Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
risk during rain events. This MP outlines the procedures and processes to be used to minimise erosion and mitigate the impact on water quality of the creek. Bushfire Management Plan Although the site has been assessed as having a ‘Low’ fire hazard, it is heavily vegetated and the proposed building designs are in close proximity to vegetation there is a need understand and manage the risks associated with bushfire. The Bushfire Management Plan identifies the bushfire risk relating to the development site. It further identifies mitigation techniques and procedures which are to be employed during the construction and operational phases of the development. Following completion of the final development phase the Bushfire Management Plan will require review to address the ongoing management of the site. Stormwater and Water Quality Protection Management Plan Construction and operation of the development has potential to impact on the water quality of the creek onsite and its downstream tributaries. This management plan details the procedures to minimise the risk to the water quality as well as the monitoring and reporting procedures to be followed. This management plan will reference other management plans which will assist in maintaining good water quality. Groundwater Protection Management Plan The high porosity of the sandy soils onsite raises the potential for groundwater contamination through leaching of chemicals, waste and materials onsite. This management plan details the procedures and methodologies to be followed to minimise any impact on the ground water during the construction and operational phase of the development. Air Quality and Dust Management Plan Construction will involve spoil extraction and disposal, vehicle movements and other construction activities which produce some dust. The Air Quality Management Plan outlines measures to control dust in accordance with the requirements of the Queensland Environmental Protection Act 1994 and the Environmental Protection (Air) Policy 1997 which preclude the release of dust in a manner that is unreasonable and causes environmental harm (Part 4, Division 14, Environmental Protection (Air) Policy 1997). Storage and handling of Hazardous Substances Construction will involve the use of hazardous materials, some of which may require storage over the life of the project. This MP outlines measures to control the storage, handling and disposal of such substances. Noise & Vibration Management Plan Noise and vibration associated with construction activities have the potential to impact on residents and local fauna including Koalas. The Noise and Vibration Management Preliminary EMP: Attunga Heights Issue: 1 | 6 Chenoweth EPLA Revision: 0 12/12/2007 |
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.