Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ATTUNGA HEIGHTS PRELIMINARY EMP CONTENTS DOCUMENT STRUCTURE DOCUMENT CONTROL ENVIRONMENTAL POLICY STATEMENT & COMMITMENT PART 1: PRELIMINARY EMP STRATEGY 3 1.0 PRELIMINARY ENVIRONMENTAL MANAGEMENT PLAN STRATEGY 3 1.1 PURPOSE 3 1.2 Planning Approvals And Requirements 3 1.4 Environmental Issues 4 1.5 EMP Roles & Responsibilities 8 1,5.1 General 8 1.6 Communication and reporting 13 1.6.1 Communication 13 1.6.2 Reporting 13 1.6.3 Access & Inspections - Construction 14 1.7 DESIGN AND CONSTRUCTION PLANNING 14 1.8 TRAINING AND AWARENESS 14 1.9 MONITORING AND TESTING 15 1.9.1 Machinery & Materials 15 1,9.2 Monitoring Equipment 15 1.10 COMPLAINT, NON-COMPLIANCE, INCIDENTS & CORRECTIVE ACTION 15 1.10.1 Complaints 15 1.10.2 Non-Compliance 16 1.10.3 Environmental Incidents 16 1,10.4 Corrective Action 17 1.11 ENVIRONMENT RECORDS 17 PART 2: EMP ELEMENTS 5 2.0 ENVIRONMENTAL MANAGEMENT PLAN 5 2.1 ENVIRONMENTAL MANAGEMENT PLANS 1 2.1.1 Site Management and Control Plan 1 2.1.2 Vegetation Management Plan 2 2.1.3 Fauna Habitat Management Plan 6 2.1.4 Weed Management Plan 8 2.1.5 Pest Management Plan 9 2.1.6 Soil Erosion and Sediment Control EMP 10 1 Chenoweth EPLA 078103 EMP_12_12_07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.