A and
             amended in red by SARA, dated 07/04/2022
        is to be clearly marked with corner pegs and/or buoys and protected
        with sediment curtains if required to prevent development works and
        associated activities (sedimentation access) from entering the ‘buffer
        zone’.
18.     Mark with corner pegs and/or buoys, the boundary of the approved                Until completion of the
        tidal component of the development footprint, as shown on:                      installation of rock and
              Phase 1 – Tewantin Restoration Site, International Coastal               any signage.
                 management, 05 Aug 2021, NROR-2021-04, Revision A and
                 amended in red by SARA dated 07/04/2022; and
              Phase 1 – Goat Island Restoration Site, International Coastal
                 management, 05 Aug 2021, NROR-2021-03, Revision A and
                 amended in red by SARA dated 07/04/2022.
19.     Tidal land profiles that are temporarily disturbed by the development           Upon completion of the
        works (other than those within the permanent development footprint),            works the subject of
        as shown on:                                                                    this approval
             Phase 1 – Tewantin Restoration Site, International Coastal
                 management, 05 Aug 2021, NROR-2021-04, Revision A and
                 amended in red by SARA dated 07/04/2022; and
             Phase 1 – Goat Island Restoration Site, International Coastal
                 management, 05 Aug 2021, NROR-2021-03, Revision A and
                 amended in red by SARA dated 07/04/2022
        must be promptly restored to pre-work profiles.
20.     The oyster reefs and any associated infrastructure including, but not           At all times


State Assessment and Referral Agency                                                                     Page 7 of 13

Page 8

                                                                                             2202-27255 SRA




        limited to navigational and educational signage (if installed) and
        temporary corner pegs and/or buoys and/or sediment curtains are to
        be constructed and maintained to avoid fish injury, mortality and/or
        entrapment.
21.     (a) Implement an inspection and monitoring program for the                 (a) Prior to the
              purposes of confirming the performance of the oyster reefs. The          completion of the
              inspection and monitoring program must:                                  works
            i.    have been prepared by a person or entity that is suitably
                  qualified and experienced in ecology and restoration;            At all times and
           ii.    involve the provision of inspection and monitoring reports to    pursuant to the
                  [email protected] at intervals of 6 monthly for the   intervals of the
                                                                                   timeframes stipulated
                  first year then annually for 8 years;
                                                                                   in ii.
          iii.    include an alert and action component, which will enable
                  changes to be made to any deficiencies in the oyster reefs;
          iv.     include a component to monitor and report on the
                  regeneration of impacted marine plants within the works
                  footprint at 6 month intervals until temporary impact areas
                  have regenerated to equal or greater condition;
           v.     be generally in accordance with the following documents:
                   Table 8.3: Environmental safeguards of Noosa Oyster
                       Ecosystem Restoration Project - Project Restoration
                       Plan prepared by The Nature Conservancy Australia
                       dated January 2022, amended in red by SARA dated
                       07/04/2022;
                   Section 8.4 – Erosion monitoring and mitigation of Noosa
                       Oyster Ecosystem Restoration Project - Project
                       Restoration Plan prepared by The Nature Conservancy
                       Australia dated January 2022, amended in red by SARA
                       dated 07/04/2022
                   Table 8.6 - Contingency plan of Noosa Oyster
                       Ecosystem Restoration Project - Project Restoration
                       Plan prepared by The Nature Conservancy Australia
                       dated January 2022, amended in red by SARA dated
                       07/04/2022

        The emails attaching the inspection and monitoring reports must
        state this permit number, the location and name of work and this
        condition number under which the report is being given.
22.     The sediment curtains described in condition 11 must be completely         Immediately following
        removed following completion of reef placement and associated              completion of reef
        increases in turbidity.                                                    placement and
                                                                                   associated increases in
                                                                                   turbidity.




State Assessment and Referral Agency                                                            Page 8 of 13

Page 9

                                                                                               2202-27255 SRA




Attachment 2—Advice to the applicant

General advice
1.      Terms and phrases used in this document are defined in the Planning Act 2016 its regulation or
        the State Development Assessment Provisions (SDAP) v2.6. If a word remains undefined it has
        its ordinary meaning.
2.      While this development allows for the potential use of seeded oyster cultch in the construction
        of the oyster reefs, it does not authorise the translocation of oysters. This activity will need to
        be authorised separately under a Fisheries Act 1994 General Fisheries Permit.
3.      A Resource Allocation Authority issued under the Fisheries Act 1994 must be held before any
        works take place within the Noosa River declared Fish Habitat Area.
4.      The development permit has allowed for flexibility in signage wording and format, for example,
        to accommodate other agencies navigation or safety management requirements or
        recommendations.
        Nonetheless, any wording on the signage must not be inconsistent with the relevant legislative
        and management requirements under the Fisheries Act 1994. The Department of Agriculture
        and Fisheries welcomes discussion on draft wording proposed for signage before installation –
        contact should be made through [email protected]




State Assessment and Referral Agency                                                              Page 9 of 13

Page 10

                                                                                            2202-27255 SRA




Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)

The reasons for SARA’s decision are:
 The application is for operational work for prescribed tidal works for habitat restoration within the
   Noosa River.
 There are four restoration sites that form part of this proposal, which are located at Tewantin, Goat
   Island, Noosa Sound East and Noosa Sound West.
 The works at the four restoration sites are located in the Noosa River navigation corridor and in a
   coastal management district.
 The proposed works for the Tewantin and Goat Island restoration sites are within the Noosa River
   declared fish habitat area (FHA) - management A area. Part of the Tewantin restoration site and all of
   the Goat Island restoration site occurs within the declared FHA and these areas are 1,667m2 and
   837m2 in size respectively, with a total proposed restoration area of 2,504m2.
 The works will result in temporary removal, destruction or damage to 479m2 of marine plants.
 The proposed prescribed tidal works will not impede on the safe navigation of vessels in the Noosa
   River and signage will be provided to ensure safe navigation within proximity to the restoration sites.
 The proposed operational work complies with State code 7: Maritime safety, State code 8: Coastal
   development and tidal works, State code 11: Removal, destruction or damage of marine plants and
   State code 12: Development in a declared fish habitat area, of the State Development Assessment
   Provisions, version 2.6, subject to conditions:
       o to ensure the development is carried out generally in accordance with the plans of
            development submitted with the application.
       o to ensure that at all times, all lights on or above the development site do not interfere with
            safe navigation in surrounding waterways.
       o to ensure the development avoids or minimises adverse impacts on coastal resources and
            their values.
       o to ensure landowners are aware they must take responsibility for their damaged property as
            they can impact on coastal resources and public safety.
       o to allow for compliance in relation to what is considered generally in accordance with the
            approved plans when preliminary plans are submitted with the application. Development
            inconsistent with the approval may have an impact on coastal management that was not
            considered in assessment.
       o to ensure any disturbance to acid sulfate soils is managed to prevent impacts to coastal
            environments.
       o to ensure the development is carried out in the location and to the extent specified on the
            approved plans of development.
       o to ensure the reef construction and sediment control is carried in accordance with the Project
            Restoration Plan.
       o to ensure the development is maintained in accordance with the approved plans of
            development and any ongoing requirements of conditions.
       o to ensure the disturbance of acid sulfate soil is managed to prevent impacts on fisheries
            resources and fish habitats.
       o to facilitate the monitoring of the development works for compliance purposes.
       o to ensure significant residual impacts to matters of State environmental significance are
            appropriately managed.
       o to ensure the development avoids and protects identified fish habitats and fisheries
            resources.
       o to ensure the development does not encroach into fish habitat areas outside the approved
            area.
       o to ensure tidal land profiles are restored to match the surrounding or pre-works sediment
            profile to aid re-colonisation by flora and fauna.


 State Assessment and Referral Agency                                                        Page 10 of 13

Page 11

                                                                                            2202-27255 SRA



        o    to ensure the development does not increase the risk of mortality, disease or injury, or
             compromise the health and productivity in fish.
        o    to ensure the fish way remains operational and a feasible and reliable solution providing
             adequate fish passage for as long as the waterway barrier is in position.
        o    to ensure the waterway barrier exists only for a temporary period and cause minimal and
             acceptable disruption to fish movement in the area.

Material used in the assessment of the application:
 The development application material and submitted plans
 Planning Act 2016
 Planning Regulation 2017
 The State Development Assessment Provisions (version 2,6), as published by the department
 The Development Assessment Rules
 SARA DA Mapping system
 Human Rights Act 2019




 State Assessment and Referral Agency                                                         Page 11 of 13

Page 12

                                                2202-27255 SRA




Attachment 4—Change representation provisions
(page left intentionally blank)




 State Assessment and Referral Agency            Page 12 of 13

Page 13

                                                 2202-27255 SRA




Attachment 5—Approved plans and specifications
(page left intentionally blank)




 State Assessment and Referral Agency             Page 13 of 13

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.