Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555

of 216

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

ATTUNGA HEIGHTS PRELIMINARY EMP

2.1.5 Pest Management Plan

The introduction of Pest (non-native animal or non-local native animals) species can have a detrimental effect on resident native fauna and flora
Issues and effect the long term viability of populations
Maintain a site free from non native and non local native animal species.

Objectives

    
  

Implementation Strategy Performance Indicators

The introduction of pests to the site will be prevented by the following. Construction and Operational
* No domestic animals are aflowed onsite. Phase EMP
¢ Inspection of all materials entering the site to ensure they are free of rats and mice before No domestic animals enter the site.
entering the site.
¢ — Residents are to be supptied with an information pack outlining their obligations in not
keeping domestic animals.

   
    
   
 
 
 

 
   
  
  

2.15.1
Prevent the introduction of pests to the
site

  

    
 

   
    
 

Information pack is developed and
delivered to residents,

  
  
 
 

All material entering the site
undergoes inspection.

     
 
    
  

     

    
     
 
 
 

  
  
 

2.15.2
Prevent the establishment of pest
animal population’s onsite.

Pest populations can be prevented from establishing onsite by the following activities,
¢ No domestic animals are allowed onsite.
« — Ensure all materials stored onsite are checked as part of regular environmental inspections,
especially for rats and mice.
¢ — Inspect nest boxes, undercrofts of buildings and any other areas for rats and pest birds such
as Indian Miner birds, Starlings ete

Construction and Operational
Phase EMP
No domestic animals enter the site.

   

   
    
  
 

Environmental inspections include
reports on pest species onsite

  

 

 

Particular Responsibilities Principal & Superintendent — Engage a suitably qualified contractor to carry out pest control as needed. Engage and liaise with
environmental auditor.

Contractor — Ensure inspections are carried out. Notify pest controller as required. Liaise with Environmental Auditor.

Environmental Auditor — Carry out regular environmental inspection.

Corrective Action Domestic animals removed from site immediately.
Pest controller called to eradicate pest immediately.

     

Issue: 1
Revision: 0 12/12/2007

Attunga Heights

  
   

    
  

Chenoweth EPLA

 

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.