ATTUNGA HEIGHTS PRELIMINARY EMP

2.1.16 Emergency Response Overview Management Plan

Issues Although all measures will be taken to prevent emergency situations, there is a risk that on-site accidents will occur.
There is negligible risk of exposing contaminated fill or Acid Sulphate Soils, hence these issues are not addressed in this EMP.

Objectives To respond quickly and appropriately to accidents, spillages (especially of hazardous materials), fire and heavy rainfall.

[Target ——_—| Implementation Strategy Performance Indicators

2.1.16.1 All construction workers will be aware of fire hazards and emergency procedures. Construction and Operational

Reduce the chances of accidents Phase EMP

associated with human error. Site and construction management will take a risk management approach to identifying potential hazards. Absence of avoidable accidents, and
rapid appropriate responses if an
accident occurs

2.1.16.2 Construction and Operational
Minimise damage from spills Manage spills quickly and appropriately. Should a fuel spill occur the following Emergency Response Phase EMP
Procedure shall be implemented: - Rapid response with minimal damage
» Contain spill within bunded area;
* Use absorbent materials stored on site to clean-up spill;
Dispose of contaminated fuel/absorbent material waste to an approved disposal container/facility;
Notify the Superintendent immediately should the spill breach the bunding and flow towards the
stormwater (i.e. if there is a possibility of environmental harm being caused).
Site operations will be conducted such that the practical minimum quantity of hazardous materials is
stored on-site.
Transport will be in accordance with the health and safety regulations, good practices and manufacturer
recommendations.
* Construct temporary fencing around the bunded area to prevent machinery or other damage to the bund
during all stages of the project.
© Bunded rainwater will be drained using the bund drain valve following periods of rainfall.
Contaminated rainwater (if any) within bunded area will be pumped to slop tanks for subsequent
disposal.

Preliminary EMP: Attunga Heights Issue: 1
Chenoweth EPLA Revision: 0 12/12/2007

 

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.