Skip to the record
The gold standard in government transparency.

Council archive · source document

Response to Information Request Part 2 [As Published] · 142008.975

of 1

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

LANDSCAPE
SPECIFICATION

Proposed Childcare Centre - 71 Pacific Ave, Sunshine Beach

EXTENT OF WORKS

Contractor should take full account of documentation of Civi
Engineering, Hydraulic Engineering and Electrical Engineering
Works. Landscape works are to include the following:

 

Edging to planting areas / Gravel Installation

Topsoil - Supply and incorporation

Turf Supply & Lay

Containerised Plant Material - Supply and installation
Garden Mulch - Supply and Spread

Irrigation & Drainage

Shaping of garden areas

Maintenance of landscape works (90days)

SNOARENS

1. EDGING TO PLANTING
Concrete/timber edging is to be installed for all garden areas
as required to the detail shown on sheet LA02

2. TOPSOIL - SUPPLY AND INCORPORATION
Planting areas are to be progressively filled with premium
grade blended organic garden soil mix (sandy loam).

Soil supplier as well as intended mix is to be nominated

Soil is to be mounded to facilitate good drainage to

hardstand areas (max. 1:3 grade) and is to finish 50mm
below edging after settlement. Organic additive

“dynamic lifter" or similar is to be incorporated throughout the
soil mix at the recommended rate.

A slow release fertiliser such as "osmocote" or its equivalent is
also to be incorporated with individual plantings in accordance
with the manufacturers recommendations.

3. TURF - SUPPLY AND LAY
a. "A" Grade Couch Species (or similar approved)
minimum sod depth - 25 mm

b. Turf to be laid within 24 hours of being cut.

c. Allow for ground preparation and deposition of 50 mm
imported garden loam topsoil. Apply Dynamic Lifter or
equivalent as per manufacturers recommendations.

d. Turf to be close butted and rolled in accordance with
accepted practice to ensure a smooth even surface.

4. CONTAINERISED PLANT MATERIAL

Plant material is to be approved by superintendent prior to
planting. Planting is to be carried out in a manner consistent
with good horticultural practice. All >45 It. pot plant material
is to be guyed and staked as per Planting Detail - Advanced
Stock (Refer LAQ2). Smaller plant stock is to be staked as
necessary. Stakes shall not pass through rootball of plant at
time of planting or any time thereafter.

PLANT STOCK NOTES
Container sizes are noted with Pots in millimetres & Bags in litres.
Stock may be rejected if plants are:

 

 

 

 

 
 

 

a) Undersized proportional to specified container size or
if the root system is underdeveloped

b) Oversized proportional to specified container size or
severely root bound

c) Unbalanced or uncharacteristic of normal or specified

growth pattern for the species

   

e) Diseased, infested with pests or suffering from other
form of significant stress

5. GARDEN MULCH

Organic Mulch: — Mulch shall be one inch hoop pine mulch to

all garden areas to a predominant depth of 100mm after settlement.
Mulch is to be graded to avoid placement against green plant

stems and overflow from purpose formed edges, kerbs and pathways.

6. IRRIGATION & DRAINAGE

({rrigation for the project shall be carried out by an experienced and
reputable irrigation contractor - Tenderers intending to handle the
rigation themselves will be required to demonstrate proficiency
this area). A fully automated and programmable irrigation system,
with rainswitch, is to be provided to all planting areas. All fittings
are to be fully effective and inconspicuously placed. Irrigation is to
serve all garden and turf areas of the site with lines placed through
conduits provided. The system should provide regulated
application to all areas, Irrigation systems is to be guaranteed for a
period of 12 months against faulty materials and workmanship.

 
 
 

 

 

 
 

Ensure all gardens and Sand Pits have adequate drainage through
Ag. Pipes and direct drainage away from the building at all times.

 

 

7. SHAPING OF GARDEN AREAS

Planting areas are to be finished in a gently mounded fashion
to facilitate drainage of excess water and to show planting to
best advantage. Contractor is to seek confirmation of finished
levels prior to final plantings and application of mulch.

All garden beds to be well drained. Drainage shi
for in areas that stay saturated for extended pi
potential detriment of plantings.

 

  

8. MAINTENANCE OF LANDSCAPE WORKS

a. Monitor plant performance and stress constantly and take
appropriate remedial action. Soil moisture levels are
critical during early establishment.

 

 

 

 

 

 

=
mn
g
>
Zz

dius.

 

David Low Way

 

 

 

    

 

  

    

 

 

 

 

 

 

         

 

 

 

 

 

 

 

 

 

      

     

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

   

 

 

NEIGHBOURING
BUILDING

    

 

 

 

 

 

Syzygium leuhmannil
at 1m spacings in acc

 

 

                            

 

 

 

 

DiA-cae x 50
LOM-Ion x 18,
- Tey AUS-dul x 1
c x KV, GRE-ban x 2
s x BAN-rob x 3
4 : ACR-imp x 1
= PUL-WG x2
LX \, \ GRE-ban x 1
AUS-dul x 2 VX S iT CAL-LJ x3
\ COR-tub x6
[ ; Mel-thy x 29
GRE-ban x2 : <K
BAN-tob x 4 x SOS
S CAL-LJ x3
AUS-dul x 4 \
LOP con x 4
CAL-MF x 2 SS Pool Fence
. eR OR-rub x 7,
\ , —Mel-thy ¥20
AUS-dul x 1 VRS
LOP con x 4 .
| | All existing trees
CAL-sal x 4 x are to be removed.
LEP-pet x 1 z ; |
K~* GjfE-ban 7
Sor | \ Yy
. BAN-rob | KY ™
AUS-dul x 2 - } Reimp x1
. Sandpit Lom-lon x8
j | DIA-cae (_
COR-tub ®
CAL-sal x 4 HAR gen -
CAL-LJ x “rub x 2
R.L 54.25 COR-ub x 10
LOM-on x 6
CAL-sal x 1 -pen x1
cae x 12
AUS-dul x 4
GRE-banx2
PUL-WG x3-\J SC LEP-petx2 7 Q
QE i
CAL-LJ x IS |
BAN-rob x Qe = YZ1e\x 3 R.L 54.5
CSTE
PUL-WG x 3 SRF << ADR-imp xB |
NDR 43 |
J andpit
AUS dul 4 | LOP con x 4} |
S |
BAN-rob x5—~ | " u | COR-rub x 3 |
S \ | LOM-Ion x 5 J
GRE-banx2 PUL-WG x 1]
CAL-LJ x5 | x =COR-ub x4
pe LOP con | LOM-on x6
PUL-WG x 3 | . : 7~COR-tub x 5
Ss A AUS-dul x4 — \ovbion x2 Y
A - 7 PRE 4. TURN
, fo - - AROUND
} A ‘ FACILITY 4°
° ES 4 4
syzieuxi——~ 4 AUS-dul ®3
+ -leu x 16
| WAT-lo x 4
d (200mm pots 800mm wide garden (2001) loxt \
/ @1000crs) bed planted with

CAL-LJ x5

 

 

All existing trees
are to be removed

 

 

LOP con

  

LOP con x 1

-dul x 4

x4

CAL-LJ x 3.

‘AUS-dul x 6

HAR-pen x 1
ACM-hem x 1

‘ACM-hem x 1

 

 

 
 

~AUS-dul x 11
LOP con x 1

 

CAL-LJ x5

LOP con x 1
flo x 11
OOL @1500c¢rs)

M-lon x 5

NEIGHBOURING
BUILDING

LEGEND

+) /EXISTING TREES TO BE REMOVED
| Species as noted on plan

  

SEWER LINE
Refer Engineering Plans for details

EXTERNAL HARD PAVEMENT
Refer Engineering Documentation

RUBBERISED SOFTFALL SURFACE.
Colour, pattem to be confirmed
CONCRETE EDGE

Extruded Concrete Garden Edging

BY] LARGE AND SMALL TREE PLANTING
Refer Planting Schedule

 

      

i %

SCREENING AND SHRUB PLANTING

ni
Refer Planting Schedule

<<] New Ture
‘S<Sc'| Refer Specification

 

HAR-pen x 4

 

 

AMENDMENTS:

fssue[ date | descipion avn
‘4 [1203.08 | ORIGINALISSUEFOROPWAPPROVAL [acy
8 | 23.0408 | AMENDMENTS TO LAYOUT BC)
| 21-0508 | AMENDMENTS TO LAYOUT AP
© |'17-07-08 | AMENDMENTS AS REQUESTED: MB

(CHANGED DETAIL ABOUT TREE STAKING,
CHANGE OF $ PROPOSED TREES TO
KOALA FOOD TREES

 

 

 

 

 

 

a

LANDGRAPHICS

LANDSCAPE ARCHITECTS

 

 

 

Proposed Childcare Centre
71 Pacific Ave, Sunshine Beach

 

(Chet Project Managers

Tadpoles Early Learning Centre

 

 

VEGETATION SCREENING:
Waterhousea floribunda to be provided
as mature specimens in 200L containers
where noted on Landscape Plan.

 

Tabletop Architects

 

 

 

Drawing The

LANDSCAPE PLAN for
Operational Works Approval

 

 

 

 

 

 

 

 

 

Prune and shape all shrubs and trees as required | thang \ vor cae) Rw
ie. Clear trunk to 1200mm & damaged branches with court order.
c. Remove all stakes at 90 day inspection . com | aco
d. _Fertilise all garden beds at 3 months (low phosphorus type) Proposed Childcare Centre cmcae | RB
e. Contractor shall maintain an up to date written log book ag .
to record inspection observations and actions 71 Pacific Avenue, Sunshine Beach bax | wero 2008
Tisem
Se 1:250@ A3
vere | Oe see owe
LGTP 1240] LAO1 01 OF 02 D

 

 

 

 

 

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request Part 2 [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.