4.2          Is any part of the premises subject to an easement in favour of a distribution entity or transmission
             entity under the Electricity Act 1994?


® No                     Go to question 4.4
q Yes

14.3         Is any of the proposed operational work to be located wholly or partly in the easement?


® No

q Yes



             If yes this application requires assessment by the entity responsible for the easement as an advice agency.



4.4          Is any of the operational work to be located wholly or partly within 10 metres of a substation site
             under the Electricity Act 1994?


® No
                         This application requires assessment by the the entity responsible for the substation as an
q Yes
                         advice agency.


4.5          Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number
             1 issued under the Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane
             strategic pipeline?


® No
q Yes
       No        •       End of part 4 of this checklist.

                         This application requries assessment by the pipeline licence holder as an advice agency.


8.8          Is any of the proposed operational work for any thing constructed or installed that allows, under the
             Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump
             water)?


       No

                 •       You must complete Taking artesian or sub-artesian water -IDAS form 12.
q Yes            •       This application requires assessment by the Department of Environment and Resource
                         Management as a concurrence agency.


8.9          Is any of the proposed operational work for any thing constructed or installed that allows, under the
             Water Act 2000, for taking overland flow water (other than using a water truck to pump water)?


® No             •       Go to question 8.12.

       Yes


8.12         Is any of the proposed operational work for any thing constructed or installed that allows, under the
             Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to
             pump water)?


® No                     Go to question 8.14
q Yes




                                                                                          Operational works - IDAS checklist 4
                                                                                                  Version 1.0 December 2009

Used in these records

About this file

File size
4.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 1 of 3 - Covering Letter - Quote Email - IDAS Forms 1 & 6 Checklist 1 & 4.pdf · 4.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.