Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Jf L 3a 63 eo eo coo lL lees £ Lod Bushfire Management Plan Lot 27 RP 89506 7. Conclusions ° Bushfire management is not an issue in connection with this development because: o The land to be developed is of a low hazard rating category. o The land is surrounded on all sides by existing development of low bush fire hazard. o The nearby National park contains significant areas of rainforest with tracks, roads and management to minimise fire risk. o Fire history in the area is low and there is significant fragmentation of fuels with roads and tracks and development. o The development will further reduce the fire hazard on the subject lands. ° The provision of an Information Kit to purchasers on the development will help develop fire management ethics over the area and surrounds. THE CONSULTANCY BUREAU 03-099 Bushfire Management Plan Commercial In Confidence Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.