Part 10 of 37 Appendix 8 - Queensland Coastal Plan Assessment MCU12/0208

of 48

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (26.4 MB): may take a few minutes to open.

Log in to see the plans as drawn
Noosa on Weyba
QCP Assessment
                                                                                      CI"Cardnoe

8                 Draft Coastal Protection State Planning Regulatory
                  Provision


8.1              Summary
On the 8th of October 2012 the State Planning Policy 3/11: Coastal Protection was suspended so that the
State Government could undertake           a   review.   The Draft Coastal Protection State   Planning Regulatory
Provision (DSPRP)will be in effect in the interim. The DSPRP appears to enshrine the general intent of the
QCP while removing the specific restrictions on development in the coastal area. The DSPRP still requires
consideration of issues such as land    use planning and coastal hazards, but does not contain the explicit

prohibitions or restrictions on urban development that were contained in the SPP 3/11. The DEHP coastal
hazard mapping remains in place.


8.2               Erosion Prone Areas

The DSPRP states that "to the extent practicable, erosion prone areas are to remain undeveloped apart from
acceptable temporary or relocatable structures for safety and recreational purposes". The proposed
development does not extend into erosion prone areas, as redefined by detailed tidal inundation mapping
(refer Figure 2), therefore this requirement is met. The proposed road crossing is a required "coastal
dependent public access facility", and is therefore acceptable.

8.3               Storm-tide Hazard

The DSPRP states that:

"Development in areas on the coastal zone identified as having a high risk of being affected by coastal
hazards needs to be carefully considered and wherever possible, be retained undeveloped. Where an area
vulnerable to storm tide inundation is developed, or has a development commitment, further development in
these areas needs to address:

(a)its vulnerability to sea level rise and storm tide inundation

(b)the proposed access to and protection of evacuation routes."
The proposed         development will take into account future sea level rise and increases in rainfall intensity.
Suitable mitigation measures have been proposed in the design to ensure that people and property are not
at unacceptable risk.       The proposed access routes to the site will be trafficable in a PMF event, and flood
access to     neighbouring areas will be improved.
It is therefore considered that development within the defined coastal hazard areas is acceptable based on
the conditions of the DSPRP.




Northbrook Corp Pty Ltd and J&K Hofmann                  Version 2                                  15 October 2012
QCP Assessment v2.docx                            Commercial in Confidence                                 Page 12

Used in these records

About this file

File size
26.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 10 of 37 Appendix 8 - Queensland Coastal Plan Assessment MCU12_0208.pdf · 26.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.