07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ATTUNGA HEIGHTS PRELIMINARY EMP DOCUMENT STRUCTURE This Environmental Management Plan (EMP) is issued in two parts: e Part 1: EMP Strategy, with issues and objectives. ¢ Part 2: EMP Elements for implementation during the construction and operational phases of the development. It includes specific actions, responsibilities and forms, and incorporating approval conditions where appropriate. Part 2 may include guidelines and appended reports. The various parts, component elements and phases of the EMP interact with the approval, tendering and construction processes as follows: PROJECT STAGE ENVIRONMENTAL MANAGEMENT | Proiect Planning & Desien Imnact Assessment & Mitigation Measures ——. —. DEVELOPMENT APPLICATION PRELIMINERY EMP * f Approval Conditions OPERATIONAL WORKS _—_—> DETAILED CONSTRUCTION & a= OPERATIONAL PHASE EMP s (Incorporating Contractor’s procedures) Contractor appointed -_ Construction | —~_1. Training, Monitoring and Reporting Operation _ * - This document. Chenoweth EPLA 078103_EMP_12_12_07 i
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.