SUPERSEDED Decision Notice MCU26 0064 & OPW26 0093 (As Published) · MCU26/0064
Plan No. Rev. Plan/Document Name Date
S01 C1 Drawing Schedule & Transmittal 29/06/2026
Prepared by Long View Consulting
Engineers
S02 C1 Structural notes Sheet 29/06/2026
Prepared by Long View Consulting
Engineers
S03 C1 Site Plan, Framing Plan, Elevations 29/06/2026
Prepared by Long View Consulting
Engineers
S04 C1 Jetty Framing Details Sheet 1 29/06/2026
Prepared by Long View Consulting
Engineers
S05 C1 Jetty Framing Details Sheet 2 29/06/2026
Prepared by Long View Consulting
Engineers
Currency Period
2. The Currency Period for this development approval lapses if all conditions have not been
complied with, and the plan of survey lodged with Council for endorsement by 10 September
2026, unless an application to extend the currency period is approved by Council.
Performance Bond
3. Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
commencement of the works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of this approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Bonds
4. Bonds must:
a. meet the requirements of Council’s relevant Planning Scheme Policy for performance
and uncompleted works.
b. be calculated using a schedule of works and relevant bond equation.
c. be lodged with Council and accompanied by the Bond Administration Fee/s.
General Conditions
5. All structures must be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall
6. All structures must have no detrimental effects on stormwater drains and/or easements.
7. Jetties must have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the
revetment wall.
8. A rigid handrail must be fitted on one side of the walkway. The handrail must be of an open
design and in accordance with the approved plans.
Page 2 of 6
Document Set ID: 25156707
Version: 2, Version Date: 10/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice MCU26 0064 & OPW26 0093 (As Published).pdfRelated documentApplication case desk ↗
Decision Notice MCU26 0064 & OPW26 0093 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 147 KB (small file)
- File type
No other editions are linked here.