Attunga Heights Rehabilitation Specification 19

7.3.5 Water retention

Where, in the opinion of the Bush Rehabilitation Contractor, the soil will not retain sufficient
moisture to enable rapid plant establishment an additive such as Rainsaver crystals should be
added to the soil according to manufacturer’s specifications. This is likely to be necessary within
sandy environments.

7.3.6 Water

Trees are to be watered in with a minimum of 5-10L of water each at the time of planting and
when watered during maintenance.

7.4 MAINTENANCE

7.4.1 Weed Control

Spot spraying of weeds within each planting area will be necessary on a monthly basis for several
months, then bi-monthly until canopy cover suppresses weed growth. Periodic treatments will be
necessary there after.

7.4.2 Replacement Planting

Replace dead as per technique outlined in Section 7.3.2 and species outlined in Attachment 2.
Dead plants will be replaced within 3 months of senescing.

7.4.3 Watering

Watering of planted stock will be undertaken on an as needs basis depending on weather
conditions. However, as a minimum it is anticipated that plants will be watered at least twice
within the first 6 months of planting and once during the following 6 months.

7.4.4 Re-mulching

Mulch is to be placed around planted rainforest species where canopy closure is absent.

7.4.5 Timing

Restoration work to be placed on maintenance prior to commencement of the use of the site.
Following commencement of the on maintenance phase the work shall be maintained for a period
of 12 months.

 

Chenoweth EPLA 078103_Rehab_12_12_07.doc Dee ‘07

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.