Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ATTUNGA HEIGHTS PRELIMINARY EMP developer and Noosa Shire Council in fulfilling their environmental obligations set out in the Ministerial approval and ensuring industry best practice management of construction works and ongoing operation. The EMP is part of an integrated approach to environmental management and ensures that Local, State and Commonwealth environmental management requirements are met. This EMP demonstrates compliance with conditions 28, 29 30, 31 and 32 of the Ministerial Approval. 1.3 STRUCTURE AND SCOPE EMP’s are prepared and implemented to address identified impacts of a development that need to be controlled. The Environmental Protection Agency’s (EPA) Guidelines for Preparing Environmental Management Plans state that an EMP includes: e Agreed performance criteria and objectives in relation to environmental and social impacts; e Detailed prevention, minimization and mitigation strategies (including design standards) for controlling environmental impacts at specific sites; ¢ Details of the proposed monitoring of the effectiveness of remedial measures against agreed performance criteria in consultation with relevant government agencies and the community; ¢ Details of implementation responsibilities for meeting environmental management; e Timing (milestones) of environmental management initiatives; e Reporting requirements and auditing responsibilities for meeting environmental performance objectives; and e Corrective actions to rectify any deviation from performance standards. An EMP sets out the targets and associated performance indicators required to achieve best practice environmental management with respect to each of the environmental issues for the whole development site. A preliminary EMP is appropriate at concept or preliminary stages when detailed construction plans are not available or are available for only part of the proposed development. 1.4 ENVIRONMENTAL ISSUES The subject land occupies a 1.8 ha site, approximately rectangular (north-south) between Attunga Heights, Alma Way & Edgar Bennett Road, Noosa Heads. The site is accessed from Alma Way, across an ephemeral watercourse flowing north from the adjacent Viridian Noosa development site, past Halse Lodge and beneath Noosa Drive before discharging to Noosa Sound. On the western side of the creek, the subject land comprises a forested sandy hillside which rises to the unmade road reserve of Edgar Bennett Road near Picture Point. The site is currently occupied by a single house at the end of Attunga Heights. [ Chenoweth EPLA 078103_EMP_12_12_07 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.