Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
CS C4 bl Coo J EL Bushfire Management Plan Lot 27 RP 89506 5. Developed Site Management The proposed layout the sketch shows the areas of development and the retained open space. 5.1 Vegetation Management 5.1.1 Development Nodes The overall landscape strategy focuses upon creating an upped layer of tree canopy with a ground cover of grasses, lawns and retaining walls. Selected areas will have a middle layer of shrubs including Banksia, Grevillea, Lomandra and Jacksonia to provide refuge for smaller animal and bird life. This will present no problems from a bush fire perspective provided there is no vertical development of fuels within ten metres of houses. §.1.2 Open Space Zones This long-term aim is to move most of the site towards a rainforest cypress over storey with a range of moist understorey combinations. This will provide good bushfire protection because these areas are largely fire proof in their current condition. 5 THE CONSULTANCY BUREAU 03-099 Bushfire Management Pian Commercial in Confidence Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.