Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Planning Report and plans

Attached to the e-mail Development Application MCU16/0137.

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
7. Suitability of Subject Site for a Gym

TTM acknowledge that the Council parking requirement for a gym is higher than the implied parking
requirement for Unit 5 shown in Table 2. However, it is noted that the peak parking demand of 41 spaces is
significantly below the implied parking requirement for all occupied units of 78 spaces.

Table 4 shows the surveyed parking demand at peak gym and site times. The surveyed parking rate has then
been applied to Scenario D to determine parking demand and car park occupancy for all units except Unit 5.

Table 4: Surveyed Parking Demand – Peak Gym/Site Times
 Time                                                            Peak Surveyed         Scenario D (4,421m2 Unit Area)
                          Peak Surveyed         Scenario B
                                                                Parking Rate (per      Peak Parking        Parking
                            Demand              Unit Area
                                                                   Unit Area)            Demand           Availability
 5:30-7:00am               13 (7:00am)                            1 space/328m2             14                80
                                                                                 2
 9:00am-12:00pm           36 (12:00pm)                            1 space/118m              38                56
                                                 4,261m2
 12:00pm-4:00pm           43 (12:30pm)                            1 space/99m2              45                49
 5:00-7:30pm               14 (5:00pm)                            1 space/304m2             15                79
Table 4 shows that with Units 7 and 9 occupied, with similar uses to existing businesses within site, site parking
demands will not significantly change from surveyed parking demands. Table 5 shows the site parking
availability with the gym based on Table 3 and 5 during peak gym/site operating times.

Table 5: Surveyed Parking Demand – Peak Gym/Site Times
 Time                     Scenario D           Maximum Gym Operation                        85th Gym Operation*
                           Parking                           Parking                                       Parking
                                          Parking Demand                             Parking Demand
                          Availability                      Availability                                 Availability
 7:00am                        80                  33                    47                15                 65
 11:30am                       56                  33                    23                17                 39
 12:30pm                       49                  33                    16                4                  45
 5:00pm                        79                  33                    46                24                 55
* Based on 85th percentile number of patrons on-site at key operating times.

Based on parking surveys of the subject site on a peak gym day and Council parking requirements, Table 5
shows that the site is expected to have a minimum of 16 spaces (17% of total supply) available with full
occupation of the site including the gym.

The primary site use is an employment centre for industrial land. The parking surveys have identified significant
parking availability at all times of the day. With this parking availability, the proposed gym/recreational use
can operate on site, however this must remain a secondary use. It is therefore TTM’s opinion that the subject
Log in to download the original file

Planning Report and plans.pdf · 3.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.