Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555

of 216

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

 

    
     

CY Refurbistiment landscape restorato, 2. works to Be
~~ _ undertaken in accordance with Coundirequireme
7 “also to the approval and satisfaction of Veqdian s
77 vegetation treatment Ke

Inte mal ecological restoration planting intogavaklable
spaces surrounding the building envelope to providé 7 ~~
blending backdrop to the natural envirgament

  

  
        
 

« SITE BOUNDARY

 

 

 

 

 

BOUNDARY —
VARY

   

Council walkway. Path contruction and walkway. Path contruction and ecological
ecological restoration works in accordance Proposed fauna-friendly security perimeter fence pia ee ne ee ar works in accordance with
with Council direction a are ‘ouncil direction

— / -

Proposed pathway linkage to existing L Existing footpath - connection to Hastings street -o" eee Future pathway linkage to existing Council

 

Existing footpath - connection to
Hastings street

 

LZP01 - LANDSCAPE ZONING PLAN
LEGEND NOTES SCALE 1:800 @ A3/1:400 @A1
Rehabilitation planting zone 1. Future landscape works to Lodge entry from Attunga
Heights to be undertaken after building contruction to tT

Lodge. Se 7 [fe Op Wate ee
ee] Intensive rehabilitation planting zone —= x zt a bare
2. Vegetation rehabilitation work to be undertaken across e a0

EE Amenity rehabilitation planting zone whole site
Future Lodge construction and
landscape works zone
1 m wide raised concrete

RA deck-styie path

SI 1 m wide raised timber deck path to

SQ match footbridge treatment

IS Pedestnan footbridge access

&] 1.2 m wide mulch maintenance track

CJ Fauna-fnendly security boundary fence

Attunga Heights
Extent of zone to be included in future
Lodge construction and landscape works Landscape

CA Site entry interface area eoning
; Plan
(J Existing tree to be retained for Attunga Heights Py Ltd

dob Me 078103 Dae 13-12-07
[e ] Existing tree to be removed Dewon SF tone

Drow RS Fin 078103-L-Adwg

 

 

 

 

 

 

 

 

 

 

 

 

LZP-01

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.