Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Part 10 of 37 Appendix 8 - Queensland Coastal Plan Assessment MCU12/0208

of 48

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (26.4 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                         Noosa on Weyba




4             Conclusion

Cardno has been     engaged to conduct an erosion hazard assessment for a land parcel on the western
foreshore of Lake Weyba. As part of the assessment Cardno has estimated design wave criteria near the
foreshore at the site and conducted storm induced shoreline erosion modelling for a range of locations and
scenarios. The results of such analyses then informed an erosion hazard assessment of the study site
based upon methodology outlined in the QLD Coastal Hazard Guidelines (2011).

The results of this assessment depict the erosion prone areas for the current day, 2050 and 2100 scenarios.
The figures indicate that even for the 2100 scenarios the erosion prone areas remain within the Lake Buffer
Zone (outlined in Appendix A) and do not encroach upon any of the proposed residential lots.

Importantly, comparisons with current erosion prone area mapping as provided in the Queensland Coastal
Plan (using non site-specific parameters), shows that the erosion prone area calculated by Cardno does not
extend as far inland as the current Queensland Coastal Plan based mapping. The differences between these
two assessments can be attributed their respective methods of analyses             -
                                                                                       default based   (DERM)and site
specific (Cardno). The QCP mapping of this study site was part of a broad scale assessment, whilst the
mapping in this report is the result of site specific analyses and modelling and hence can be considered
more appropriate.




28 September 2012                                         Cardno                                                      7
\\ausydcfs01 \COE-Jobs\CM\51 0119-Lake Weyba\009-ReportingDocsandFigures\R001 Ver 1.docx

Used in these records

About this file

File size
26.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 10 of 37 Appendix 8 - Queensland Coastal Plan Assessment MCU12_0208.pdf · 26.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.