Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ATTUNGA HEIGHTS PRELIMINARY EMP 2.1.16 Emergency Response Overview Management Plan Issues Although all measures will be taken to prevent emergency situations, there is a risk that on-site accidents will occur. There is negligible risk of exposing contaminated fill or Acid Sulphate Soils, hence these issues are not addressed in this EMP. Objectives To respond quickly and appropriately to accidents, spillages (especially of hazardous materials), fire and heavy rainfall. [Target ——_—| Implementation Strategy Performance Indicators 2.1.16.1 All construction workers will be aware of fire hazards and emergency procedures. Construction and Operational Reduce the chances of accidents Phase EMP associated with human error. Site and construction management will take a risk management approach to identifying potential hazards. Absence of avoidable accidents, and rapid appropriate responses if an accident occurs 2.1.16.2 Construction and Operational Minimise damage from spills Manage spills quickly and appropriately. Should a fuel spill occur the following Emergency Response Phase EMP Procedure shall be implemented: - Rapid response with minimal damage » Contain spill within bunded area; * Use absorbent materials stored on site to clean-up spill; Dispose of contaminated fuel/absorbent material waste to an approved disposal container/facility; Notify the Superintendent immediately should the spill breach the bunding and flow towards the stormwater (i.e. if there is a possibility of environmental harm being caused). Site operations will be conducted such that the practical minimum quantity of hazardous materials is stored on-site. Transport will be in accordance with the health and safety regulations, good practices and manufacturer recommendations. * Construct temporary fencing around the bunded area to prevent machinery or other damage to the bund during all stages of the project. © Bunded rainwater will be drained using the bund drain valve following periods of rainfall. Contaminated rainwater (if any) within bunded area will be pumped to slop tanks for subsequent disposal. Preliminary EMP: Attunga Heights Issue: 1 Chenoweth EPLA Revision: 0 12/12/2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.