SCRC CORRESPONDENCE




                                                   Place Barcode here



                       THIS IS THE NEXT PART OF A
                      MULTIPLE PART RECORD
                                       Part                  I Of

                 Application number:                                                      {I D ^
                         C 'Documents and Senings\eje\DesktopMulti Pan Record Cover Sheet NEXT PART (3) doe




                                                                           Devellopnient Cou
                                                                                                27 MAY 2011

                                                                                       1t4 arooch ydore.
Full text of the other 25 pages

Page 2

Page 3

                                             TATE PROFESSIONAL ENGINEERS PTY LTD
                                                                                 ABN 28 086 262 035
                                                39 - 45 FIRST AVENUE, MOOLOOLABA QLD 4557
                                                                                                                  TE
                                                         P.O. BOX 1092, MOOLOOLABA QLD 4557
Our Reference:           S3000(RF-Lot 5&6)                                                            CIVIL ENGINEERING
                                                      PHONE l1I'r ,4.i: ,31NI I AX (0-) ,4"" 6100     STRUCTURAL ENGINEERING
                                        WEB www.tate.net.au EMAIL [email protected]               PROJECT MANAGEMENT
25th May 2011



Sunshine Coast Regional Council
Locked Bag 72                                                    Devi c l; larlt Counter
SUNSHINE COAST MAIL CENTRE
NAMBOUR QLD 4560                                                                   27 MAY 2011
Attention: Mr Mark Lewis                                                                               C=:




Dear Sir

RE: PROPOSED 36 RESIDENTIAL UNIT DEVELOPMENT
     AT LOTS 5 & 6 SERENITY CLOSE, NOOSA HEADS
     OPERATIONAL WORKS APPLICATION

Further to our correspondence dated 4th April 2011 and your email response dated 24
May 2011 (attached) requesting a new Operational Works application be submitted
for the above project, please find enclosed the following documentation:

      •   Three (3) sets of engineering drawings as per attached transmittal;
      •   Three (3) copies of Stormwater Management Plan by Tate Professional
          Engineers dated April 2011.
      •   Completed IDAS Forms 1 and 6 and Assessment Checklists 1 and 4;
      •   Cheque for the amount of $ 3,878.00 covering application fees as provided by
          Mark Lewis via email dated 25th May 2011 (attached):

We trust this adequately addresses all issues and ask that Council confirm approval of
the application. Please contact the undersigned at our Mooloolaba office should you
require any further information.




        rrison - Director
for TAT PROFESSIONAL ENGINEERS PTY LTD

Encl.     IDAS Forms & Checklists, cheque $3,878.00
          3 sets of Drawings as per register
          3 x Stormwater Management Plan Report

CC:       Cape Bouvard Developments - Attention: Gary Godfrey



S3000(RF-gen)/11/OPW Application May 2011- SCRC
SH/jl                                                                                                        Page 1 of 1

Page 4

Page 5

Jeanene Lowe

From:                       Carmen Ward
Sent:                       Wednesday, 25 May 2011 12:58 PM
To:                         Jeanene Lowe; Steve Harrison
Subject:                    FW: Attention: Steve Harrison re: Op works application 2008/0951




Carmen Ward

Administration Officer
for TATE PROFESSIONAL ENGINEERS PTY LTD

P O Box 1092 Mooloolaba QId 4557

Phone:        (07) 5457 5300
Fax:          (07) 5477 6100
Email:         [email protected]




From: Mark Lewis [maiIto:[email protected]]
Sent: Wednesday, 25 May 2011 12:46 PM
To: Carmen Ward
Subject: RE: Attention: Steve Harrison re: Op works application 2008/0951

Carmen, based on the current fee schedule, the fee for a 1.456ha site would be $7,920 (site area 5,001 m2 to 2.Oha).

Management have advised that a reduction in the fee calculation is in line with our usual approach to calculate the
affected site area, rather than the full site area (eg. for large sites where only a portion of the site is being
developed). In this instance Council would be prepared to accept a fee of $3,878 (site area 1,401 m2-5,000m2) based
on the approx site area consumed by the works. I assume that the application proposed will be for the same elements
as applied for previously (earthworks, car parking, stormwater and access). Please note that this agreement for
reduction in fee does not automatically apply for the other op works applications required by the overarching MCU.

Mark




From: Carmen Ward [mailto:[email protected]]
Sent: Wednesday, 25 May 2011 10:46 AM
To: Mark Lewis
Subject: RE: Attention: Steve Harrison re: Op works application 2008/0951

Mark,
Due to the time that has already lapsed on this application since we originally lodged our submission on
the 4`h April 2011, can you please have your Council Manager of Operational Works calculate the fees and
advise how they calculated the fees, taking into consideration the reduction of fees that you mentioned in
your email of today, to avoid any further costly delays to our Client.
                                                           1

Page 6

Carmen Ward

Administration Officer
for TATE PROFESSIONAL ENGINEERS PTY LTD

P 0 Box 1092 Mooloolaba Qld 4557

Phone:             (07) 5457 5300
Fax:               (07) 5477 6100
Email:              [email protected]




From: Mark Lewis [mailto:[email protected]]
Sent: Tuesday, 24 May 2011 2:01 PM
To: Carmen Ward
Subject: Attention: Steve Harrison re: Op works application 2008/0951

Steve, I discussed your request with regard to this application with my coordinator and it has been decided that we
could not include the most recent information in the old application for a number of reasons, the most prominent being
that the application is considered to have lapsed.
In order to progress the works you are required to submit a new opworks application for the items listed in Decision
Notice 132009.699.05 dated 20 May 2011 (the most recent version of the mcu approval) in conjunction with the
relevant fee. Please note that the current details for the site are Lot 5 on SP195871 (the plan was registered on 20
May 2009). You will need to ensure that your plans are amended to reflect the current description and dimensions.
There is an opportunity for you to request a reduced fee by either applying for the reduced fee prior to making the
application or requesting a reduction in the fee at the time of the application. The determination of the required fee will
be by Council's Manager of Operational Works.

Please give me a call if you wish to discuss further.

Mark Lewis
Senior Engineering Officer
Civil Engineering
Operational Works Assessment Branch
Sunshine Coast Regional Council
Ph 5475 9970
W www.sunshInecoast.qld.gov.au
A Locked Bag 72, Sunshine Coast Mail Centre, QId 4560



 Sunshine Coast
 Council

 © Fa
        cebook
To find out more about the Sunshine Coast Council, visit your local office at Caloundra, Maroochydore, Nambour or Tewantin or visit us online at
www sunshinecoast qld gov au. If correspondence includes personal information, please refer to Council's Privacy Policy


This email and any attachments are confidential and only for the use of the addressee. If you have received this email in error you are requested to notify the
sender by return email or contact council on 1300 00 7272 and are prohibited from forwarding, printing, copying or using it in anyway, in whole or part. Please
note that some council staff utilise Blackberry devices, which results in information being transmitted overseas prior to delivery of any communication to the
                                                                                2

Page 7

                                                                                                               Queensland
  Smart eDA                                                                                                    Government

   Smart eDA iD 1306298176238



   Application Summary


   Details

   Created:                          May 25, 2011

   Applicant:

   Type of application:




   Locations

  5SPI95871
  10 SERENITY CL, NOOSA HEADS 4567
  SUNSHINE COAST REGIONAL
  Total 1 location / 1.456 hectares




  Interested parties

 Party / Role                                                     Lodged / Referred at                 Reference #
 Tate Professional Engineers
  Applicant
                                         Your proposal does not contain any Assessing Authorities




  IDAS forms

  Name                                                                                              Status     Last Modified

  IDAS Form 1 - Application Details                                                                 Updated 25/05/2011


  IDAS Form 6 - Building or operational work assessable against a planning scheme                   Updated 25/05/2011

  IDAS Checklist 1- Development assessment checklist                                                Updated 25/05/2011

  IDAS Checklist 4 - Operational Works                                                              Updated 25/05/2011




  Other information

  Description/From                                                                                            Date

  State Assessments                                                                                               25 May 2011
                                                                                                                       13:09:19




Smart eDA (http://www.smarteda.gld.gov.au)                     Page 1 of 1                                   May 26. 2011, 11:16 AM

Page 8

                                                         Smart eDA - elecumir 1DAS




                             Integrated Development Assessment System form


Application Details - IDAS form 1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)



You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
•     complete this form (Application details - IDAS form 1)

•     complete any other forms relevant to your application

•     provide any mandatory supporting information identified on the forms as being required to accompany your
      application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.


Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)


Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.


Name/s (individual or company name in full)                   TATE PROFESSIONAL ENGINEERS PTY LTD


For companies, contact name                                   STEVEN HARRISON

                                                              PO Box 1092
Postal address
                                                              Mooloolaba Qld 4557

Contact phone number                                          5457 5300

Mobile number (non-mandatory)

Fax number (non-mandatory)

e-mail address (non-mandatory)                                [email protected]



1. What is the nature of development proposed? (tick all applicable boxes)


q    material change of use of premises

q    building work

® operational work
q    reconfiguring a lot

Page 9

2. What type of approval is being sought?


® development permit
q    preliminary approval
q both - provide details below


3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?


® No

q    Yes - complete table A and then go to question 5




4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)

Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

                                                                               Lot on plan
                 Street Address
                                                                               description
                                                                                                     Local government area
                 Unit Street       Street name and official         Post              Plan type        (e.g. Logan,Cairns)
                                                                           Lot No
                                                                               No.
                  No.    No.        suburb/locality name            code             and plan no.

                               SERENITY CL NOOSA                                                    SUNSHINE COAST
                        10                                      4567       5         SP195871
                               HEADS                                                                REGIONAL

    Street address / lot on plan
  Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
q water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)

                 Coordinates (note: place each set of
                 coordinates in a separate row)                         Zone                               Local government
                                                                                         Datum
                                                                      reference                            area (If applicable)
                   Easting     Northing    Latitude     Longitude
                                          -26.39326     153.08395                    ® GDA94             SUNSHINE COAST
                                          7             7                                                REGIONAL
                                                                                     q WGS84
             1
                                                                                     q other




5. Total area of the premises on which the development is proposed (indicate hectares or m2)
14,560 m2
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)


         1       VACANT LAND



7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)


PROPOSED 36 RESIDENTIAL UNITS




                                                                                                  Application Details - IDAS form 1
                                                                                                    Version 1.0 18 December 2009

Page 10

8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)


® No

q   Yes - complete either table D, table E or table F as applicable



Table D (note: do not complete this table if lodging the application on-line using Smart eDA)


Name of owner/s of the land


I/We, the above-mentioned owner/s of the land, consent to the making of this application.


Signature of owner/s of the land


Date

Table E


Name of owner/s of the land


q The owner's written consent is attached or will be provided separately to the assessment manager


Table F


Name of owner/s of the land

       By making this application, I, the applicant, declare that the owner has given written consent to the making of
       the application.

9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)


® No                              q Yes - complete table G



10. Identify if any of the following apply to the premises (tick applicable box/es)


q        adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H

q        on strategic port land under the Transport Infrastructure Act 1994 - complete table I

q        in a tidal water area - complete table J


11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
    water, etc.)

    No    q Yes - ensure the type, location and dimension of each easement is included in the plans submitted




                                                                                            Application Details - IDAS form 1
                                                                                              Version 1 0 18 December 2009

Page 11

12. Does the proposal include new building work or operational work on the premises? (including any
    services)

q No ® Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted

13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
    end of this form for more information)


® No - Go to question 15                  q Yes


15. Has the local government agreed to apply a superseded planning scheme to this application under
    section 96 of the Sustainable Planning Act 2009?


® No

q    Yes - provide details below



16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)

                                                                                               Method of lodgement to
                              Description of attachment or title of attachment
                                                                                                assessment manager

            1



17. Applicant's declaration


® By making this application, I declare that all information in this application is true and correct (note: it is
    unlawful to provide false or misleading information).




                                                                                           Application Details - IDAS form 1
                                                                                             Version 1.0 18 December 2009

Page 12

Notes for completing this form

Question 8:
•     Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
      for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
      required under section 263, then an application must contain, or be accompanied by, the written consent of the
      owner, or include a declaration by the applicant that the owner has given written consent to the making of the
      application.
•     Owner's consent is not required for a mobile and temporary ERA.

Question 9:
•  Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
   regulation may require the application to be supported by certain evidence prescribed under the regulation.
   Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
   required to be given, and the evidence required, to support the application.

Question 13:
•     The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
      long service leave levy is payable.
•     The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
      are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:
•  The portable long service leave levy need not be paid when the application is made, but the Building and
   Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
   permit is issued.
•  Building and Construction Industry Notification and Payment Forms are available from any Queensland post
   office or agency, on request from QLeave, or can be completed on the QLeave website at
   www.qleave.qld.gov. au. For further information contact QLeave on 1800 803 481 or www.gleave.gld.gov.au.

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.


OFFICE USE ONLY
   I

Da4 received                                    Reference numbers
   I

NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER


                                                        Council. I have been engaged as the private certifier for the
To:
                                                        building work referred to in this application.


Date of                                                                     BSA Certification       Building
                       Name
engagement                                                                  license number          classification/s




                                                                                           Application Details - IDAS form 1
                                                                                             Version 1.0 18 December 2009

Page 13

qqq
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)


                                                                              Date receipted
                                      QLeave Project   Amount                 form sighted by Name of officer who
              Description of the work                             Date paid
                                      Number           paid ($)               assessment      sighted the form
                                                                              manager




The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.




                                                                                     Application Details - IDAS form I
                                                                                       Version 1.0 18 December 2009

Page 14

                                                           Smart eDA - etertroMe mA5




Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
•      complete Applicant details - IDAS form I

•      complete any other forms relevant to your application
•      provide any mandatory supporting information identified on the forms as being required to accompany your
       application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

This form can also be used for development on strategic port land under the Transport Infrastructure Act 1994.


1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)


q building work - complete table A                    ® operational work - complete table B

Table B


          What is the nature of the operational work made assessable in the planning scheme? (tick applicable boxes)


              road works                      stormwater                    water infrastructure

              drainage Works              q earthworks                      sewerage infrastructure

          q landscaping                   q signage                      q clearing vegetation under the planning scheme

          q other - please specify below


          What type of approval is being sought? (if you have indicated multiple works in the above question, please
          use an attachment to this form to detail each approval request)


          ® development permit                 q preliminary approval               q both - specify below


          Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)


          ® No           q Yes - specify the number of lots being created


          Are there any current approvals associated with this application? (e.g. material change of use)


          q No           ® Yes - provide details below


                    List of approval reference/s                            Date approved             Date approval lapses




    Department of Infrastructure and Planning                             QPlan                               Queensland
                                                                                                         ^    Government

Page 15

  Ju l
               2008/0951, 2005/0699                           01-Jan-2008                 01-Jan-2010


2. What is the dollar value of the proposed building work? (inc GST, materials and labour) $ 75000.00




                                        Building and operational work assessable against a planning scheme - IDAS form 6
                                                                                            Version 1.0 18 December 2009

Page 16

ooq
3. Confirm the following mandatory supporting information accompanies this application
                                                                                 Confirmation
                                                                                                  Method of lodgement
                                                                                 of lodgement
All applications for operational works

site plans drawn to scale which show the following:
•   the location and site area of the land to which the application relates
    (relevant land)
•   the north point
•   the boundaries of the relevant land
•   the allotment layout showing existing lots, any proposed lots (including
    the dimensions of those lots), existing or proposed road reserves,           ® confirmed      mail
    building envelopes and existing or proposed open space (note:
    numbering is required for all lots)
•   any existing or proposed easements on the relevant land and their
  function
• any access limitation strips
•   all existing and proposed roads and access points on the relevant land

a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents                   q confirmed
relevant to the application

Applications for operational works involving earthworks (filling and excavating)


drawings showing:
• existing and proposed contours
•   areas to be cut and filled
•   the location and level of any permanent survey marks or reference
    stations used as datum for the works                                         q confirmed
•   the location of any proposed retaining walls on the relevant land and
    their height
•   the defined flood level (if applicable)
•   the defined fill level (if applicable)
Applications for operational works involving roadworks

drawings showing:
•   existing and proposed contours
•   the centreline or construction line showing chainages, bearings, offsets
    if the construction line is not the centreline of the road and all
    intersection points
• information for each curve including tangent point chainages and
    offsets, curve radii, arc length, tangent length, superelevation (if
    applicable) and curve widening (if applicable)
•   kerb lines including kerb radii (where not parallel to centreline) and
    tangent point changes (where not parallel to centreline)
•   edge of pavement where kerb is not constructed                                  confirmed      mail
•   position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other
    street furniture
•   pavement markings including details on raised pavement markers
•   catchpit, manhole and pipeline locations
•   drainage details (if applicable)
•   cross road drainage culverts (if applicable)
•   concrete footpaths and cycle paths
•   location and details for access points, ramps and invert crossings
•   changes in surfacing material

                                              Building and operational work assessable against a planning scheme - IDAS form 6
                                                                                                  Version 1.0 18 December 2009

Page 17

    JLJ "
                                                                                 Confirmation
                                                                                                  Method of lodgement
                                                                                 of lodgement
Applications for operational works involving stormwater drainage

drawings showing:
• existing and proposed contours
•   drainage locations, diameters and class of pipe, open drains and
    easements                                                                    0 confirmed       mail
•   manhole location, chainage and offset or co-ordinates and inlet and
    outlet invert levels
•   inlet pit locations, chainage and offset or co-ordinates and invert and
    kerb levels
Applications for operational works involving water reticulation


drawings showing:
•   kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
    reticulation works
• pipe diameter, type of pipe and pipe alignment
• water main alignments                                                              confirmed     M01'
•   water supply pump station details (if applicable)
•   minor reservoir details (if applicable)
•   conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation


drawings showing:
• location of all existing and proposed services
•   location of all existing and proposed sewer lines and manhole locations
•   location of all house connection branches
•   kerb lines or edge of pavement where kerb is not constructed
•   chainages
                                                                            q3 confirmed           mail
•   design sewer invert levels
•   design top of manhole levels
•   type of manhole and manhole cover
•   pipe diameter, type of pipe and pipe alignment
•   location of house connections (if applicable)
•   sewer pump station details (if applicable)

Applications for operational works involving street lighting

drawings showing:
• location of all light poles and service conduits
• location of all other cross road conduits
•   type of wattage and lighting
                                                                                    confirmed
•   any traffic calming devices
•   additional plans for roundabouts and major roads (if applicable)
•   details of any variations to normal alignment
•   details of lighting levels




                                              Building and operational work assessable against a planning scheme - IDAS form 6
                                                                                                  Version 1.0 18 December 2009

Page 18

qqq
                                                                               Confirmation
                                                                                                 Method of lodgement
                                                                               of lodgement
Applications for operational works involving public utility services

drawings showing:
•   any existing light poles and power poles
•   any existing underground services                                           q confirmed
•   details of proposed services
•   alternation to existing services

Applications for operational works involving landscaping works

drawings showing:
•   the location of proposed plant species
•   a plant schedule indicating common and botanical names, pot sizes
    and numbers of plants
•   planting bed preparation details including topsoil depth, subgrade
    preparation, mulch type and depth, type of turf, pebble, paving and            confirmed
    garden edge
•   the location and type of any existing trees to be retained
•   construction details of planter boxes, retaining walls and fences
•   the proposed maintenance period
•   irrigation system details


Notes for completing this form:
•   This form can also be used for development applications for building works or operational works assessable
    against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
    mentioned, take it to mean the land use plan for the airport land.


Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.


                                        r_,
OF ICE USE ONLY                             rt
                          tai 6        :`j . ::1



Date Received         2 7 MAY 201         Reference Numbers



The Sustainable PlAh`ACt 2009-is administered by the Department of Infrastructure and Planning. This form and
all other required     on materials should be sent to your assessment manager and any referral agencies.




                                             Building and operational work assessable against a planning scheme - IDAS form 6
                                                                                                 Version 1.0 18 December 2009

Page 19

    I                             Integrated Development Assessment System Checklist


Development assessment checklist - IDAS
checklist 1
(Sustainable Planning Act 2009, version 1.0 18 December 2009)


This checklist applies to the carrying out of development generally.

You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:

•   whether you need to make a development application for the proposed development

•   if a development application is required, the relevant IDAS forms you need to complete as part of your application

•   whether you need to give a copy of your application to any referral agencies.

If your development involves a material change of use, reconfiguring a lot or operational works, it is recommended
that you complete Material change of use - IDAS checklist 2, Reconfiguring a lot - IDAS checklist 3 or Operational
works - IDAS checklist 4, as applicable.

If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning's website at www.dip.qld.gov.au.

All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.


Part 1 - General questions


1.1 Have you received a referral agency response in relation to this proposed development prior to making
an application?


ZNo
            •        To assist you in preparing your application, completing Referral agency responses - IDAS checklist
q Yes
                     6 is recommended


1.2 Do you wish the proposed development to be assessed against a superseded planning scheme?


® No

                     You must complete Request to apply a superseded planning scheme - Sustainable Planning Act
q Yes                form 2 and give this notice to the relevant local government. If the local government agrees to
                     your request, details must be provided in Application details - IDAS form I



1.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation
notice is required under the Water Act 2000?


    No

    Yes               It is recommended that you complete part 2 of this checklist


1.4 Is any part of the proposed development intended to be carried out on a Queensland heritage place under
the Queensland Heritage Act 1992?


® No

q Yes                 It is recommended that you complete part 3 of this checklist




    Department of Infrastructure and Planning                   QPIan                            'Queensland
                                                                                               y , Government

Page 20

1.5 Does the proposal involve development on a local heritage place?


® No

q Yes    I•       It is recommended that you complete part 4 of this checklist


1.6 Does the proposal involve an environmentally relevant activity, other than an agricultural ERA, a mining
activity or a chapter 5A activity?


® No

q Yes             It is recommended that you complete part 5 of this checklist


1.7 Is any part of the development on strategic port land or airport land (other than development for a
material change of use that is inconsistent with the land use plan for the strategic port land or airport land)

ZNo

q Yes             It is recommended that you complete part 6 of this checklist


1.8 Is any part of the development on land below a high water mark within the limits of a port under the
Transport Infrastructure Act 1994?

   N

q Yes             It is recommended that you complete part 7 of this checklist


1.9 Is any part of the premises designated for community infrastructure?


® No

q Yes             It is recommended that you complete part 8 of this checklist


1.10 Does the proposal involve the establishment or expansion of a waste water disposal system?


  No

q Yes             It is recommended that you complete part 9 of this checklist


1.11 Is the development on land that adjoins a declared fish habitat area under the Fisheries Act 1994?


®No

q Yes             It is recommended that you complete part 10 of this checklist


Privacy - please refer to your assessment manager for further details on the use of information recorded in
this checklist.

Disclaimer:
  While the Department of Infrastructure and Planning (DIP) believes that this information contained on this
  checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will
  not rely on the information without first making your own enquiries regarding the interpretation and application of
  the applicable legislation to your circumstances.

  To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
  negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
  other consequence which may arise from your reliance on this process and the information contained on this
  checklist.




                                                            Development application assessment checklist - IDAS checklist 1
                                                                                            Version 10 18 December 2009

Page 21

OFFICE USE ONLY          Lcui-iter

Date received     MAY                   R' Terence numbers

The Sustainable Planning Act 2Q09 is administered by the Department of Infrastructure and Planning.




                                                         Development application assessment checklist - IDAS checklist I
                                                                                         Version 1, 0 18 December 2009

Page 22

                                                        Smart eDA - electronic IDAS



                                  Integrated Development Assessment System checklist


Operational Works - IDAS Checklist 4
(Sustainable Planning Act 2009, version 1.0, 18 December 2009)


This checklist only applies when the development application seeks approval for operational works.

You should complete all questions unless the checklist indicates otherwise.

All planning and development applications require applicants to complete the following:

•      Applicant details --IDAS form 1

•      any forms or mandatory supporting information identified as forming part of your application.
If you are unsure of any answers to questions, phone or visit your local government, or go to the Department of
Infrastructure and Planning's website, www..dip..gld.gov.au.
The checklist and relevant sections do not need to be completed for applications relating only to building work
requiring assessment against the Building Act 1975.


Part I - General questions

1.1         Is the proposed operational work assessable under the planning scheme?


      No

                        You must complete Building and operational work assessable against a planning scheme - IDAS
® Yes                   form 6
                        Continue on to question 1.3

1.3         Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
            state-controlled road?


® No                    It is recommended that you complete part 2 (starting from question 2.1) of this checklist.

R Yes                   It is recommended that you complete part 2 (starting from question 2.2) of this checklist.


1.4         Does State Planning Policy 2/02: Planning and Managing Development Involving Acid Sulfate Soils
            apply to the development?


® No

      Yes               It is recommended that you complete part 3 of this checklist.


1.5         Is there any proposed operational work for filling or excavation?


X No                    It is recommended that you complete part 4 (starting from question 4.5) of this checklist.

      Yes                It is recommended that you complete part 4 (starting from question 4.1) of this checklist.




                                                                        QPlan                             Queensland

Page 23

      nn
1.6        Is any of the proposed operational work listed in schedule 12 of the Sustainable Planning Regulation
           2009 and does it exceed the specified threshold?


® No
                      This application requires assessment by the Department of Transport and Main Roads as a
q Yes                 concurrence agency

Section reference:
•          Sustainable Planning Regulation 2009, schedule 7, table 3, item 14

1.7        Is any of the proposed operational work listed in schedule 13 of the Sustainable Planning Regulation
           2009 and does it exceed the specified threshold?


® No
                      This application requires assessment by the Department of Transport and Main Roads as a
q Yes                 concurrence agency

Section reference:
•          Sustainable Planning Regulation 2009, schedule 7, table 3, item 15


1.8        Is any part of the premises in an interim koala habitat protection area identified under the South East
           Queensland Koala state planning regulatory provisions (SEQ Koala SPRP)?


® No

q Yes                  It is recommended that you complete part 5 of this checklist.


1.9        Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is
           also assessable?


® No

q Yes                  It is recommended that you complete part 6 of this checklist.

1.10       Does the Vegetation Management Act 1999 apply to any of the proposed operational work for the
           clearing of native vegetation?


® No

q Yes                  It is recommended that you complete part 7 of this checklist.


1.11       Is any of the proposed operational work for any thing constructed or installed that allows, under the
           Water Act 2000, for taking or interfering with water from a watercourse, lake or spring (other than
           using a water truck to pump water; and other than under the Water Act 2000, section 20(2), (3) or (5),
           or from a dam constructed on a watercourse or lake?


® No
q Yes
      No               It is recommended that you complete part 8 (starting from question 8.8) of this checklist.

                       It is recommended that you complete part 8 (starting from question 8.1) of this checklist.


1.12       Is any of the proposed operational work tidal work, other than excluded work defined under the
           Sustainable Planning Regulation 2009?

® No

F-1 Yes        •       It is recommended that you complete part 9 of this checklist.




                                                                                         Operational works - IDAS checklist 4
                                                                                                 Version 1 0 December 2009

Page 24

1.13    Is any of the operational work proposed to be carried out within a coastal management district?


® No

q Yes       •        It is recommended that you complete part 10 of this checklist.


1.14    Is any of the proposed operational work for constructing or raising waterway barrier works under the
        Fisheries Act 1994?


® No

q Yes       •        It is recommended that you complete part 11 of this checklist.

1.15    Is any of the proposed operational work to be carried out completely or partly within a declared fish
        habitat area under the Fisheries Act 1994?


® No

q Yes                It is recommended that you complete part 12 of this checklist.


1.16    Is any of the proposed operational work removing, destroying or damaging marine plants under the
        Fisheries Act 1994?

® No
q Yes       •        It is recommended that you complete part 13 of this checklist.


1.17    Is any of the operational work proposed to be carried out in a wild river area declared under the Wild
        Rivers Act 2005?

® No

q Yes       •        It is recommended that you complete part 14 of this checklist.


1.18    Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
        state-controlled road?

® No

q Yes       •        It is recommended that you complete part 15 of this checklist.

2.1     Is the proposed operational work for filling or excavating listed in the Sustainable Planning
        Regulation 2009 schedule 11 and does it exceed the threshold or combined threshold?


® No        •        End of part 2 of this checklist.
            •        This application requires assessment by the Department of Transport and Main Roads as a
q Yes
                     concurrence agency.

        End of part 2 of this checklist.


Section reference:
•       Sustainable Planning Regulation 2009, schedule 7, table 3, items 1(b) and 2


4.1     Is the filling or excavation associated with reconfiguring a lot?


® No

q Yes       •        Go to question 4.5




                                                                                      Operational works - IDAS checklist 4
                                                                                              Version 1.0 December 2009

Page 25

4.2          Is any part of the premises subject to an easement in favour of a distribution entity or transmission
             entity under the Electricity Act 1994?


® No                     Go to question 4.4
q Yes

14.3         Is any of the proposed operational work to be located wholly or partly in the easement?


® No

q Yes



             If yes this application requires assessment by the entity responsible for the easement as an advice agency.



4.4          Is any of the operational work to be located wholly or partly within 10 metres of a substation site
             under the Electricity Act 1994?


® No
                         This application requires assessment by the the entity responsible for the substation as an
q Yes
                         advice agency.


4.5          Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number
             1 issued under the Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane
             strategic pipeline?


® No
q Yes
       No        •       End of part 4 of this checklist.

                         This application requries assessment by the pipeline licence holder as an advice agency.


8.8          Is any of the proposed operational work for any thing constructed or installed that allows, under the
             Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump
             water)?


       No

                 •       You must complete Taking artesian or sub-artesian water -IDAS form 12.
q Yes            •       This application requires assessment by the Department of Environment and Resource
                         Management as a concurrence agency.


8.9          Is any of the proposed operational work for any thing constructed or installed that allows, under the
             Water Act 2000, for taking overland flow water (other than using a water truck to pump water)?


® No             •       Go to question 8.12.

       Yes


8.12         Is any of the proposed operational work for any thing constructed or installed that allows, under the
             Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to
             pump water)?


® No                     Go to question 8.14
q Yes




                                                                                          Operational works - IDAS checklist 4
                                                                                                  Version 1.0 December 2009

Page 26

    Inn
8.14     Does any of the proposed operational work for any thing constructed or installed that allows, under
         the Water Act 2000, for interfering with overland flow water (other than using a water truck to pump
         water)?


® No                 Go to question 8.19

LI Yes


8.19     Is the proposed operational work for the following?


for the construction of a referable dam as defined under the Water Supply (Safety         q Yes               No
and Reliability) Act 2008
to increase the storage capacity of a referable dam by more than 10 per cent              q Yes               No



         If yes to any of the above you must complete Referable dam - IDAS form 16.
•        This application requires assessment by the Department of Environment and Resource Management
         (DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
         concurrence agency and you must give DERM a copy of the application



Notes for completing this form:
•      Applicant details - IDAS form 1 and Development application assessment - IDAS checklist 1 must be
         completed for all development applications to be considered.
•        The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.

Privacy - please refer to the assessment manager for further details on the use of information recorded in
this form.

Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that the information contained on this form and
provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation and application of the applicable
legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this form.




                                                                                        Operational works - IDAS checklist 4
                                                                                                Version 1.0 December 2009

Used in these records

About this file

File size
4.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 1 of 3 - Covering Letter - Quote Email - IDAS Forms 1 & 6 Checklist 1 & 4.pdf · 4.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.