Part 10 of 37 Appendix 8 - Queensland Coastal Plan Assessment MCU12/0208

of 48

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (26.4 MB): may take a few minutes to open.

Log in to see the plans as drawn
Noosa on Weyba
QCP Assessment
                                                                                    CI"Cardnoe

1                 Introduction


The subject site encompasses the following lots:


The J & K Hofmann land:

     .     Lot 7 on RP46782                1.99 ha
     .     Lot 2 on RP160983               93.1 ha
     .     Lot 2 on SP179590               12.5 ha

     .     Lot 53 on SP163571              110.0 ha


The Northbrook Pty Ltd land:


     .     Lot 1667 on M3772               44.4 ha
     .     Lot 11 on RP893393              40.7 ha

     .     Lot 12 on RP893393              0.61 ha




It is proposed to develop around 19 percent of this site for residential purposes, with 4 percent of the site
used    as   parks and lake buffer zone and the remaining 77 percent of site dedicated as greenspace and
conservation areas. The proposed master plan for the development is shown in Appendix A. The combined

development is known as Noosa on Weyba.

According to information provided by the Department of Environment and Heritage Protection (DEHP),the
site is in the coastal zone as defined within the Queensland Coastal Plan 2012 (QCP),and is also located

entirely within the local Coastal Management District. The Department’s website designates parts of the site
as being affected by both storm-tide inundation and regular tidal inundation by year 2100.     The site is

mapped as being affected by two types of coastal hazard; erosion prone areas and storm-tide inundation
areas. The QCP mapping is provided in Appendix B.


On the 8th of October 2012 the Draft Coastal Protection State Planning Regulatory Provision (DSPRP)was
released. The implications of this document are also discussed in this report.

The purpose of this report is to review this mapping and summarise the development potential of the site in

regards to the QCP. To this purpose the following analysis has been conducted:
     .     SBEACH shoreline erosion analysis of Lake Weyba, based on the requirements outlined in the QCP;

     .
           Hydrodynamic analysis of the area utilising TUFLOW to determine the extent of future tidal influence;
           and

     .
           Hydrodynamic analysis of the area utilising TUFLOW to determine the flood levels produced by local
           stormwater runoff.




Northbrook Corp Pty Ltd and J&K Hofmann               Version 2                                   15 October 2012
QCP Assessment v2.docx                        Commercial in Confidence                                    Page 1

Used in these records

About this file

File size
26.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 10 of 37 Appendix 8 - Queensland Coastal Plan Assessment MCU12_0208.pdf · 26.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.