17. 18. 19. -6- To secure performance of all conditions of this approval, security in the form of a cash bond or trading bank guarantee to the sum of $250,000 for the Multiple Dwelling and $50,000 for the Accommodation Building (Lodge) must be submitted to Council, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. The applicant must obtain all of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for Building Works. Amenity - Genera! [email protected] shall be no substantial detrimental effect upon the amenity of the neighbourhood, including the Viridian Development, by reason of the creation of excessive noise, lighting nuisance or other emissions by or from the Development, including that caused by cars accessing either along Alma Way or manoeuvring within the development. a) Swimming pools (if any) are to be used only between 7:00am and 9:00 pm daily. b) Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or located in a manner that prevents a noise nuisance beyond the site in accordance with the environmental nuisance provisions of the Environmental Protection Regulation 1998. c) The applicant must ensure that no builder or building contractor carries out building work on a building site in a way that makes or causes audible noise to be made from the building work on:- i) Monday to Saturday, before 7:00am or after 6:30pm, and ii) Sunday or public holiday, at any time. Lighting 22. a) The level of illumination, at a distance of 1.5 metres outside the boundary of the Site, Tesulting from direct, reflected or other incidental light emanating from the Site shall not exceed eight lux measured at any level upwards from ground level. b) Lighting is to be directed downwards so as to minimise any adverse effects of glare or direct light nuisance on all adjacent allotments (including Lot 106 on SP 151408- the Viridian development), but must achieve a minimum level of illumination consistent with the safety of pedestrians and vehicles. ¢) Lighting to any walkways, where required, is to be low level bollard type lighting, down lighting or foot lights that achieve the minimum of illumination and light spillage consistent with safety for pedestrians and vehicles. Buildings and Other Structures 23. a) The colours of the buildings shall be muted tones of browns, greens, ochres, blues and greys selected from a suitable colour palette. b) The project is not to be staged (other than the Lodge component in Attunga Heighis). c) Air conditioning units for the dwellings/cabins shall be located so as to not face the Viridian development where the dwellings / cabins are located east of the creek and adjacent to the eastern shared boundary with the Viridian development. d) Any spoil from construction activities to be removed from the site shall be by means other than through Lot 106 on SP 151408 (except that such removal shall be allowed whilst construction activity is under way on Lot 106 — the Viridian development). e) The applicant shall construct at its cost pedestrian access connections to the public pathway to be constructed on Lot 106 adjacent to Alma Way. An easement for this purpose to be agreed with the owners of Lot 106 and duly executed.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.