Council archive · source document
ECM_20704161_v1_TPC 2530 - Town Planning Consent Permit with Conditions - 14 July 1993 · 51993.674.01
Document Set ID: 20704161 Version: 1, Version Date: 21/09/2018 [OCR of page images] Town Planning Consent Permit - TPC 2530 Page 4 10. 11. 12. 13. 14. 15: 16. 17. Document Set ID: 20704161 Roof and surface water is to be collected on site and is to be discharged through a single underground drain line into existing drainage in Sunseeker Close to the satisfaction of the Shire Engineer. A Building Approval shall not be granted until the Shire Engineer has approved of the drainage scheme. Provision of approved refuse containers in accordance with the requirements of the Refuse Management Regulations of 1983 for the storage and collection of refuse to the satisfaction of Council's Environmental Health Officer. Provision of an imperviously paved area upon which to stand all refuse containers together with a suitable enclosure, if required, to enclose the refuse container area to the satisfaction of the Environmental Health Officer. Any flat or unit intended to be let out for fee or reward is to be licensed annually with Council's Health Department in accordance with the provisions of Chapter 43 of Council's By-Laws prior to such letting. Submission of a cash bond or trading bank guarantee to the sum of $2,000 to secure performance of conditions, prior to the issue of Building Approval. The cash bond or trading bank guarantee will be returned upon performance of the conditions of approval. The provisions of this approval are to be effected, prior to the commencement of the approved use. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval for the purposes of litigation should the use not be conducted in accordance with this approval. The Town Planning Consent Permit may be revoked pursuant to Section 4.14 of the Local Government (Planning and Environment) Act if commencement of erection or works have not been made in accordance with that Permit or the rights conferred by that Permit are not exercised within two (2) years of the date of issue of the Permit. The Town Planning Consent Permit lapses where:— a. the use or erection of a building or other structure associated with the use, has not been commenced within four (4) years of the date of issue of the Town Planning Consent Permit, unless application is made and approved by Council for an extension; or b. the use of any premises pursuant to the Town Planning Consent Permit ceases for a period of twelve (12) months. Version: 1, Version Date: 21/09/2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ECM_20704161_v1_TPC 2530 - Town Planning Consent Permit with Conditions - 14 July 1993.pdfRelated documentApplication case desk ↗
About this file
- File size
- 907 KB (small file)
- File type
No other editions are linked here.