Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007 [Portable Long Service Leave (PLSL) levy for building and construction work J 13. Is payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit for the application can be given? [J No Yes 13(b). Has the PLSL levy been paid? No - Complete and submit a QLeave Notification and Payment Form. The receipted form must be sighted by the assessment manager before a development permit can be given. (1 Yes - Complete Table L and submit, with the application, the "yellow" (Local Govemment's (Council) / Private Certifier's) copy of the receipted QLeave Form. OFFICE USE ONLY Date Received 4] A L|=4 Reference Numbers | oT ( 2ss5 [ FOR COMPLETION BY ASSESSMENT MANAGER 4 Is a QLeave Notification and Payment Form required for this application? LJ No (] Yes - Complete Table M [ NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER | To Council | have been engaged as the private certifier for the buitding work referred to in this application Date of hati EE att « ot engagement Accreditation number Name BSA Certification number Building classification
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.