                                            NOOSA COUNCIL
                                         REFERENCE DOCUMENT
                                        MCU26/0001 & OPW26/0002




                          Geotechnical Investigation
                 Proposed Residential Unit Development - 17 Bottlebrush
                                Avenue, Noosa Heads

        Geotechnical Investigation      30 January 2026 | Ref. 25408-001-Rev0
        30 January 2026 | 25408-001-Rev0
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026
Full text of the other 37 pages

Page 2

        Document Review
          Doc No.         Revision     Prepared By          Reviewed By                Date Issued
          001             0            Oliver De Silva      Ashley Davey               30 January 2025




          Doc No.         Revision     Method of Delivery   Issued To
          001             0            Electronic           Josh Cappiello ([email protected])




        Prepared By                                          Reviewed By



        Oliver De Silva BAppSc PMEG                          Ashley Davey BEng (Geological) RPEQ 8159
        Engineering Geologist                                Director/Principal Geotechnical Engineer




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                 i
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 3

        Executive Summary
        This report details the results of a geotechnical investigation undertaken for the proposed residential unit
        development at 17 Bottlebrush Avenue, Noosa Heads. The investigation was performed by Tectonic for
        Made One Pty Ltd. Recor are the structural consultants and project managers for the build.
        The investigation comprised drilling of boreholes at two locations across accessible areas of the
        development footprint. This report summarises the results of the investigation and provides
        geotechnical recommendations regarding earthworks and footings, together with temporary and
        permanent basement retention.
        Preliminary architectural drawings indicate that the development will comprise a three-storey unit
        building, over a single level basement carpark. Construction will include a combination of masonry and
        lightweight materials, suspended concrete floors, and pools on both the second level and roof. No
        earthworks details were provided at the time of reporting; however, the plans indicate that excavations
        for the basement would likely be in the order of about 5 m deep to the rear, with the cut daylighting at
        the front. Localised filling of less than 1 m high is anticipated. Excavations will extend close to the site
        boundaries and, therefore, some form of temporary retention will likely be required. Isolated deeper
        excavations may be required for the lift overrun pit and other elements.
        The subsurface conditions encountered in the boreholes are summarised as follows:
             Topsoil – comprising very loose to loose organic sand, to 0.1 m below ground level (BGL); then
             Fill – comprising loose sand, to depths of between 0.7 m and 1.1 m BGL; with underlying
             Natural Sands – comprising poorly graded sands, mostly being loose to depths of between 1.2 m
              and 1.7 m BGL; then becoming medium dense and increasing to dense below depths of between
              3.2 m and 3.6 m BGL.
        No signs of groundwater seepage (‘springs’) were observed during our walk-over. Groundwater was not
        encountered in the boreholes at the time of investigation.
        Provided the recommendations within this report are adhered to, and subject to detailed design and
        construction of the footing and retention systems by a suitably qualified and experienced RPEQ
        structural engineer, there should be a Low Risk to the proposed development from slope instability.
        Excavations through the soils encountered should be achievable using conventional earthmoving plant
        (e.g. excavators with toothed buckets). Temporary, unsurcharged cuts in the very loose to loose sands
        could be formed at 1V:2H, and at 1V:1.5H in medium dense (or denser) sand, for batters up to 3 m in
        height, provided groundwater seepage is not encountered and sands do not slough from the batter face
        as they dry out. It is expected that space restrictions will limit battering of temporary cuts on the site and
        so some form of temporary retention system will be required (e.g. sheet or secant piles).
        Footings for the proposed development and any ancillary structures (e.g. retaining walls, etc.) must
        penetrate through any unsuitable natural soils (i.e. very loose to loose sands) to found at least 0.5 m into
        medium dense (or denser) natural sands. Such materials were encountered below depths of about 1.3 m
        BGL (existing ground levels) in the boreholes. High-level footings or locally deepened pads could be
        utilised in most areas of cut, whilst piles would be required elsewhere.
        Given the sandy soil profile, where deepened footings are required away from cut areas, steel screw piles
        are considered to be a suitable foundation type. Due to the presence of loose sands, together with the
        close proximity of adjacent residences, open bored piers or driven piles are not considered to be suitable
        for this site.


        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                                 ii
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 4

        Contents
        1.      Introduction ............................................................................................................................................................ 1
        2.      Proposed Development ....................................................................................................................................... 1
        3.      Method of Investigation ......................................................................................................................................2
        4.      Results of Investigation .......................................................................................................................................3
                4.1 Site Description ......................................................................................................................................................... 3
                4.2 Topography................................................................................................................................................................. 5
                4.3 Geology ........................................................................................................................................................................ 5
                4.4 Subsurface Conditions ............................................................................................................................................ 6
                4.5 Groundwater............................................................................................................................................................... 7
                4.6 Surface Drainage ....................................................................................................................................................... 7
        5.      Slope Stability Assessment .................................................................................................................................8
                5.1 Existing Conditions................................................................................................................................................... 8
                5.2 Stability Assessment ................................................................................................................................................ 8
        6.      Geotechnical Recommendations ..................................................................................................................... 11
                6.1 Development Limitations..................................................................................................................................... 11
                6.2 Earthworks ................................................................................................................................................................. 11
                     6.2.1   Site Preparation and Trafficability................................................................................................... 11
                6.3 Excavations ................................................................................................................................................................ 12
                     6.3.1   Filling ......................................................................................................................................................... 12
                6.4 Building Foundations ............................................................................................................................................ 13
                     6.4.1   Indicative Site Classification .............................................................................................................. 13
                     6.4.2   Footing Design....................................................................................................................................... 13
                6.5 Temporary and Permanent Retention ............................................................................................................ 15
                6.6 Drainage ..................................................................................................................................................................... 16
        7.      Conclusion ............................................................................................................................................................. 16
        8.      Limitations ............................................................................................................................................................. 17




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                                                                                                          iii
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 5

        Text Figures
        Text Figure 1: Layout plan (upper) and 3D Render, courtesy of Blackwood.............................................................. 1
        Text Figure 2: Decemeber 2025 aerial image of the site and immediate surrounds (courtesy
              Nearmap) ................................................................................................................................................................................. 3
        Text Figure 3: View of Bottlebrush Avenue frontage, looking north ............................................................................ 4
        Text Figure 4: View of distressed retaining walls at rear of existing residence......................................................... 4
        Text Figure 5: Cracking in concrete steps (LHS) and foundation wall of existing residence (LHS) ................... 4
        Text Figure 6: Plan showing ground surface contours (courtesy NC ‘Intramaps’)................................................... 5
        Text Figure 7: Extract of 1:100,000 Laguna Bay Surface Geology Map ........................................................................ 6
        Text Figure 8: Extract from NC landslide hazard overlay mapping ............................................................................... 8
        Text Figure 9: Footing depth required to minimise risk of undermining ................................................................ 14



        Tables
        Table 1: Summary of Subsurface Conditions........................................................................................................................ 6
        Table 2: Stability Risk Levels ........................................................................................................................................................ 9
        Table 3: Details of Qualitative Risk Assessment for Property (AGS 2007) ............................................................... 10
        Table 4: Retaining Structure Design Parameters............................................................................................................... 16



        Figures
        Figure 1: Site Plan



        Appendices
        Appendix A                      Borehole & DCP Reports and Explanatory Notes
        Appendix B                      AGS Guidlines - Qualitative Terminology for Use in Assesing the Risk to Property
        Appendix C                      Limitations




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                                                                                                              iv
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 6

        1.              Introduction
        This report details the results of a geotechnical investigation undertaken for the proposed residential unit
        development at 17 Bottlebrush Avenue, Noosa Heads. The investigation was performed by Tectonic for
        Made One Pty Ltd, generally in accordance with Proposal P25626-Rev0, dated 16 December 2025. Recor
        are the structural consultants and project managers for the build.
        The investigation comprised drilling of boreholes at two locations and a single standalone dynamic cone
        penetrometer (DCP) test, across accessible areas of the development footprint. This report summarises
        the results of the investigation and provides geotechnical recommendations regarding earthworks and
        footings, together with temporary and permanent basement retention. In summary, subject to the
        implementation of the recommendations made herein, it is assessed that there should be a Low Risk of
        slope instability affecting the proposed development in accordance with the Australian Geomechanics
        Society Guidelines for Landslide Risk Management, dated March 2007 (AGS 2007).



        2.              Proposed Development
        Preliminary architectural drawings were supplied to Tectonic (Ref. Blackwood Architecture, Project No.
        202612, Sheet Nos. DA1.01 to DA6.05 [not inclusive], Issue A, Dated 11 December 2025). These plans
        indicate that the development will comprise a three-storey unit building, over a single level basement
        carpark. Construction will include a combination of masonry and lightweight materials, suspended
        concrete floors, and pools on both the second level and roof.
        No earthworks details were provided at the time of reporting; however, the plans indicate that
        excavations for the basement would likely be in the order of about 5 m deep to the rear, with the cut
        daylighting at the front. Localised filling of less than 1 m high is anticipated. Excavations will extend
        close to the site boundaries on the northern and southern sides, and therefore, some form of temporary
        retention will likely be required. Isolated deeper excavations may be required for the lift overrun pit and
        other elements. A basement layout plan and 3D render view are shown in Text Figure 1 below.




                Text Figure 1: Basement level layout plan (LHS) and 3D render (RHS), courtesy of Blackwood
                                                        Architecture




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                              1
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 7

        3.              Method of Investigation
        As part of our assessment, a desk-top study was carried out comprising a review of published geological
        maps and slope stability studies, as well as Noosa Council (NC) planning overlays and site information.
        An experienced engineering geologist from Tectonic undertook a site walk-over on 19 January 2025 to
        visually assess any indicators of past slope instability. The walk-over included assessment of soil
        exposures, surface drainage conditions, topography, evidence of erosion or past instability, and
        vegetation.
        The walk-over was followed by a subsurface investigation comprising the drilling of two hand augered
        boreholes (designated BH1 and BH2) to depths of up to 4 m below ground level (BGL) and one
        standalone DCP test (DCP3), in accessible areas across the site.
        In-situ testing, using the DCP method, was carried out from the ground surface and at selected depths
        within each borehole. DCP testing was extended below the base of the hand augered boreholes to
        depths of up to 4.8 m BGL. Boreholes were backfilled on completion using drilling spoil, with excess
        material slightly mounded at surface.
        Laboratory classification testing was not warranted due to the sandy nature of the subsurface conditions
        encountered.
        Borehole locations are shown in Figure 1 attached at the end of this report, with borehole and DCP logs
        presented in Appendix A, together with explanatory notes. Subsurface conditions are discussed in
        Section 4.4. Borehole coordinates were recorded using a handheld global positioning system (GPS).
        The results of the desk-top study and walk-over survey are included in Section 4.




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                          2
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 8

        4.              Results of Investigation
        4.1             Site Description
        The site is formally described as Lot 143 on RP88934, covering an area of 506 m2, with frontage to
        Bottlebrush Avenue along the south-western boundary. At the time of the investigation a two-storey
        house occupied most of the front half of the site, with a concrete driveway providing direct access off
        Bottlebrush Avenue.
        Based on a visual assessment, the existing building was noted to be in fair structural condition exhibiting
        no obvious signs of major distress (e.g. cracking, misalignment, etc.). However, some
        dilapidation/distress was evident across the existing driveway, retaining walls and fencing, which
        appeared to be related to age, poor construction and possibly consolidation of the upper loose sands.
        Residential unit developments and houses occupied properties to the north, east and west of the site. It
        appeared that these surrounding unit buildings comprised mostly at grade carparking, with the lower
        level partially excavated into the hillside.
        A recent aerial image of the site and immediate surrounds is shown in Text Figure 2 below.




                                           Subject site




         Text Figure 2: Decemeber 2025 aerial image of the site and immediate surrounds (courtesy Nearmap)

        Site conditions at the time of our investigation are shown overleaf in Text Figures 3 to 5.




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                          3
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 9

                                 Text Figure 3: View of Bottlebrush Avenue frontage, looking north




                           Text Figure 4: View of distressed retaining walls at rear of existing residence




            Text Figure 5: Cracking in steps (LHS) and condition of foundation wall of existing residence (LHS)


        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                          4
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 10

        4.2              Topography
        As illustrated in Text Figure 6 below, the site is located on the south-westerly facing flank of an ancient
        sand dune, which crests about 200 m to the east/north-east. During the walk-over, topographic features
        specific to the site were noted, and ground slopes were recorded using a hand-held clinometer.
        The natural surface profile had been interrupted by historic landscaping and residential construction;
        with inferred unaltered ground slopes along the side boundaries measured at the time of our assessment
        of about 10°. Based on our observations it appeared that cut and fill earthworks of up to about 1.5 m
        depth/height had been undertaken across the site. To the rear of the residence the ground surface was
        gently sloping, typically being less than 3°, and supported by timber sleeper walls about 0.5 m high. The
        front of the property comprised a gently sloping carparking area, being less than 5°, with the driveway
        continuing down to Bottlebrush Avenue at about 12°.
        Generally, no irregular surface features were noted which would indicate global slope instability.




                                                 Subject Site




                          Text Figure 6: Plan showing ground surface contours (courtesy NC ‘Intramaps’)


        4.3              Geology
        Available geological information 1 indicates that the site is underlain by Pleistocene age blowout dunes
        comprising “quartz sand.” An extract of the relevant geological mapping is shown in Text Figure 7
        overleaf.




        1
            Queensland Government, Department of Mines and Energy, 1:100,000 Laguna Bay Surface Geology Map, Sheet 9545, 11 July 2018


        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                                                5
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 11

                                                                                     Approx. Site Location




                                Text Figure 7: Extract of 1:100,000 Laguna Bay Surface Geology Map


        4.4             Subsurface Conditions
        Detailed descriptions of the subsurface conditions encountered in the boreholes are provided in the
        borehole reports attached in Appendix A, along with definition sheets which describe terms and
        abbreviations used on the reports. The subsurface conditions encountered in the boreholes are
        summarised as follows:
              Topsoil – comprising very loose to loose organic sand, to a depth of 0.1 m BGL; then
              Fill – comprising loose sand, to depths of between 0.7 m and 1.1 m BGL; with underlying
              Natural Sands – comprising poorly graded sands, mostly being loose to depths of between 1.2 m
               and 1.7 m BGL; then becoming medium dense and increasing to dense below depths of between
               3.2 m and 3.6 m BGL.
        Table 1 below summarises the subsurface profile encountered.

        Table 1: Summary of Subsurface Conditions
                                                                                                        Medium Dense      Dense (or denser)
            Borehole No.               Topsoil                 Fill              Loose Sands
                                                                                                           Sands               Sands


                 BH1                   0.0 – 0.1            0.1 – 1.1              1.1 – 1.3                 1.3 – 3.3      3.3 – 4.8*DCP



                 BH2                   0.0 – 0.1            0.1 – 0.7              0.7 – 1.2                 1.2 – 3.2*     3.2 – 4.7*DCP



                 DCP3                                                              0.0 – 1.7*                1.7 – 3.6*      3.6 – 3.9DCP

        Notes:    1.        Depths noted in m BGL at time of investigation (19 January 2026)
                  2.        * inferred from DCP testing
                  3.        DCP
                                denotes DCP termination depth




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                                                      6
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 12

        4.5             Groundwater
        No signs of groundwater seepage (‘springs’) were observed during our walk-over. Groundwater was not
        encountered in the boreholes at the time of investigation.
        Groundwater conditions are expected to be reflective of prevailing weather conditions and seepage may
        develop, particularly following periods of prolonged or heavy rainfall.


        4.6             Surface Drainage
        Surface drainage would be expected to follow natural surface contours to the south-west towards
        Bottlebrush Avenue, thus draining into the roadside drainage system. It is noted that the site has
        relatively large catchment; however, most runoff from upslope of the property is anticipated to be
        intercepted by the existing stormwater infrastructure from the neighbouring structures and streets to the
        north-east.
        Given the sandy nature of the site, rainfall would normally be anticipated to infiltrate the ground surface.
        However, as the proposed development will occupy a large part of the block, significant run-off from
        hard surfaces will occur. Nevertheless, where directed into swales rather than pipes, such run-off would
        be expected to infiltrate into the natural sands relatively rapidly.
        No significant surface run-off features were noted during our assessment (e.g. deep rilling or scour/wash
        out scars). This indicates that significant overland flow is generally absent during rainfall events.




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                           7
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 13

        5.              Slope Stability Assessment
        5.1             Existing Conditions
        The NC Planning Scheme 2020 includes a landslide hazard overlay map (Ref. extract in Text Figure 8),
        which indicates that parts of the site are within a Moderate Landslide Hazard Area.




                                                                           Subject site




                                  Text Figure 8: Extract from NC landslide hazard overlay mapping

        It should be noted that the NC landslide hazard map is a broad-scale indication of the potential landslide
        susceptibility and is superseded by this site-specific assessment. No visual signs of global slope instability
        were observed across the allotment. No landslide back scarps, groundwater springs, or areas of naturally
        ‘hummocky’ ground were observed. Additionally, overall natural ground slopes were gentle to moderate,
        with medium dense natural sands encountered at relatively shallow depths.


        5.2             Stability Assessment
        The risk assessment for this project has been carried out following AGS 2007 Practice Note Guidelines for
        Landslide Risk Management. Relative levels of risk and their implications are given in Table 2 overleaf
        and the Qualitative Terminology for Use in Assessing Risk to Property is also attached in Appendix B.




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                            8
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 14

        Table 2: Stability Risk Levels
            Risk Level            Example Implications(1)

            VH     Very High      Unacceptable without treatment. Extensive detailed investigation and research, planning and
                   Risk           implementation of treatment options essential to reduce risk to Low; may be too expensive and not
                                  practical. Work likely to cost more than value of property.

            H      High Risk      Unacceptable without treatment. Detailed investigation, planning and implementation of treatment
                                  options required to reduce risk to Low. Work would cost a substantial sum in relation to the value of
                                  the property.

            M      Moderate       May be tolerated in certain circumstances (subject to regulators’ approval) but requires investigation,
                   Risk           planning and implementation of treatment options to reduce risk to Low. Treatment options to reduce
                                  to Low risk should be implemented as soon as practicable.

            L      Low Risk       Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level,
                                  ongoing maintenance required.

            VL     Very Low       Acceptable. Manage by normal slope maintenance procedures.
                   Risk

        Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may depend
        on the nature of the property at risk; these are only given as a general guide.

        Given the geology and topography of this site, it is unlikely that a landslide could affect the proposed
        development area. Sand dune slopes are generally close to the ‘limit of equilibrium’ for slope stability
        where the surface gradient is about 30° (58%), although often lower (26˚ to 28˚) for very loose sands.
        Our measurements indicate that natural overall gradients ranged up to about 10°. The limit of
        equilibrium is the ‘tipping point’ to instability, where the factor of safety (FOS) of the slope is
        approximately 1.0. The FOS of a slope is the balance (ratio) between the forces driving instability (e.g.
        soil weight, groundwater pressure) and the resisting forces (e.g. soil friction and cohesion).
        Sand dune slopes generally remain stable (i.e. FOS greater than 1.0) when they are:
                well vegetated (mix of ground cover, shrubs and small trees);
                not subjected to concentrated stormwater flows;
                not surcharged with additional loads (e.g. fill); and
                not undercut by excavation or erosion.
        Where dunes are well vegetated, the plant roots can provide a surface reinforcing layer which may
        enable dunes to stand up relatively steeply, particularly when combined with soil suction. Direct
        discharge of stormwater onto dune slopes may cause channel erosion, undermining and disturbance of
        vegetation, and development of generally localised instability.
        The primary trigger for large-scale instability of sand dunes is when the toe of the dune is disturbed.
        This may be caused by excavations or natural erosion. The potential for significant erosion of the dune
        immediately down slope from the site is considered negligible, provided that future disturbances (e.g.
        excavations etc.) are managed with sufficient engineering consideration. Given the setback of the
        property from the coastline, the risk from erosion of the sand dune by coastal process leading to
        instability at the site is also assessed to be negligible.
        Considering the existing site conditions (Ref. Section 4), and subject to the implementation of
        recommendations given below, it is assessed that there should be a Low Risk of global slope instability
        affecting the proposed development. Regulators (NC) normally require that a Very Low or Low Risk of
        landslide affecting the property must be demonstrated to enable development approval. Summarised in



        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                                                    9
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 15

        Table 3 below is our qualitative assessment of landslide risk for the development site. A summary of
        qualitative terminology for use in assessing risk to property is attached (taken from AGS 2007).

        Table 3: Details of Qualitative Risk Assessment for Property (AGS 2007)

          Hazard                 Likelihood       Consequence   Assessed Risk   Comments
                                                                                Given the gentle to moderate natural gradients
          Failure through                                                       through the site, it is considered Unlikely that a
          very loose to                                                         landslide would develop in these materials, subject to
          loose natural                Unlikely    Medium            Low        implementation of the recommendations in Section 6.
          sands above the                                                       It is assessed that there could be a potential Medium
          foundation depth                                                      impact from such instability so the resultant risk would
                                                                                be Low as per AGS 2007.

                                                                                The likelihood of a deep failure through the medium
          Deep failure                                                          dense (or denser) natural sand below the proposed
          through the                                                           foundation depths is assessed as Rare due to the lack
          medium dense (or                                                      of precedence of such movements locally, no signs of
                                        Rare         Major           Low
          denser) sands                                                         any existing slope instability and apparent lack of
          below the                                                             groundwater. Although the consequence of such a
          foundation depth                                                      failure would be Major, the resultant risk is Low as
                                                                                per AGS 2007.

                                                                                The likelihood of a slide/failure through any temporary
                                                                                retention system (sheet pile wall, contiguous pile wall
          Temporary
                                                                                or similar) as outlined in Section 6.4, is assessed as
          instability through
                                                                                Rare, subject to detailed design by a suitable qualified
          temporary
                                        Rare         Major           Low        RPEQ engineer and construction by a specialist
          retention system,
                                                                                contractor which accounts for the required factors of
          as discussed in
                                                                                safety against slope instability. Although the
          Section 6.4.
                                                                                consequence of such a failure would be Major, the
                                                                                resultant risk is Low as per AGS2007.



        The potential impacts on slope stability of the development components have been assessed, and the
        measures recommended below in Section 6 have been designed to mitigate those impacts.




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                                              10
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 16

        6.              Geotechnical Recommendations
        General recommendations to help maintain the stability of the site are given in the document Some
        Guidelines for Hillside Construction, which is attached.


        6.1             Development Limitations
        Should any revisions be made to the extent of the proposed development as described in Section 2,
        Tectonic must review these prior to construction to assess if there are any impacts on slope stability.
        To achieve a Low Risk of instability, the following is recommended:
             Unretained filling should be limited to no more than 1 m above the existing ground surface, unless
              assessed and approved by a geotechnical RPEQ.
             All footings must be founded below the zone of influence of the surrounding structures and
              infrastructure (including underground services).
             All retaining walls exceeding 1 m high and/or subject to surcharge loads must be RPEQ designed
              and certified, which must include an assessment of global and internal stability.
             Design and construction of footings shall be undertaken in accordance with Section 6.3.2.
             Formal drainage should be constructed to ensure all stormwater is directed away from the existing
              and proposed structures.


        6.2             Earthworks
        6.2.1           Site Preparation and Trafficability
        Following removal of the existing buildings and associated construction elements (e.g. footings, services,
        etc.), any tree stumps and large roots should be ‘grubbed out’. Any organic rich topsoil and uncontrolled
        fill should then be stripped and set aside. Based on the boreholes, topsoil stripping depths should
        generally range between 0.1 m and 0.2 m BGL, with uncontrolled fill encountered to depths 1.1 m BGL
        (existing ground levels) in borehole BH1. It is possible that deeper pockets of topsoil or uncontrolled fill
        may exist and deeper, localised grubbing out of tree roots may be required.
        Topsoil materials must not be used in structural fill; however, may be placed across landscaping areas.
        Unsuitable natural material such as any saturated, loose or soft materials encountered should also be
        removed during subgrade preparation for bulk earthworks.
        It should be noted that compaction of such relatively ‘clean’ sands as structural fill requires the addition
        of substantial volumes of water (‘flooding’) combined with the use of vibratory compaction equipment
        (typically a vibrating plate). Care must be taken with the use of vibratory equipment (e.g. compactors or
        sheet piling) to ensure that there are no adverse impacts on surrounding structures. The impacts from
        ground vibration must be closely monitored and managed during construction. It would be prudent to
        conduct a dilapidation survey of neighbouring structures prior to commencement of construction.
        The exposed natural subgrade following excavations will likely be in a loose condition and must be
        compacted by several passes of a vibrating plate or minimum 4 tonne vibrating smooth drum roller, in
        conjunction with surface application of ample water, to achieve the required compaction.
        Due to the potential for poor trafficability during placement of a minimum 150 mm thick granular
        working platform may be required on soil subgrades along haul roads and across laydown areas.


        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                           11
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 17

        Specific platform design would be required prior to mobilisation and trafficking of any heavy mobile
        plant on the site (e.g. mobile cranes, concrete pumps or piling rigs)
        Construction areas and surrounds should be graded to shed surface water runoff.

        6.2.2           Excavations
        Excavations through the soils encountered in the boreholes should be achievable using conventional
        earthmoving plant (e.g. excavators with toothed buckets). Temporary unsurcharged cuts in the very
        loose to loose sand could be formed at 1V:2H, and at 1V:1.5H in medium dense (or denser) sand for
        batters up to 3 m in height. Flatter batters or temporary retention may be required if groundwater
        seepage is encountered or if sloughing of dry sand occurs at the batter surface. Deeper unretained cuts,
        if required, should be specifically assessed by Tectonic, unless supported by temporary retention
        measures.
        If filling or permanent cuts exceed 1 m, then these must be retained. Permanent cut and fill batters up to
        1 m high shall not exceed 1V:2.5H. Any permanent soil and fill batters will require erosion protection
        (e.g. revegetation or surface protection).
        It is likely that above temporary batter slopes will not be able to be achieved, due to spatial restraints,
        and so temporary shoring will be required (e.g. sheet, contiguous or secant piles), as per the
        recommendations in Section 6.4 below. Excavations in close proximity to existing structures, including
        on neighbouring properties, will need to be specifically designed to prevent undermining. It is
        recommended that footing exposures or confirmation of foundations via certified building plans be
        undertaken to assess the possibility of undermining. If undermining is a potential issue the existing
        structures may need to be underpinned or excavations may require temporary shoring.
        The advice of a suitably qualified and experienced RPEQ structural engineer must be sought regarding
        any potential undermining and design and construction of any underpins/temporary shoring (if
        required).
        The above recommendations do not supersede any existing safety regulations or legislation applicable to
        excavations (e.g. limits on personnel entry into trenches).
        Due to the highly permeable nature of the sands at this site, stormwater is expected to rapidly infiltrate
        the ground, making un-sealed surface drainage ineffective for the control of flows. Any sealed areas
        should be graded to ensure free drainage of stormwater away from construction areas, and to a control
        point(s).

        6.2.3           Filling
        The natural sandy soils where free of deleterious materials (e.g. vegetation, building debris etc.) may be
        reused as structural fill, subject to appropriate moisture adjustment. It should be noted that compaction
        of such relatively ‘clean’ sands as structural fill requires the addition of substantial volumes of water
        (‘flooding’) combined with the use of vibratory compaction equipment (typically a smooth drum roller or
        heavy vibrating plate).
        Should importation of fill be required, it is recommended that such fill should comply with the following:
             Minimum CBR of 10 %
             Maximum plasticity index of 15 %
             Shrink-swell index ≤ 1 %
             Maximum particle size of 100 mm


        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                              12
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 18

        Any fill should be compacted at moisture contents within the range of ±2 % of optimum moisture
        content for Standard Compaction. Fill material should be placed in 250 mm thick (loose thickness) layers
        and be compacted by repeated rolling using a minimum 4 tonne smooth drum roller (or equivalent, with
        vibration on if safe to do so) to achieve a dry density ratio of at least 95 % of the maximum Dry Density
        Ratio (DDR), based upon the Standard Compaction method, or a Dry Density Index of at least 70 %.
        Confirmatory compaction testing must be carried out at regular intervals. A minimum of two tests per
        vertical lift is recommended where structural fill heights are to exceed 300 mm. Further details for
        control and testing of fill are given in Australian Standard AS 3798-2007 Guidelines on Earthworks for
        Commercial and Residential Developments.
        Fill embankment edges must be over-filled by half the width of the compaction equipment (horizontally)
        and then trimmed back to well compacted material.


        6.3             Building Foundations
        6.3.1           Indicative Site Classification
        Site classifications for footing design are determined in accordance with AS 2870-2011 Residential Slabs
        and Footings, and depend on the depth of cut / fill undertaken at a site, variations in the natural soil/rock
        depths, and the reactivity of the in situ soil / rock and any imported fill materials.
        Based on the results of the investigation, the site is classified as Class P in accordance with AS 2870-2011
        Residential Slabs and Footings, due to the presence of poor bearing capacity soils from shallow depths. If
        not for this factor, the site would have the characteristics of Class S, with the estimated characteristic
        surface movements (‘ys’) ranging up to about 20 mm. However, due to the potential variability in
        subgrade density a site classification of Class M is recommended in relation to assessment of flexibility
        requirements for ground slabs, footings and plumbing design.

        6.3.2           Footing Design
        No design loadings were available at the time of reporting. Footings for the proposed development and
        any ancillary structures (e.g. retaining walls, etc.) must penetrate through any unsuitable natural soils (i.e.
        very loose to loose sands) to found at least 0.5 m into medium dense (or denser) natural sands. Such
        materials were encountered below depths of about 1.3 m BGL (existing ground levels) in the boreholes.
        High-level footings or locally deepened pads could be utilised in most areas of cut, whilst piles would be
        required elsewhere.
        High level footings, where achievable in cut areas, may be designed using an allowable bearing pressure
        of 100 kPa provided that they are founded in the natural medium dense (or denser) sands. Excavations
        would likely loosen the sands, so densification of high-level footing bases should be allowed for, by
        compaction with a vibrating plate, prior to placement of steel reinforcement.
        Piles founded in medium dense (or denser) sands may be designed using an allowable end bearing
        pressure (ABP) of 400 kPa. Should higher bearing pressure be required, deeper piles founded at least 1 m
        into dense (or denser) sand (about 5 m BGL) could be designed using an ABP of 1 MPa.
        Given the sandy soil profile, where piles are required, steel screw piles would commonly be adopted.
        Due to the presence of loose sands, together with the close proximity to surrounding infrastructure, open
        bored or driven piles are not considered to be appropriate for this site. Steel reinforced concrete bored
        piles could be feasible; however, the use of sacrificial liners (e.g. ‘formatube’) would be required to
        prevent the caving of upper loose sands. Grout-injected, continuous flight auger (CFA) piles could also


        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                             13
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 19

        be considered, particularly if necessary to achieve sufficient shear and bending resistance for global
        stability (e.g. for basement walls).
        The advice of a specialist piling contractor must be sought regarding feasibility, design and installation of
        the piling system for this site, including an assessment of potential vibration effects on nearby structures,
        and monitoring requirements.
        If steel screw piles are adopted, it will be important to ensure close supervision of installation, as piling
        may not encounter sufficient drilling resistance (from torque measurement) in sands at the suggested
        founding depth, and piles could extend to much greater depth than necessary.
        It is therefore recommended that site specific static load testing be conducted from screw piles, if
        adopted, at a minimum. Where tension or compression capacity developed in the footings is critical for
        the future structure (e.g. resistance to uplift forces from high winds), then cyclic load tests (including
        measurement of deflections under tension and compression cycles) should also be undertaken prior to
        construction. Kentledge for static testing, or simulated cyclic loads, should prove the piles to a minimum
        of two times the expected working load within tolerable deflections.
        Footing design should also account for potential soil reactivity to be equivalent to Class M. It should be
        noted that placement of reactive clay as fill (which is not recommended) may result in a more severe
        equivalent site classification, such as H1 or greater.
        All footings should found such that they are not adversely affected by any adjacent excavations, trenches,
        retaining walls, or in ground structures that are not designed to support building loads. Footings should
        found at least below a plane extending 1 m horizontally from the base of trenches/excavations/retaining
        walls/swimming pool, then rising up at 1V:1H, as illustrated in Text Figure 9 below. This would also be
        applicable when considering possible adverse interactions with buildings on adjacent properties.




                              Text Figure 9: Footing depth required to minimise risk of undermining

        Site drainage should be designed to readily remove surface water and to prevent ponding of water on
        subgrade areas during construction and also adjacent to foundations and perimeter slabs once
        construction is completed.
        It is recommended that footing excavations be inspected by a suitably qualified and experienced
        engineer prior to placement of steel reinforcement and pouring of concrete to confirm allowable bearing
        pressures and cleanliness of excavations.
        If any soil conditions encountered during construction are found to differ from those noted in the
        geotechnical investigation, Tectonic should be notified immediately and an inspection carried out to
        determine if changes to footing design are required.




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                                14
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 20

        6.4             Temporary and Permanent Retention
        Excavations are expected to range up to around 5 m BGL (existing ground levels) and, given that the
        planned excavations extend close to some of the site boundaries and underground infrastructure (e.g.
        stormwater to north-west), some form of temporary excavation shoring will likely be required.
        Based upon our experience with similar sites, we anticipate that temporary shoring may be achieved by
        use of sheet piles, however Unitywater and NC requirements for existing infrastructure, and the
        sensitivity of neighbouring structures, may restrict the use of sheet piles. Shoring of deeper cuts would
        likely require lateral restraint, and this is conventionally achieved by helical steel anchors (similar to screw
        piles) in sands. However, the proximity to neighbouring properties would likely require permissions to
        be obtained for subterranean access. Therefore, where lateral support by cantilever only is not feasible, it
        is suggested that internal struts/propping be considered to provide lateral restraint for the shoring
        system.
        Sheet piles may require pre-drilling to loosen sands to the design foundations levels to prevent adverse
        vibrations during sheet pile installation. Ground vibration monitoring and management would also be
        necessary.
        Other shoring methods that could be considered include bored contiguous or secant piles, micropiles or
        CFA piles. Non-contiguous or soldier pile walls are not feasible for the proposed development due to
        the likelihood that the sands would ‘flow’ through gaps between the piles before application of structural
        facing.
        An advantage of contiguous or secant pile wall retention systems is that they are ultimately used for the
        permanent walls, whereas sheet piles would be temporary to provide retention during construction only,
        therefore requiring a permanent structural wall to be constructed. Bored pile walls generally require
        greater width (horizontally) for installation as compared to sheet piles and are often more expensive.
        The advice of a specialist shoring contractor must be sought regarding feasibility, design and installation
        of the proposed retention and associated subsurface drainage system. It will be necessary to conduct
        numerical analysis to optimise the retention system. Detailed design will also need to account for
        relevant factors of safety to maintain the temporary and long-term stability of the retention system.
        Retaining structures greater than 1 m high, or those required to support surcharge loads or sloping
        backfill, will require engineer design and certification of construction. Retaining wall design should be
        carried out in accordance with AS4678-2002 Earth retaining structures.
        Design for temporary and permanent retaining structures could be carried out using a pressure
        distribution applicable to the wall type (e.g. trapezoidal for propped or anchored walls) and based on the
        parameters listed in Table 4 overleaf. These values do not include allowance for hydrostatic pressures
        nor transient (e.g. construction) or adjacent footing loadings.




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                             15
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 21

        Table 4: Retaining Structure Design Parameters

                                            Unit                                          Lateral earth pressure coefficients
                                                         Friction
          Retained material                weight                                   Ka                       Ko                 Kp
                                                         angle (°)
                                          (kN/m3)                            (Cantilever wall)       (Non-yielding wall)


                  Loose Sands                17             27                     0.38                      0.55               2.66


             Medium Dense Sands              18             33                     0.29                      0.46               3.39


            Dense (or Denser) Sands          19             36                     0.26                      0.41               3.85


             Future Controlled Fill*          *              *                      *                          *                 *


        Note:     * Depends on fill material type and level of compaction.

        Retaining structures must be founded as per the recommendations in Section 6.3.2 above with the piled
        footings, if required, also designed to resist lateral loads imposed by the retaining wall. Detailed design
        must include an assessment of internal and global stability.


        6.5             Drainage
        Permanent surface diversion drainage should be constructed above the crest of any new cut or fill
        embankment or retaining walls (e.g. grassed or landscaped swales or diversion mounds). Adequate site
        drainage must be installed to ensure that stormwater runoff is directed away from building walls,
        footings, batters and retaining walls.
        Although unlikely, if groundwater seepage is encountered during excavations, Tectonic must be notified
        to assess the impact on stability.
        Subsurface drainage must be installed behind any retaining walls (e.g. slotted ‘aggi’ pipe wrapped in
        filter ‘sock’ placed in gravel backfill). Depending on matters such as the extent of drainage installed and
        site-specific groundwater conditions, the designer must make an assessment of hydrostatic pressure to
        be accounted for in the design of the retaining structure.
        All excess stormwater collected around the building (including overflow from rainwater tanks, etc.) must
        be directed by pipes or lined channels to discharge into the existing stormwater infrastructure along
        Bottlebrush Avenue. Subsurface disposal of stormwater must not be undertaken.



        7.              Conclusion
        Based on the findings of our assessment it is assessed that there would be a Low Risk of slope instability
        affecting the proposed development subject to implementation of the recommendations given in this
        report.




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                                               16
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 22

        8.              Limitations
        Your attention is drawn to the document Limitations, which is included in Appendix C of this report. The
        statements presented in this document are intended to advise you of what your realistic expectations of
        this report should be, and to present you with recommendations on how to minimise the risks associated
        with the services provided by Tectonic for this project.




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                                                                      17
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 23

 

 

CLIENT

MADE ONE PTY LTD

 

PROJECT

GEOTECHNICAL INVESTIGATION FOR CANOPY RESIDENCES

17 BOTTLEBRUSH AVENUE, NOOSA HEADS

 

 

 

 

 

 

 

DRAWN BY DATE

MM 29/01/2026
CHECKED BY DATE

OD 29/01/2026
SCALE SHEET SIZE

AS SHOWN A3

 

 

DRAWING TITLE NOTES
SITE PLAN BASEMAP COURTESY OF NEARMAP, DATED 6 DECEMBER 2026

PROJECT NO DOC NO. FIGURE NO REVISION
25408 001

 

 

 

 

ane

 

APPROX. BOREHOLE LOCATIONS

APPROX. DCP locations

 

Document Set ID: 28528628

Version: 2, Version Date: 18/08/2026

 

Page 24

                Appendix A
                Borehole & DCP Reports and Explanatory
                Notes




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                 18
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 25

                                                                                                                                                                                                                                                                                                                                                                                                                                      Borehole No.

                                                                                                                                                                                                                                                                                                                                                                                                                                            BH1
                                                                                                                                                                                                                                                                                                                                                                                                                                      Page 1 of 1

                                                                                                                                                                                                                   Engineering Log - Borehole                                                                                                                             Project No.:                     25408

                                                                                                                                                                                                                        Client:                                 Made One Pty Ltd                                                                                          Commenced:                       19/1/2026
                                                                                                                                                                                                                        Project Name:                           Proposed Residential Unit Development                                                                     Completed:                       19/1/2026
                                                                                                                                                                                                                        Hole Location:                          17 Bottlebrush Avenue, Noosa Heads                                                                        Logged By:                       MM
                                                                                                                                                                                                                        Hole Position:                          509074.0 m E 7080441.0 m N MGA2020 Zone 56                                                                Checked By:                      OD
                                                                                                                                                                                                                        Drill Model and Mounting:                                Hand Auger                                               Inclination: -90°               RL Surface:                 No survey
                                                                                                                                                                                                                        Hole Diameter:                                           100 mm                                                   Bearing:     360°               Datum:                      AHD       Operator:        MM

                                                                                                                                                                                                                                           Drilling Information                                                                                          Material Description and Observations




                                                                                                                                                                                                                                                                                                                                                                                   Relative Density
                                                                                                                                                                                                                                                                                                            Classification                                                                                                       DCP TEST
                                                                                                                                                                                                                            Penetration




                                                                                                                                                                                                                                                                                                                                                                                                        Pocket




                                                                                                                                                                                                                                                                                                                                                                                   Consistency
                                                                                                                                                                                                                                                                                              Graphic Log


                                                                                                                                                                                                                                                            Samples                                                                         Material Description
                                                                                                                                                                                                                                                                                                                                                                                                      Penetrometer




                                                                                                                                                                                                                                                                                                                                                                                   Condition
                                                                                                                                                                                                                                                                      Recovery




                                                                                                                                                                                                                                                             Tests                                                            soil type: plasticity or particle characteristics,




                                                                                                                                                                                                                                                                                                                                                                                   Moisture
                                                                                                                                                                                                                                                                                                                                                                                                         UCS                  Blows per 100 mm
                                                                                                                                                                                                                                                                                                            Symbol
                                                                                                                                                                                                                   Method




                                                                                                                                                                                                                                                                                                                               secondary and minor components, colour
                                                                                                                                                                                                                                          Water




                                                                                                                                                                                                                                                            Remarks               RL Depth                                                                                                               (kPa)
                                                                                                                                                                                                                                                                                  (m) (m)                                                                                                                             0   5     10     15    20   25




                                                                                                                                                                                                                                                                                                                                                                                                       100
                                                                                                                                                                                                                                                                                                                                                                                                       200
                                                                                                                                                                                                                                                                                                                                                                                                       300
                                                                                                                                                                                                                                                                                                                                                                                                       400
                                                                                                                                                                                                                                                                                                                                                                                                       500
                                                                                                                                                                                                                                                                                                                             SAND (TOPSOIL), fine to coarse grained,
                                                                                                                                                                                                                                                                                                                             dark grey, with organics
                                                                                                                                                                                                                                                                                                                             SAND (FILL), fine to medium grained, grey



                                                                                                                                                                                                                                                                                                                                                                                              L




                                                                                                                                                                                                                                                                                        1

                                                                                                                                                                                                                                                                                                             SW              SAND, fine to medium grained, pale grey,
                                                                                                                                                                                                                                                                                                                             (AEOLIAN)
                                                                                                                                                                                                                                          Not Encountered
       TECTONIC 3.00.2 LIB.GLB Log 1 TECTONIC BOREHOLE 25408.GPJ <<DrawingFile>> 29/1/2026 13:55 10.02.00.04 Datgel Lab and In Situ Tool - DGD | Lib: Tectonic 3.00.2 2021-03-30 Prj: Tectonic 3.00.2 2021-03-30




                                                                                                                                                                                                                                                                                                                                                                                   D to
                                                                                                                                                                                                                                                                                        2
                                                                                                                                                                                                                   HA




                                                                                                                                                                                                                                                                                                                                                                                    M

                                                                                                                                                                                                                                                                                                                                                                                            MD




                                                                                                                                                                                                                                                                                        3




                                                                                                                                                                                                                                                                                                                                                                                              D



                                                                                                                                                                                                                                                                                        4
                                                                                                                                                                                                                                                                                                                             Hole Terminated at 4.00 m
                                                                                                                                                                                                                                                                                                                             Target depth




                                                                                                                                                                                                                             Method                                       Penetration                                        Water                   Samples and Tests                        Moisture Condition          Consistency/Relative Density
                                                                                                                                                                                                                        AD/T-Auger Drilling TC Bit                                 VE - Very Easy        Level (Date)                         U## - Undisturbed Sample (## mm)                    D - Dry                     VS - Very Soft
                                                                                                                                                                                                                        AD/V-Auger Drilling V Bit                                  E - Easy                                                   DS - Disturbed Sample                               M - Moist                   S - Soft
                                                                                                                                                                                                                        RT - Rotary Tri-cone Bit                                                         Inflow                               BDS- Bulk Disturbed Sample                          W - Wet                     F - Firm
                                                                                                                                                                                                                        RD - Rotary Drilling                                       F - Firm                                                   SPT - Standard Penetration Test                                                 VSt - Very Stiff
                                                                                                                                                                                                                                                                                                         Partial Loss
                                                                                                                                                                                                                        NMLC -Rock Core                                            H - Hard                                                                                                                                   H - Hard
                                                                                                                                                                                                                                                                                   VH - Very hard       Complete Loss
                                                                                                                                                                                                                        HA - Hand Auger                                                                                                                                                               Plastic Limit           VL - Very Loose
                                                                                                                                                                                                                                                                                 Graphic Log/Core Loss                                                                                                                        L   - Loose
                                                                                                                                                                                                                                                                                                                                                     Classification Symbols                              < PL                 MD - Medium Dense
                                                                                                                                                                                                                                                                                    Core recovered (hatching                                         and Soil Descriptions                                                    D - Dense
                                                                                                                                                                                                                                                                                    indicates material)                                                                                                  = PL
                                                                                                                                                                                                                                                                                                                                                      Based on Unified Soil                              > PL                 VD - Very Dense
                                                                                                                                                                                                                                                                                    Core loss                                                         Classification System                                                   Fr - Friable



Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 26

                                                                                                                                                                                                                                                                                                                                                                                                                                      Borehole No.

                                                                                                                                                                                                                                                                                                                                                                                                                                            BH2
                                                                                                                                                                                                                                                                                                                                                                                                                                      Page 1 of 1

                                                                                                                                                                                                                   Engineering Log - Borehole                                                                                                                             Project No.:                     25408

                                                                                                                                                                                                                        Client:                                 Made One Pty Ltd                                                                                          Commenced:                       19/1/2026
                                                                                                                                                                                                                        Project Name:                           Proposed Residential Unit Development                                                                     Completed:                       19/1/2026
                                                                                                                                                                                                                        Hole Location:                          17 Bottlebrush Avenue, Noosa Heads                                                                        Logged By:                       MM
                                                                                                                                                                                                                        Hole Position:                          509098.0 m E 7080452.0 m N MGA2020 Zone 56                                                                Checked By:                      OD
                                                                                                                                                                                                                        Drill Model and Mounting:                                Hand Auger                                               Inclination: -90°               RL Surface:                 No survey
                                                                                                                                                                                                                        Hole Diameter:                                           100 mm                                                   Bearing:     360°               Datum:                      AHD       Operator:        MM

                                                                                                                                                                                                                                           Drilling Information                                                                                          Material Description and Observations




                                                                                                                                                                                                                                                                                                                                                                                   Relative Density
                                                                                                                                                                                                                                                                                                            Classification                                                                                                       DCP TEST
                                                                                                                                                                                                                            Penetration




                                                                                                                                                                                                                                                                                                                                                                                                        Pocket




                                                                                                                                                                                                                                                                                                                                                                                   Consistency
                                                                                                                                                                                                                                                                                              Graphic Log


                                                                                                                                                                                                                                                            Samples                                                                         Material Description
                                                                                                                                                                                                                                                                                                                                                                                                      Penetrometer




                                                                                                                                                                                                                                                                                                                                                                                   Condition
                                                                                                                                                                                                                                                                      Recovery




                                                                                                                                                                                                                                                             Tests                                                            soil type: plasticity or particle characteristics,




                                                                                                                                                                                                                                                                                                                                                                                   Moisture
                                                                                                                                                                                                                                                                                                                                                                                                         UCS                  Blows per 100 mm
                                                                                                                                                                                                                                                                                                            Symbol
                                                                                                                                                                                                                   Method




                                                                                                                                                                                                                                                                                                                               secondary and minor components, colour
                                                                                                                                                                                                                                          Water




                                                                                                                                                                                                                                                            Remarks               RL Depth                                                                                                               (kPa)
                                                                                                                                                                                                                                                                                  (m) (m)                                                                                                                             0   5     10     15    20   25




                                                                                                                                                                                                                                                                                                                                                                                                       100
                                                                                                                                                                                                                                                                                                                                                                                                       200
                                                                                                                                                                                                                                                                                                                                                                                                       300
                                                                                                                                                                                                                                                                                                                                                                                                       400
                                                                                                                                                                                                                                                                                                                                                                                                       500
                                                                                                                                                                                                                                                                                                                             SAND (TOPSOIL), fine to coarse grained,                         VL
                                                                                                                                                                                                                                                                                                                             dark grey, with organics
                                                                                                                                                                                                                                                                                                                             SAND (FILL), fine to medium grained, dark
                                                                                                                                                                                                                                                                                                                             grey



                                                                                                                                                                                                                                                                                                                                                                                              L
                                                                                                                                                                                                                                                                                                             SW              SAND, fine to medium grained, pale grey,
                                                                                                                                                                                                                                                                                                                             (AEOLIAN)

                                                                                                                                                                                                                                                                                        1
                                                                                                                                                                                                                                          Not Encountered




                                                                                                                                                                                                                                                                                                                                                                                   D to
                                                                                                                                                                                                                   HA




                                                                                                                                                                                                                                                                                                                                                                                    M
       TECTONIC 3.00.2 LIB.GLB Log 1 TECTONIC BOREHOLE 25408.GPJ <<DrawingFile>> 29/1/2026 13:55 10.02.00.04 Datgel Lab and In Situ Tool - DGD | Lib: Tectonic 3.00.2 2021-03-30 Prj: Tectonic 3.00.2 2021-03-30




                                                                                                                                                                                                                                                                                        2
                                                                                                                                                                                                                                                                                                                                                                                            MD




                                                                                                                                                                                                                                                                                        3
                                                                                                                                                                                                                                                                                                                             Hole Terminated at 3.00 m
                                                                                                                                                                                                                                                                                                                             Target depth




                                                                                                                                                                                                                                                                                        4




                                                                                                                                                                                                                             Method                                       Penetration                                        Water                   Samples and Tests                        Moisture Condition          Consistency/Relative Density
                                                                                                                                                                                                                        AD/T-Auger Drilling TC Bit                                 VE - Very Easy        Level (Date)                         U## - Undisturbed Sample (## mm)                    D - Dry                     VS - Very Soft
                                                                                                                                                                                                                        AD/V-Auger Drilling V Bit                                  E - Easy                                                   DS - Disturbed Sample                               M - Moist                   S - Soft
                                                                                                                                                                                                                        RT - Rotary Tri-cone Bit                                                         Inflow                               BDS- Bulk Disturbed Sample                          W - Wet                     F - Firm
                                                                                                                                                                                                                        RD - Rotary Drilling                                       F - Firm                                                   SPT - Standard Penetration Test                                                 VSt - Very Stiff
                                                                                                                                                                                                                                                                                                         Partial Loss
                                                                                                                                                                                                                        NMLC -Rock Core                                            H - Hard                                                                                                                                   H - Hard
                                                                                                                                                                                                                                                                                   VH - Very hard       Complete Loss
                                                                                                                                                                                                                        HA - Hand Auger                                                                                                                                                               Plastic Limit           VL - Very Loose
                                                                                                                                                                                                                                                                                 Graphic Log/Core Loss                                                                                                                        L   - Loose
                                                                                                                                                                                                                                                                                                                                                     Classification Symbols                              < PL                 MD - Medium Dense
                                                                                                                                                                                                                                                                                    Core recovered (hatching                                         and Soil Descriptions                                                    D - Dense
                                                                                                                                                                                                                                                                                    indicates material)                                                                                                  = PL
                                                                                                                                                                                                                                                                                                                                                      Based on Unified Soil                              > PL                 VD - Very Dense
                                                                                                                                                                                                                                                                                    Core loss                                                         Classification System                                                   Fr - Friable



Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 27

                                                                                                                                                                                                                     CLIENT      : Made One Pty Ltd                                SHEET   : 1 OF 1
                                                                                                                                                                                                                     CONTRACTOR :
                                                                                                                                                                                                                     PROJECT     : Proposed Residential Unit Development
                                                                                                                                                                                                                     LOCATION    : 17 Bottlebrush Avenue, Noosa Heads
                                                                                                                                                                                                                     PROJECT No. : 25408

                                                                                                                                                                                                                                                                   TEST: DCP3
                                                                                                                                                                                                                                  LOGGED: OD 28/1/2026 CHECKED: OD
                                                                                                                                                                                                                                  EASTING: 509088.6 m NORTHING: 7080451.0 m
                                                                                                                                                                                                                                  MGA2020 Zone 56
                                                                                                                                                                                                                      Depth (m)




                                                                                                                                                                                                                                                Blows per 100 mm
                                                                                                                                                                                                                                  0      5        10        15      20        25




                                                                                                                                                                                                                     0.5




                                                                                                                                                                                                                     1.0




                                                                                                                                                                                                                     1.5




                                                                                                                                                                                                                     2.0
           TECTONIC 3.00.2 LIB.GLB Log IS DCP 3 PER PAGE 25408.GPJ <<DrawingFile>> 29/1/2026 13:55 10.02.00.04 Datgel Lab and In Situ Tool - DGD | Lib: Tectonic 3.00.2 2021-03-30 Prj: Tectonic 3.00.2 2021-03-30




                                                                                                                                                                                                                     2.5




                                                                                                                                                                                                                     3.0




                                                                                                                                                                                                                     3.5




                                                                                                                                                                                                                     4.0




                                                                                                                                                                                                                     4.5




                                                                                                                                                                                                                      Comments




Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 28

                                                                                                               TERMS USED ON LOGS

       DRILLING/EXCAVATION METHOD
       AD*        Auger Drilling                       RD      Rotary Blade or Drag bit            NQ         Diamond Core - 47 mm
       *V         V-Bit                                RT      Rotary Tri-cone bit                 NMLC       Diamond Core - 52 mm
       *T         TC-Bit                               RA      Rotary Air                          HQ         Diamond Core - 63 mm
       HA         Hand Auger                                                                       HMLC       Diamond Core – 63mm
       ADH        Hollow Auger                                                                     BH         Tractor Mounted Backhoe
                                                                                                   EX         Tracked Hydraulic Excavator



       WATER
       GROUNDWATER NOT                          The observation of groundwater, whether present or not, was not possible due to drilling water,
       OBSERVED                                 surface seepage or cave in of the borehole/test pit.
       GROUNDWATER NOT                         The borehole/test pit was dry soon after excavation. However, groundwater could be present in
       ENCOUNTERED                             less permeable strata. Inflow may have been observed had the borehole/test pit been left open
                                               for a longer period.

       SAMPLING AND TESTING
       SPT                             Standard Penetration Test to AS1289.6.3.1-2004
       5,4,10 N=14                     5,4,10 = Blows per 150mm. N = Blows per 300mm penetration following 150mm seating
       30/65mm                         Where practical refusal occurs, the blows and penetration for that interval are reported
       RW                              Penetration occurred under the rod weight only
       HW                              Penetration occurred under the hammer and rod weight only
       HB                              Hammer double bouncing on anvil
       DS                              Disturbed sample
       BDS                             Bulk disturbed sample
       FV                              Field vane shear test expressed as uncorrected shear strength (sv = peak value, sr = residual value)
       PP                              Pocket penetrometer test expressed as instrument reading in kPa
       U50                             Thin walled tube sample - number indicates nominal sample diameter in millimetres
       DCP                             Dynamic cone penetration test
       CPT                             Electronic cone penetration test
       CPTu                            Electronic cone penetration test with pore pressure (u) measurement



                                                                                                                                           Rev1
                                                                                                                                     August 2024




Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 29

                                                                                            METHOD OF SOIL DESCRIPTION
                                                                                                         USED ON LOGS
                  CLASSIFICATION AND INFERRED STRATIGRAPHY
                  Soil is classified and described in borehole and test pit logs using the preferred method given in AS1726 – 2017.
                  The material properties are assessed in the field by visual/tactile methods.
                   Particle Size                                                                      Plasticity Properties

                   Major           Sub Division           Particle Size
                  Division
                            BOULDERS                      > 200 mm
                             COBBLES                     63 to 200 mm
                                       Coarse             19 to 63 mm
                   GRAVEL              Medium             6.7 to 19 mm
                                          Fine           2.36 to 6.7 mm
                                       Coarse            0.6 to 2.36 mm
                     SAND              Medium            0.21 to 0.6 mm
                                        Fine             0.075 to 0.21
                                   SILT                  0.002 to 0.075
                               CLAY                       < 0.002 mm
                                                                             NOTE: The U line is an approximate upper bound for most materials.
                                                                             Data which plot above the U line may represent unusual/problem soil
                                                                             behavior, or unreliable data and should be considered carefully.

                  MOISTURE CONDITION                                                AS1726 - 2017

                  Coarse Grained Soils
                  Symbol       Term              Description
                      D             Dry          Sands and gravels are free flowing.
                      M             Moist        Soils are darker than in the dry condition & may feel cool. Sands and gravels tend to cohere.
                      W            Wet           Soils exude free water. Sands and gravels tend to cohere
                  Fine Grained Soils
                  Symbol        Description
                    w < PL      Moist, dry of plastic limit, (hard and friable or powdery)
                    w = PL      Moist, near plastic limit, (soils can be moulded at a moisture content approximately equal to the plastic limit)
                    w > PL      Moist, wet of plastic limit, (soils usually weakened and free water forms on hands when handling)
                    w = LL      Wet, near liquid limit
                    w > LL      Wet, wet of liquid limit

                  CONSISTENCY AND DENSITY                                          AS1726 - 2017
                   Symbol      Term       Undrained Shear                        Symbol        Term              Density Index %        SPT “N” #
                                             Strength
                      VS            Very Soft             0 to 12 kPa               VL         Very Loose          Less than 15            0 to 4
                      S                Soft              12 to 25 kPa                  L          Loose               15 to 35            4 to 10
                      F                Firm              25 to 50 kPa              MD        Medium Dense             35 to 65           10 to 30
                      St               Stiff             50 to 100 kPa              D            Dense                65 to 85           30 to 50
                      VSt           Very Stiff          100 to 200 kPa              VD         Very Dense            Above 85           Above 50
                       H            Hard             Above 200 kPa
                  In the absence of test results, consistency and density may be assessed from correlations with the observed behaviour of
                  the material.
                  # SPT correlations are not stated in AS1726 – 2017, and may be subject to corrections for overburden pressure and
                  equipment type.




                                                                                                                                                  Rev3
                                                                                                                                         November 2024
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 30

                                                                                        METHOD OF ROCK DESCRIPTION
                                                                                                     USED ON LOGS

             CLASSIFICATION AND INFERRED STRATIGRAPHY
             Rock is classified and described in borehole and test pit logs using the preferred method given in AS1726 – 2017.
             The material properties are assessed in the field by visual/tactile methods.

             STRENGTH
                                                 Point Load
                Symbol             Term         Index, Is(50)                                       Field Guide
                                                   (MPa)
                   VL              Very         0.03 to 0.1       Material crumbles under firm blows with sharp end of pick; can be peeled
                                   Low                            with knife; too hard to cut a triaxial sample by hand. Pieces up to 30 mm
                                                                  can be broken by finger pressure.
                    L              Low           0.1 to 0.3       Easily scored with a knife; indentations 1 mm to 3 mm show in the specimen
                                                                  with firm blows of pick point; has dull sound under hammer. A piece of core
                                                                  150 mm long by 50 mm diameter may be broken by hand. Sharp edges of core
                                                                  may be friable and break during handling.
                    M            Medium           0.3 to 1        Readily scored with a knife; a piece of core 150 mm long by 50 mm diameter
                                                                  can be broken by hand with difficulty.
                    H              High              1 to 3       A piece of core 150 mm long by 50 mm diameter cannot be broken by hand but
                                                                  can be broken with pick with a single firm blow; rock rings under hammer.
                  VH               Very           3 to 10         Hand specimen breaks with pick after more than one blow; rock rings under
                                   High                           hammer.
                  EH            Extremely            >10          Specimen requires many blows with geological pick to break through intact
                                  High                            material; rock rings under hammer.
             Relationship between Is(50) and UCS (unconfined compressive strength) will vary with rock type and strength, and
             should be determined on a site-specific basis. UCS is typically 10 to 30 x Is(50), but can be as low as 5.

             ROCK MATERIAL WEATHERING
                 Symbol                      Term                                                   Field Guide
                                                                  Soil developed on extremely weathered rock; the mass structure and
                                            Residual
                    RS                                            substance fabric are no longer evident; there is a large change in volume
                                              Soil                but the soil has not been significantly transported.
                                          Extremely               Rock is weathered to such an extent that it has soil properties - i.e. it either
                   EW
                                          Weathered               disintegrates or can be remoulded, in water.
                                                                  Whole of rock is discoloured, usually by iron staining or bleaching to the
                                                                  extent that the colour of the original rock is not recognizable. Rock strength
                                    Highly
             HW                                                   is significantly changed by weathering. Porosity may be increased by
                                   Weathered
                                                                  leaching, or may be decreased due to deposition of weathering products in
                                                 Distinctly
                         DW                                       pores.
                                                 Weathered
                                                                  Whole of rock is discoloured, usually by iron staining or bleaching to the
                                   Moderately                     extent that the colour of the original rock is not recognizable; but shows little
             MW
                                   Weathered                      or no change of strength from fresh rock.

                                           Slightly               Rock is slightly discoloured but shows little or no change of strength relative
                   SW
                                          Weathered               to fresh rock.
                    FR                       Fresh                Rock shows no sign of decomposition or staining.
             ABBREVIATIONS FOR DEFECT TYPES AND DESCRIPTIONS
            Defect Type                                         Coating or Infilling                    Roughness
               CS/CZ    Crushed seam/zone (Fault)                 Ca     Calcite                          Po      Polished
               DB       Drilling break                            Clay   Clay                             Sm      Smooth
               EW       Extremely weathered seam                  Cn     Clean                            Sl      Slickensided
               HB       Handling break                            Co     Coating ( > 1mm)                 Ro      Rough
               IS/IZ    Infilled seam/zone                        Fe     Iron oxide                       VRo     Very rough
                                                                  Op     Open
               J        Joint
                                                                  Qz     Quartz
               Pt       Parting                                   St     Stain                         Planarity
               SS/SZ    Sheared seam/zone (Fault)                 Vn     Veneer (<1mm)                    Cu       Curved
               Vn       Vein                                      X       Carbonaceous                    Dis       Discontinuous
                                                                                                          Ir       Irregular
                                                                                                          Pl        Planar
                                                                                                          St        Stepped
                                                                                                          Un        Undulating
                                                                                                                                              Rev5
                                                                                                                                        August 2024
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 31

                Appendix B
                AGS Guidlines - Qualitative Terminology for
                Use in Assesing the Risk to Property




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0                      19
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 32

                                                     PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                                                                             APPENDIX C: LANDSLIDE RISK ASSESSMENT
                                                   QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY


                QUALITATIVE MEASURES OF LIKELIHOOD

            Approximate Annual Probability
                                                            Implied Indicative Landslide
                                                                                                                                    Description                                           Descriptor               Level
             Indicative            Notional                    Recurrence Interval
               Value               Boundary
                10-1                    5x10-2
                                                             10 years                           The event is expected to occur over the design life.                                ALMOST CERTAIN                   A
                                                                                   20 years     The event will probably occur under adverse conditions over the
                     -2
                10                                        100 years
                                                                                                design life.
                                                                                                                                                                                    LIKELY                           B
                                           -3
                   -3                5x10                                       200 years
                10                                        1000 years                            The event could occur under adverse conditions over the design life.                POSSIBLE                         C
                                     5x10-4                                     2000 years
                                                                                                The event might occur under very adverse circumstances over the
                10-4                                     10,000 years
                                                                                                design life.
                                                                                                                                                                                    UNLIKELY                         D
                   -5                5x10-5                                     20,000 years
                10                                                                              The event is conceivable but only under exceptional circumstances
                                                        100,000 years                                                                                                               RARE                             E
                                                                                                over the design life.
                   -6                 5x10-6                                    200,000 years
                10                                     1,000,000 years                          The event is inconceivable or fanciful over the design life.                        BARELY CREDIBLE                  F
                Note:     (1)     The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.


                QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY

               Approximate Cost of Damage
                                                                                                              Description                                                                 Descriptor               Level
             Indicative                Notional
               Value                   Boundary
                                                        Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
                200%                                                                                                                                                               CATASTROPHIC                      1
                                                        stabilisation. Could cause at least one adjacent property major consequence damage.
                                       100%
                                                        Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
                60%                                                                                                                                                                MAJOR                             2
                                                        stabilisation works. Could cause at least one adjacent property medium consequence damage.
                                        40%
                                                        Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
                20%                                                                                                                                                                MEDIUM                            3
                                                        Could cause at least one adjacent property minor consequence damage.
                                        10%
                 5%                     1%              Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works.                 MINOR                             4
                                                        Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
                0.5%                                                                                                                                                               INSIGNIFICANT                     5
                                                        notional boundary of 0.1%. See Risk Matrix.)
                Notes:    (2)     The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
                                  unaffected structures.
                          (3)     The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
                                  works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
                                  accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
                          (4)     The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa


                                                                                   Australian Geomechanics Vol 42 No 1 March 2007
                68039 Landslide Risk Management Issued 10/7/07
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 33

                                                     PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                          APPENDIX C: – QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)


                QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
                                  LIKELIHOOD                                                  CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
                                                        Indicative Value of        1: CATASTROPHIC                 2: MAJOR                3: MEDIUM                4: MINOR                    5:
                                                       Approximate Annual                200%                         60%                      20%                     5%                INSIGNIFICANT
                                                           Probability                                                                                                                        0.5%
          A –     ALMOST CERTAIN                                10-1                         VH                         VH                      VH                       H                   M or L (5)
                                                                  -2
          B -     LIKELY                                        10                           VH                         VH                       H                       M                       L
          C -     POSSIBLE                                      10-3                         VH                          H                       M                       M                      VL

          D -     UNLIKELY                                      10-4                          H                         M                        L                       L                      VL
                                                                  -5
          E -     RARE                                          10                            M                          L                       L                      VL                      VL
                                                                  -6
          F -     BARELY CREDIBLE                               10                            L                         VL                      VL                      VL                      VL
                Notes:    (5)     For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
                          (6)     When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
                                  time.


                RISK LEVEL IMPLICATIONS
                                       Risk Level                                                                                Example Implications (7)
                                                                              Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
                   VH                         VERY HIGH RISK                  options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
                                                                              property.
                                                                              Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
                    H                               HIGH RISK
                                                                              risk to Low. Work would cost a substantial sum in relation to the value of the property.
                                                                              May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
                    M                         MODERATE RISK                   implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
                                                                              implemented as soon as practicable.
                                                                              Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
                    L                               LOW RISK
                                                                              required.
                                                                              Acceptable. Manage by normal slope maintenance procedures.
                    VL                        VERY LOW RISK

                  Note:   (7)     The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
                                  given as a general guide.




                                                                                   Australian Geomechanics Vol 42 No 1 March 2007
                68039 Landslide Risk Management            Issued 10/7/07
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 34

                    PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007



                         APPENDIX G - SOME GUIDELINES FOR HILLSIDE CONSTRUCTION

                                   GOOD ENGINEERING PRACTICE                                                            POOR ENGINEERING PRACTICE
              ADVICE
              GEOTECHNICAL         Obtain advice from a qualified, experienced geotechnical practitioner at early       Prepare detailed plan and start site works before
              ASSESSMENT           stage of planning and before site works.                                             geotechnical advice.
              PLANNING
              SITE PLANNING        Having obtained geotechnical advice, plan the development with the risk              Plan development without regard for the Risk.
                                   arising from the identified hazards and consequences in mind.
              DESIGN AND CONSTRUCTION
                                   Use flexible structures which incorporate properly designed brickwork, timber        Floor plans which require extensive cutting and
                                   or steel frames, timber or panel cladding.                                           filling.
                HOUSE DESIGN
                                   Consider use of split levels.                                                        Movement intolerant structures.
                                   Use decks for recreational areas where appropriate.
              SITE CLEARING        Retain natural vegetation wherever practicable.                                      Indiscriminately clear the site.
                  ACCESS &         Satisfy requirements below for cuts, fills, retaining walls and drainage.            Excavate and fill for site access before
                 DRIVEWAYS         Council specifications for grades may need to be modified.                           geotechnical advice.
                                   Driveways and parking areas may need to be fully supported on piers.
              EARTHWORKS           Retain natural contours wherever possible.                                           Indiscriminatory bulk earthworks.
                                   Minimise depth.                                                                      Large scale cuts and benching.
                     CUTS          Support with engineered retaining walls or batter to appropriate slope.              Unsupported cuts.
                                   Provide drainage measures and erosion control.                                       Ignore drainage requirements
                                   Minimise height.                                                                     Loose or poorly compacted fill, which if it fails,
                                   Strip vegetation and topsoil and key into natural slopes prior to filling.           may flow a considerable distance including
                                   Use clean fill materials and compact to engineering standards.                       onto property below.
                     FILLS         Batter to appropriate slope or support with engineered retaining wall.               Block natural drainage lines.
                                   Provide surface drainage and appropriate subsurface drainage.                        Fill over existing vegetation and topsoil.
                                                                                                                        Include stumps, trees, vegetation, topsoil,
                                                                                                                        boulders, building rubble etc in fill.
                ROCK OUTCROPS      Remove or stabilise boulders which may have unacceptable risk.                       Disturb or undercut detached blocks or
                 & BOULDERS        Support rock faces where necessary.                                                  boulders.
                                   Engineer design to resist applied soil and water forces.                             Construct a structurally inadequate wall such as
                                   Found on rock where practicable.                                                     sandstone flagging, brick or unreinforced
                 RETAINING
                                   Provide subsurface drainage within wall backfill and surface drainage on slope       blockwork.
                   WALLS
                                   above.                                                                               Lack of subsurface drains and weepholes.
                                   Construct wall as soon as possible after cut/fill operation.
                                   Found within rock where practicable.                                                 Found on topsoil, loose fill, detached boulders
                                   Use rows of piers or strip footings oriented up and down slope.                      or undercut cliffs.
                  FOOTINGS
                                   Design for lateral creep pressures if necessary.
                                   Backfill footing excavations to exclude ingress of surface water.
                                   Engineer designed.
                                   Support on piers to rock where practicable.
              SWIMMING POOLS       Provide with under-drainage and gravity drain outlet where practicable.
                                   Design for high soil pressures which may develop on uphill side whilst there
                                   may be little or no lateral support on downhill side.
                  DRAINAGE
                                   Provide at tops of cut and fill slopes.                                              Discharge at top of fills and cuts.
                                   Discharge to street drainage or natural water courses.                               Allow water to pond on bench areas.
                   SURFACE         Provide general falls to prevent blockage by siltation and incorporate silt traps.
                                   Line to minimise infiltration and make flexible where possible.
                                   Special structures to dissipate energy at changes of slope and/or direction.
                                   Provide filter around subsurface drain.                                              Discharge roof runoff into absorption trenches.
                                   Provide drain behind retaining walls.
                  SUBSURFACE
                                   Use flexible pipelines with access for maintenance.
                                   Prevent inflow of surface water.
                                   Usually requires pump-out or mains sewer systems; absorption trenches may            Discharge sullage directly onto and into slopes.
                   SEPTIC &
                                   be possible in some areas if risk is acceptable.                                     Use absorption trenches without consideration
                   SULLAGE
                                   Storage tanks should be water-tight and adequately founded.                          of landslide risk.
                  EROSION          Control erosion as this may lead to instability.                                     Failure to observe earthworks and drainage
                 CONTROL &         Revegetate cleared area.                                                             recommendations when landscaping.
                LANDSCAPING
              DRAWINGS AND SITE VISITS DURING CONSTRUCTION
                 DRAWINGS          Building Application drawings should be viewed by geotechnical consultant
                 SITE VISITS       Site Visits by consultant may be appropriate during construction/
              INSPECTION AND MAINTENANCE BY OWNER
                  OWNER’S          Clean drainage systems; repair broken joints in drains and leaks in supply
               RESPONSIBILITY      pipes.
                                   Where structural distress is evident see advice.
                                   If seepage observed, determine causes or seek advice on consequences.




                                          Australian Geomechanics Vol 42 No 1 March 2007                                                                  113

Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 35

                    PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007




            114                        Australian Geomechanics Vol 42 No 1 March 2007

Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 36

                Appendix C
                Limitations




        Geotechnical Investigation
        30 January 2026 | 25408-001-Rev0   20
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 37

        Limitations

        This document has been prepared for the purpose outlined in Tectonic’s proposal and no responsibility is
        accepted for the use of this document, in whole or in part, for any other purpose.
        The scope of Tectonic’s Services are as described in Tectonic’s proposal, and are subject to restrictions
        and limitations. Tectonic did not perform a complete assessment of all possible conditions or
        circumstances that may exist at the site referenced in the report. If a service is not expressly indicated, do
        not assume it has been provided. If a matter is not addressed, do not assume that any determination has
        been made by Tectonic in regards to it.
        Conditions may exist which were undetectable given that economic and time constraints limit the
        practical extent of geotechnical investigation. Variations in conditions may occur between investigation
        locations, and there may be special conditions pertaining to the site which have not been revealed by the
        investigation and which have not therefore been taken into account in the document. Where variations
        exist on site, additional studies and actions may be required.
        Tectonic’s opinions are based upon information that existed at the time that the work was performed.
        The passage of time, man-made or natural events, may alter the site conditions. It is understood that the
        Services undertaken allowed Tectonic to form an opinion of the actual conditions of the site at the time
        the site was visited and cannot be used to assess the effect of any subsequent changes in the quality of
        the site, or its surroundings, or any laws or regulations.
        Any assessments made in the preparation of this document are based on the conditions indicated from
        published sources and the findings of the investigation described. Actual subsurface conditions may
        differ from those indicated in the document (e.g. between boreholes or test pits). No warranty is
        included, either express or implied, that the actual conditions will conform exactly to the assessments
        contained in this document.
        Where data supplied by the client or other external sources, including previous site investigation data,
        have been used, it has been assumed that the information is correct unless otherwise stated. No
        responsibility is accepted by Tectonic for incomplete or inaccurate data supplied by others.
        This document is provided for the sole use by the Client and its professional advisers. No responsibility
        whatsoever for the contents of this document will be accepted to any person other than the Client. Any
        use which a third party makes of this document, or any reliance on or decisions to be made based on it,
        is the responsibility of such third parties. Tectonic accepts no responsibility for damages, if any, suffered
        by any third party as a result of decisions made or actions based on this document.




        Limitations
        August 2024 | Rev2
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Page 38

                         PO Box 899        tectonicgeo.com.au   [email protected]
                   Buderim
        Geotechnical         QLD 4555
                     Investigation
        30 January 2026 | 25408-001-Rev0                                                   21
Document Set ID: 25158026
                  24528612
Version: 1,
         2, Version Date: 10/09/2026
                          13/02/2026

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Document - MCU26 0001 & OPW26 0002 - AS PUBLISHED.pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.