Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
SUBMISSIONS
Thirty two (32) properly made submissions were received on the application. In accordance
with section 3.5.15(2)(i) of the IPA, the name and address of the principal submitter for each
properly made submission is attached.
RIGHTS OF APPEAL
Under section 3.6.7(1)(e) of the Integrated Planning Act 1997 (IPA), this decision is taken to
be the original assessment manager's decision, but may not be appealed.
CURRENCY PERIOD
The standard currency period stated in section 3.5.21(2) of IPA applies to development in
this approval.
Desley Boyle MP {
Minister for Environment
Minister for Local Government and Planning
Minister for Women
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.