Part 10 of 37 Appendix 8 - Queensland Coastal Plan Assessment MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Very large file (26.4 MB): may take a few minutes to open.
Noosa on Weyba
QCP Assessment
CI"Cardnoe
7 QCP Storm-tide Hazard
7.1 Summary
The site is not currently located within the Urban
Footprint of the South East Queensland Regional Plan
(SEQRP),and has a non-urban zoning. It therefore cannot be classified as an Urban Locality in accordance
with the requirements of the QCP
Policy 2.5 of the QCP deals with high and medium coastal hazard areas in urban areas, and would apply to
the site if it had an urban designation. For the purposes of this analysis, it has been assumed that an urban
designation will be achieved over the site at some time in the future. This is not a matter for engineering
consideration, and will be the subject of work to be completed by others. Without this designation,
development within high and medium hazard areas would not be permissible.
Medium hazard areas are classified as areas with less than 1 m depth of storm-tide inundation and high
hazard areas are classified as areas with greater than 1 m depth of storm-tide inundation. Based on the
default QCP storm-tide value of 2.18 mAHD the high hazard areas are therefore at levels below 1.18 mAHD.
The medium and high hazard areas are shown on Figure 3.
The high hazard area is contained within the proposed waterway corridor, with a road crossing required for
access purposes. The high hazard area on site is therefore not being developed. However, if development
within the high hazard proposed, according to policy 2.5.1 it could not proceed unless there is a
area was
relevant adaptation strategy in the planning scheme. Policy 2.5.2 states that, where an adaptation strategy
is not appropriately reflected in a relevant planning instrument, development may occur in a high hazard area
if a suitable risk assessment demonstrates that adverse coastal hazard impacts are satisfactorily managed.
Since Council has not yet adopted any adaptation strategy, it is obviously not reflected in the planning
scheme. If a risk assessment is conducted, which demonstrates that there is no increased risk as a
consequence of development of the site, development in the high coastal hazard areas can be approved.
A similar outcome is derived for the medium coastal hazard areas under policy 2.5.3. Urban development
can occur if a suitable risk assessment is completed. By using appropriate earthworks, the site could be
made fully safe against tidal inundation and storm surge, thereby immediately removing the coastal hazard
designation entirely. It is accepted that a formal Coastal Risk Hazard Assessment will be required at some
time in the future to facilitate any requisite approval under this section of the QCP. This matter is addressed
in Section 7.3 below.
7.2 Proposed Development
The proposed development is unique as it is the only Biodiversity Development Offset Area (BDOA)site
declared by the Queensland State Government. This BDOA declaration allows a development application to
be lodged over the subject site, with the purpose of extending the SEQRP Urban Footprint.
It is proposed to fill the lots within the western drainage channel to a level of 3.40 mAHD or greater. This will
provide over 500mm of freeboard to the 100 year ARI peak flood level, with climate change. Similarly all
other areas of the site will include climate change factors when determining the appropriate floor levels. The
proposed waterway crossings will allow for trafficable access to the site during a Probable Maximum Flood
(PMF)event. The PMF event is greater than the 100 year ARI event with climate change.
The flood modelling has shown that there is no adverse flooding impact on neighbouring properties in local
and regional flood events for all events up to and including the 100 year ARI event.
The proposed development will provide improved flood access for neighbouring sites. The existing
development around Lake Entrance Boulevard currently has access limited for 2 year ARI events and above.
An alternative 100 year ARI trafficable access route has been proposed.
For further details of the proposed development refer to the Cardno Flood Study (October,2012).
Northbrook Corp Pty Ltd and J&K Hofmann Version 2 15 October 2012
QCP Assessment v2.docx Commercial in Confidence Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 10 of 37 Appendix 8 - Queensland Coastal Plan Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 26.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.