Noosa on Weyba
QCP Assessment
                                                                                         CI"Cardnoe

6                      Tidal Inundation


6.1                    Tailwater Condition

The TUFLOW model set up for the flooding              analysis of the site was used to determine the future tidal
inundation extent.          As noted above, the QCP deems all areas subject to future tidal inundation as being
erosion prone, which is a position which we do not agreed with in this case. The tailwater condition was set
as a sinusoidal tide, and        scaled to match the 2100 HAT level of 1.48 mAHD at Munna Point. The resultant
tailwater condition is shown below in        Image 1.   The initial water level was set at 0.8 mAHD, which is the
future mean sea level.


           1.600




           1.400
                            /"\


           1.200
                        / \                                                  _,--.....




           1.000
                       /   \                   I \
                                       \
      C
      I
      <{
      .s0.800
                   V                     \
                                              /   l\
                                             /
      >
      Q)
      _J



           0.600
                                         \          ’"        /                                        /
                                                                                             "--"’"


           0.400
                                          \ /
                                                ’-./

           0.200




           0.000
                   o                                       Time (days)



Image 1                  Climate Change HAT at Munna Point




6.2                    Results

The resultant HAT level in Lake Weyba was 1.13 mAHD, due to attenuation provided within the lake and
creeks. This level is similar to the current HAT level of Lake Weyba of 0.32 mAHD plus 0.8 metres (i.e. 1.12
mAHD), and is therefore considered a reasonable prediction of the 2100 HAT level in Lake Weyba.




Northbrook Corp Pty Ltd and J&K Hofmann                  Version 2                                  15 October 2012
QCP Assessment v2.docx                            Commercial in Confidence                                  Page 8

Used in these records

About this file

File size
26.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 10 of 37 Appendix 8 - Queensland Coastal Plan Assessment MCU12_0208.pdf · 26.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.