Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Phase Applicability 8/3 i No Description < s 5 Report Compliance Comments 2Z Ss = Reference a & 6 a a . a ec g °o oO oO 47 |The Fire Management Plan shall demonstrate a high level of Refer to Fire environmental care and responsibility and consistent with best Management Plan practice for developments of this type in similar environments. 48 [The Fire Management Pian shall meet the provisions of the Refer to Fire Queensland Fire and Rescue Service Act 1990 and shall be Management Plan endorsed by the Queensland Fire & Rescue Service. 49 |The Fire Management Plan is to be implemented by the applicant Refer to Fire land future owners of the site. Management Plan 50 |The Development shall comply with the fire management plan Refer to Fire and which shall be addressed by the Community Management Management Plan Statement for the bodies corporate. 51. |The Developer shall provide a bushfire information kit to Refer to Fire purchasers of the multipte dwellings on the site. The bushfire Management Plan information kit shall be submitted to Council for approval as part of the Fire Management Plan. 52 |The Fire Management Plan shalt incorporate all the relevant Refer to Fire requirements of, and be consistent with, all the other Management Plan management plans required by this approval. Sediment and Erosion Control Plan §3 |Detailed staged Sediment and Erasion Control Plans shail be Refer to Erosion and prepared for the site and implemented by the applicant. The Sediment Control Plan Plans shail be in accardance with the Institution of Engineers Austratia ‘Engineering Guidelines for Queensland Soil and Sediment Control’ (June 1996) and in particular using Checklist No. 3 from that document. The Sediment and Erosion Control Plans shalt cover ali development on site (during the construction, establishment and operational phases), ecological restoration and remediation works. All recommendations of the Plans shail be implemented. 54 |The Sediment and Erosion Control Plans shall atso ensure the Refer to Erosion and protection of the areas of retained and enhanced vegetation and Sediment Control Plan shall: 54.1 |identify existing erosion problems, and Refer to Erosion and Sediment Contra! Plan 55 [All necessary erosion and sediment contral devices shall be Refer to Erosion and incorporated within the development precincts. The applicant Sediment Control Plan must ensure that Any person acting on this permit shall prevent erosion and sediment export from leaving the site or entering the creek. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will ba necessary. In this regard plans detailing the methods of controlling erosion Refer to Erosion and and sediment are required to be submitted ta the Cauncil for Sediment Control Pian approval prior to obtaining a Development Permit for Operational Works. Stormwater and Water Quality Management Plan 56 |A Stormwater and Water Quality Management Plan for the site Refer to Stormwater shall be prepared and imptemented by the appticant prior to the Management Plan issue of a Development Permit for Operational Works. 57. |The Stormwater and Water Quality Management Plan shail take Refer to Stormwater into account matters specified in section 19.4 of the Environmental Protection (Water) Policy 1997. Management Plan FAPROJECTS 20071078217 - Attunga Heights Development Approval (mwg)\06B217 - 071205 - prk - Condition compliance matrix.s
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.