Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Attachment 2: Environmental Management Plan Elements in Part 2 The following list of EMP Elements responds to environmental issues identified for the project under the Ministerial Conditions. Consistent with the preliminary nature of this document (see Introduction), all EMP Elements in Part 2 are preliminary at this stage of application. Once planning approval and conditions have been received, contractors have been appointed and construction details are confirmed, the EMP include amendments to EMP Elements as required. EMP Element ~ Location in Current Issue Date of Addendum | Date of Original EMP Part 2 Status Included EMP element Vegetation Management 1 Plan Fauna Management Plan 1 Weed and Pest Management 1 Plan Erosion and Sediment l Control Management Plan Bushfire Management Plan 1 Stormwater and Water 1 Quality Management Plan Ground Water Protection 1 Management Plan Air Quality and Dust 1 Management Plan Storage and handling of 1 Hazardous Substances Noise & Vibration 1 Management Plan Waste Management Plan 1 Cultural Heritage 1 Management Plan Visual Amenity 1 Management Plan Community Liaison 1 Management Plan Emergency Response Plan 1 Preliminary EMP: Attunga Heights Issue: 1 | 1 Chenoweth EPLA Revision: 0 12/12/2007 |
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.