NOOSA COUNCIL IDAS Development Application Decision Notice 6
Town Water Supply
28. The site shall be connected to Council’s existing town water supply and be constructed in accordance with
Council’s standards and requirements at no cost to Council.
29. Each water connection to the water reticulation system shall extend to the property boundary and be
metered. Where multiple units are served by a single service, multiple water meters to each individual unit
shall be installed. All fees for the supply of water meters shall be paid to the Council.
Earthworks
30. Any earthworks required on site shall be carried out in a manner that does not affect any of the
neighbouring properties. To this end, earthworks shall be in accordance with Section 3.8 of Council’s
Engineering Design Standards Manual and carried out so as not to cause the ponding of water on any
adjoining lands or the blockage of, or interference with, any natural watercourses.
Erosion and Sediment Control
31. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste,
will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.
Headworks
32. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30 on
Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the
rates applicable at the time of payment. An estimate only of the contribution rates as of March 2002 under
the current policies is as follows:
Water Supply $ 4,497
Sewerage $ 3,228
TOTAL $ 7,725
All headworks contributions must be paid prior to the issue of a Development Permit for Operational
Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks
contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
the contribution or trading bank guarantee will be returned.
General
33. Any damage caused to any public utility during the course of construction shall be repaired to Council’s
standards and at no cost to Council.
34. Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.
35. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be
covered to prevent materials including dust being windblown from the vehicle.
Environmental Health
36. The developer must provide a suitably screened imperviously paved area large enough for all refuse and
recycling containers.
H o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
22783 DA Decision Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 257 KB (small file)
- File type
No other editions are linked here.