NOOS DEVELOPMENT FEES & CONTRIBUTIONS
(Cashier: Pleasg@ietum to Admin Officer, Development) @
On

APPLICATION AND GENERAL FEES “RECEIPT TYPE | BONDS - B
Application Fees 540 Payee Name:
Road / Drainage Plan Exam 541 Address:
Road / Drainage Field Inspection Le) 542
Legal Document Examination ee ee
Sealing Fee - Survey Plans, Legal Documents
Sale of Documents, Policy Lists, Misc +} —J

Bonding Admin Fee (Contributions, uncompleted works)
Closed Circuit TV Inspection

     
 
 
 
 

 
   

 

Refund Detalis

 

 

CALCULATIONS
Lot Caiculation

        

 

Pre-lodgement Meeting Fee

CONTRIBUTIONS . : __ AMOUNT _ | RECEIPT TYPE.| Plan Examination Calculation

  
   
 

 

 

 
 
         
     
     
 
    

 

[Developer Contibuton—Landscaping | |S 8

Developer Contribution — Road Other thanPSP

Seip Gena onrbnr@# J

| Developer Contibuton ~Patway OheranPSP_— | |B Cd Inspection Gafculation

[ Developer Contibution = Other Parks and Community || 580 ROADWORKS CONTRIBUTIONS
=e PC ae eer
ICS~ Sewerage South Peregian (PSP Maroodhy) [TB | APPLICATION DETAILS od
recmweenee |  Trayeoname AT
ta eons dteseag [| ar | coe Bee, oN oS

ICS - Drainage (PSP Noosavitle Master & Ward Street) | TT CSUNHes
[ICS—Road(CMRNIGP)INBAnotenteredthenusesa4 [TSC ro Cox (S82

es-Patway PSP) CS C~‘idSC‘“‘ SC” Owe WO kee,

 
   

Development Location:

IS Gaast ST
§ (330 NOOSA AEKAO
a .

CPI Date: oe _ AMOUNT RECEIPT TYPE File Numbers or Reference:
[ Seay DenestePeomerceManioancsticonpeiedWaisbond [i (Cat le. 2061. 2024
Date application properly made:
Total of Foes Paid {Including Bonds |Date application properlymade:
(nctuding Bonds) ReceiptNo: (Uf) 119 | Receipt Date: G/ia/o7__|

Total of Fees Paid (Excluding Bonds)

   
   

    

 

P-Land DevelopmentFEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc

 
Full text of the other 46 pages

Page 2

26 September 2007 ]B Bp CR mW me D

27 SFP 2007
By Noosa Building Certifiers

Noosa Building Certifiers
Lyndal Harris

PO Box 1382

Noosaville DC Qld 4566

Our Reference 07-3646

RE: | OPW WORKS APPLICATIONS FOR 15 GRANT STREET, NOOSA HEADS -
LOT 12 ON SP 179879 FOR MR. COLVIN TODD AND MR. PAUL LANSKEY

   
  

Dear Lyndal,

Thank you for your advice in relation to the above application. | now wish to
submit the following documentation for your review prior to submission to
Noosa Council for approval: -

Part A;

Part E;

IDAS Assessment Checklist
Noosa Council application fees

P.O. Box 217 Chirn Park Qid 4215

Fax: 07 5591 2188
!Jemail; [email protected]

     

Tg Musgrave Avenue, Southport *y

5 sets of the architectural Site Plan prepared by Burleigh Design;

cco eo lol lo

5 sets of the hydraulic engineering documentation prepared by
Sweet Design Innovations; and

Q A copy of the MCU Decision Notice.

 

If you require any further information or need to discuss this matter please do
not hesitate to contact our office.

Regards,

Lisa McKay

 

Page 3

 
 
 

Part A

Common details

Part A, Version 3.0, 3 September 2007

idas

 

27 SFP 2007
By Noosa Building Certifiers

 

‘Identification of the premises the subject of the application

1, Can any part of the premises be identified by a street address or lot on plan description?

[LJ No - Answer Q1(a)

[e] Yes - Complete Table B and answer Q1(b) and Q1(c)

 

 

 

 

Table B
a ~— ae i “*"" Lot on plan description
© at oie] stan | Oegatan | Pat | senses eset | gemma oe
number fe.g. RP, SP) number
15 Grant Street Noosa Heads 4567 12 sp 179879 Noosa Council

 

 

 

 

 

 

 

 

 

 

 

1(b). Can the address be further described by shop/tenancy number or storey/level?

[e] No

[]_ Yes - Complete Table C

1(c). Is any part of the premises strategic port land under the Transport Infrastructure Act 1994?

[e] No

LL] Yes - Complete Table D

2. Can the premises best be identified by coordinates (e.g. for development proposed in waters, or on a site within a large rural lot)?

[e] No

[1] Yes - Complete Table E

3. Are the premises within or adjacent to a water body or watercourse?

[2] No

LJ Yes - Complete Table F and answer Q3(a}

4,  Whatis the total area of land that makes up the premises (ie. the area covered by the application)?

 

~~ Area of land above high. water mark/outside watercourse

Area in a water body or watercourse

 

672.00 [e]m

 

 

(J hectares

(Tick applicable unit)

 

0.00

Ci

 

(hectares

(Tick applicable unit)

 

 

 

Existing use of the premises
5. Are the premises currently used for any purpose?

[eo] No

oO Yes - Ensure details of any existing use of the premises are provided in plans and documentation submitted with this application. e.g. location
and nature of existing uses, buildings, structures and services

 

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

6. Are there any existing easements on the premises (e.g. for vehicular access, electricity, overtand flow)?

[e] No

[[] Yes - Complete Table H and ensure the location and dimensions of each easement are included in plans, submitted with the application

 

[Proposal details }
7. Are new uses proposed on the premises?

[e] No

[J] Yes - Provide details in Table !

8. Are new buildings or structures proposed to be erected on the premises?

 

LJ No
[e] Yes - Ensure the nature, ocation and dimensions of the proposed new buildings, structures or services are included in plans, submitted with the
application
‘Applicant details J

 

9. Who is the applicant for the application?

 

 

Company/organisation name

, ; Burleigh Design
(if applicable)

 

 

Individual/ contact person details

Title Mr "Firstname — [Phillip ‘JLastname [Buchanan

Postal address [PO Box 217, Chirn Park Qld 4215

 

 

 

 

 

---- — sens : 4

 

 

 

Contact telephone number [5591-2155

 

 

 

 

 

 

 

 

 

 

Mobile phone number f ; |
Facsimile number [5591-2188
e-mail address [[email protected]

‘Owner's consent and resource entitlement |

 

10. Does the application involve a State-owned resource prescribed by schedule 10 of the integrated Planning Regulation 1998 (IP Reg) or
@ any other regulation?

[e] No

(J Yes - Complete a new Table J for each State-owned resource and submit, with the application evidence of resource allocation or entitlement
11. Does the application involve land other than State-owned land (i. privately owned land) and require owner's consent?

[No

[Aes Complete Table K and submit, with the application, writlen documentation of all owner's consent

 

 

Table K
Owner name/s Street address or lot on plan description Date written consent”
. was obtained
1 Colvin Todd 15 Grant St, Noosa Heads 06-09-07

 

2 Paul Lanskey 15 Grant St, Noosa Heads 06-09-07

 

 

 

 

 

 

 

 

Page 5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
\Mandatory attachments and supporting information j
12. Whatare the other parts of IDAS Application Form 1 submitted with this application, and the other mandatory attachments and
supporting information accompanying this application, not identified in those other form paris?
~"Description of attachment or information Title (if applicable) eT Sali
(e.g. Part C of Form 1, owner's consent, evidence af | (e.g. General Authority,James Street Traffic Date Method of ee very to
resource allocation/entitlement, plans, drawings, reports) Report) assessment manager
1 Part E 25-Sep-2007 | mail
2 IDAS Assessment Checklist 25-Sep-2007 | mail
3 Architectural plans prepared by Burleigh Dey Proposed Duplex for Colvin Todd | 13-Sep-2007 | mail
4 Hydraulic plans prepared by Sweet Designgy 25-Sep-2007 | mail
[Portable Long Service Leave (PLSL) levy for building and construction work |

 

13, 1s payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit for

the applicati
[e] No
[_} Yes

13(a).

ion can be given?

Indicate the reason PLSL is not applicable

[1 The application is not for building and construction work under the Building and Construction Industry (Portable Long
Service Leave) Act 1991, section 3AA (e.g. the application is only for a change of use or for the following types of work carried
out solely for farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching
vegetation, clearing of regrowth, thinning vegetation or controlling weeds or pests); OF

(1 Allcosts, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or

O

The work is being carried out under an owner-builder permit issued under the Queensiand Building Services Authority
Act 1991- Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number
stated). The receipted form must be sighted by the assessment manager before a development permit can be given

 

OFFICE USE ON!

LY

 

Date Received

 

| Reference Numbers

 

 

 

 

 

FOR COMPLETION BY ASSESSMENT MANAGER

 

 

@ Is a QLeave Notification and Payment Form required for this application?

([) No

LL] Yes - Complete Table M

 

 

NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER

 

 

 

To

 

 

 

Council

| have been engaged as the private certifier for the building work referred to in this application

 

Date of
engagement

Accreditation number

Name

BSA Certification number

Building classification

 

 

 

 

 

 

 

 

 

Page 6

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

Advice for completing Part A

 

\°

General advice

Under IPA, section 3.2.1(7) mandatory requirements must be correctly completed for a development application to be a ‘properly made application’.
The assessment manger may refuse to receive an application that is not properly made.

Completion of Part A of Form 1 is required for all development applications. Other mandatory requirements, applicable to certain types of applications,
are stated in other Parts of Form 1.

The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building

Act 1975 only.

For further information about completing this form go to IDAS Guide 1 (Making and IDAS application)

 

Qi

The premises, the subject of the application, may be identified in a number of ways. Street address and lot on plan are most common.
Lot on plan details can be obtained from title documents or through the local goverment.

The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or
other structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.

A description of the land is not required if the application relates to a mobile and temporary Environmentally Relevant Activity (ERA)
only. Instead complete Q1{a).

StrategicPortLand is within a local government area but a local government's planning scheme does not apply on Strategic Port Land.
StrategicPortLandis declared under the Transport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development
on strategic port {and) and the Queensland Transport (Ports) website.

 

Q2

Coordinates often provide the best means of accurately identifying the location of development proposed in waters, or on a relatively
small development site distant from property boundaries. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application.

Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum may be provided.

 

Q3

A single development application may involve land both within and outside waters.

A ‘watercourse’ is defined by the Water Act 2000, schedule 4 and generally means a river, creek or stream upstream of the point to
which high spring tide ordinarily flows and reflows (unless a regulation has declared a limit for the watercourse). Generally, a
watercourse is in the jurisdiction of the Department of Natural Resources and Water.

“Tidal water is defined in the Coastal Protection Act 1995 (Schedule) and ‘tidal area’ for a local goverment and for strategic port land
is defined in the IPA (schedule 10). Generally, the area below “high-water mark’ (defined by the Coastal Protection Act in relation to
high water mark at spring tides) establishes the boundary of a tidal area.

Land below high water mark is not within a local govemment's area unless provided for under the Local Government Act 1993.

Unless otherwise provided for by legislation, a local government has no jurisdiction below high water mark. A tidal area for strategic
port land is within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for
a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and deciding applications for
prescribed tidal works within the tidal area for a local goverment, and the planning scheme may be applied to that assessment (to the
extent provided for in the code for prescribed tidal work).

 

ag

The applicant need net be the owner of the land. However, the applicant is responsible for ensuring the information provided on the
Form ( Application Form (including this Part and any other relevant Part) is correct.

If the applicant is a company or organisation, a contact person must be nominated.

Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment
Manager, during the processes of the application or in the event of an appeal about the outcome of the application.

 

Q10

 

Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications involving a prescribed State resource.
Schedule 10 of the Integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-owned land, where
evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning Requlation
Section 3.2.1(10)(a}{ii) states an application cannot be taken to be properly made without the required evidence..

Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental
Protection Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the
State-owned land above high water mark.

In the case of applications involving the taking or interfering with water under the Water Act, the development application may be
made at the same time as the request for resource entitlement.

In the case of State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or
encroachment (identified by gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to
the Department of Main Roads.

 

 

 

Page 7

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

 

Q11 ° Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if
the application involves any of the following:
(i) a material change of use;
(ii) reconfiguration of a lot;
(iii) work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management
Act 1995, or
(iv) work on rail corridor land defined under the Transport infrastructure Act 1994.
. “Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the
application, entitled to receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).
. Owner's consent is not required for a mobile and temporary ERA.

 

 

Qi2 Only information not identified in other Parts of Form 1 needs to be listed in this section of Part A.

 

Q13 . The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in
the building and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service
leave. To fund the scheme, a levy is collected on all building and construction work carried out in Queensland where the total cost of
the work, whether direct or indirect, is $80,000 or more inclusive of GST. This amount and other prescribed percentages and rates for
calculating the levy are stated in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Included in
the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction IndustryTrainingLevy.

The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction
industry for the purposes of the levy and includes, for example, renovating, relocating, constructing, altering, demolishing, maintaining
of repairing buildings, pools, roads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.

The PLSL Act requires the portable long service leave levy (PLSL levy) be paid before the assessment manager may give a

development permit for certain building or operational work. The assessment manager must sight an approved form issued by

QLeave advising of the status of the payment of the levy.

Building and Construction Industry Notification and Payment Forms are available from anyQueensiandpost office or agency, on

request from QLeave, or can be completed on the QLeave website at www.qleave.qid.gov.au

« For further information contact QLeave (Tel: 1800 803 481 Web: www.qleave.qid.gov.au )

 

 

 

Privacy Statement
The information collected on Form 1 will be used by the Department of Local Government, Planning, Sport and Recreation in
accordance with the processing and assessment of your Application. Your personal details will not be disclosed for a purpose outside
of the IDAS process, except where required by legislation (including the Freedom of information Act 1992) or as required
by Parliament. This information may be stored in a Department of Local Government, Planning, Sport and Recreation database. The
information collected will be retained as required by the Public Records Act 2002. For further information on your privacy, contact the
Privacy Contact Officer for the Department of Local Government, Planning, Sport and Recreation at (07) 3237 1860.

 

 

 

 

 

Proposal ID

 

 

 

 

 

 

Click here to submit your DA

    

 

 

Page 8

 

INTEGRATED PANNING ACT 169/

   
 
 

 

Set Pee Ponies tel

iin

Pan A, Vernon 2.4, 2 May 2005

   

aft:

Ge

 

Tha comppion lace atest on Part Ais gnendatory for a¥ applications, Pari A mat be accompanied by he completed IAS Asseasment Check(at
taguied, and by one (1) of meve other completes earls of the Form as required. Fox mdre ittformation on the parts of the Form refer to wwina, Cid, Gov. au.
_ BY Stlrmaton requested in the form may b= provides in an tachment EO the appicaton, For further inorston hour coamplating the following details, refer ta Gu ide,

Description oftand “YW

Alitaial (hw auijogl ofthe @apication, masmoe
iden ad, Moswaver; # sencrip lool te and is FA _
teudrel in Astionty a rabies os tempoaety
Esvronmontétly Reielem Accviy (ERA). ”
Advicafor completa O2-C2zayiaZ
Gevelapment!s ropes wt webiDodytr

  

Beer engin i SCAN
CENRES by a meee Tregedeu
. Cat be ebtaad Irésn Sd cheat ho,

weal goremnmatt, 5 wae
Hover, ifthe hand on ich he deuclopmrentiy,
proposed doss got hive él. on plan dexcriotor fi,
Pee ena: taipor

 
  

   

 
   
   

“afoir eiaraié |.
‘CGE contd where theta 6 10°

* 8eiNagltdjacint!
7, does wol eppty tthe

Saelcnsig a wdioe Seay er WatareoRtg,

 

Adee eels Barter? Ig
Sevetonment fs if B koe OMAN area i
hol NOOBA Re. Cua | !

Note: Awoe below Regn insteemisegre ape thle 2.
hal goaromert’s arax'ontess prantad ier ued tie
LocalQondmmbnt Ad 1282"!

1. 9 w YY aps if

  

peeled ge wt For oyre doles (tir to Guida tf

 

Py

(9 neastion Bin), * o 5

Steet address: fretting hore number, sheet name, suburtvTocelty navne & postoods) (if applicable)

ITS Giant SReet Moose Heacts |

Name of water body o: watercourse, within whieh the evelopment ls proposed: (# opplixabe)

.

comme tee

‘Lot on plan desctiption (eg. Lct $23 on RP 4567}/-GPS coordinates:

(Cet 12” SP 74379” |

~The above description is for: tak applicatie box}

9 {}- the land on which the develapment is.proposed; or

~ (34): the jane adjoining the water body or-watercoutse, within which the development ig

proposed: o
Oo {ith the water body ot wabtroourse.
Shop Henancy number. <6," - Storey /tevel: 2, Total area of land: (nrorha):

 

 

L st |

Loces government area in which the land Is situated: to Esk, Higtvay Bay. Wooedo ste.) (i eopicebie)

Port authority for the strategic. ort iand or-strategi¢ port land tidal ares on which the
evelopment Is proposed: {eg Pot of Brishamy, Pert of Fowmevils) (if applicable)

l

 

 

 

 

 

  

i.
a
Advice for completing, 09 a
developers on stetege atid ora siden: ae
I
¥
i
i
V4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sar
Proposareale, 110, Existing use of the land: fog. veh, single house, shop ete .
hen is leslie 1
potato (Vacant |
41. Proposed useofthe land: (og. ime par rsment buteng, 30 lof residential subdivision, ERA for aquecutture In
PENG WH) 3 tetet area of 7 ha for which wastes ao released into wators ett).
| __]
Other applicable parts of Form 4 412, Other parts of Form 1 compléted:as part of this application: (eg. Part 0, Part J, eic)
Pon A rns adways tie serompeked by ot.ar 7
chinpiated pansofform 1, For anfstmation aboyt -
Se oat fT) toa te 2 lL . ne cee :
‘ 43, Applicant's name: * “45, Contact person:
. }
» Lo ae _
. Contect number: we 18. Saosimile numberle-mail address:
f ;
i
r. Postaaddress
. Signature: / : 19, Dare L
f

 

Td WEE 182 2282 6B “das

 

“ON SNOHa WNINTOD + Woe

 

Page 9

7 SOM + COLVIN PHONE HO. SEP. 89 2007 28:39AM P2

 

FAX NO. Feb. 23 1959 24:2324m P3
INEESRATEU PLANNING ACT 1997. a. __ _ _ Para, version 2 4, 29 May 2006,

Land ovner's consent ft anpianho) 20. Land owner's consent to th tothe making of am esa
Sachor $20) uethg Sa prozenbes tht on
Ap¢deaton inst contain, of be stipporiad 7, nb
swptign 2oisdn Of Do rund owoecrs, I the aputcation

) paaksalctange cute | | OX Co LAX & ED ke iX
i

i etomguaonotat PO
(a) wets 09 land bute high-waier mack & not wating

i ;
Tue aeted yds te Gott Puneuit and] a Craddeerhiy nu SE

I ~~ Wame
I-

Management Act 199&0r

 

Sy) work on ral gortigo’ Kan defines onset sha (ti)
Yrenapantttrastngtary Act 1904, wee
Section 38.4( te) Sto eXioier ie (v)

 

 

 

 

 

 

 

~ [ate Dees, this application involve, a:State respuroe prescribed under a toqulation (other than invating
Secon 92.48) of repented “40: avany mal on Scent int wir Col Peeler and Managentert Act 1995)?
ee oe er eee DI NOredoom,  LOYES - goto ce

invhe a prasetbed

22, This sinpicalion i s acgontpeniod by. evidence: flick applicable 801).
* (1G) rot te allocation of, of entifement to, the T@SOUTOR - attach avidenoe and ga to, 023)
“(71 she chief exeoutive of the depattment administering the resource Is satisfied the

. , sevelopment ‘Is. consistent wilh bn allocation: of, or enlifement to, the resource - go
: 19.023 | :

C2 ti} the -ohtef executive of the department! administering: thet resource Is satlsfied the
-davelopment application may proceed in the absence of an allocation of, of
 enfidemient to, ‘the resoutes ~ goto 023

‘To inferrtation nana 23. Evidange of thé resource enfierent

 

        
    
    

 

 

2.14
eT eee, arenL

for 2’,
Pee ® senecia {a he Taso Plonsing -

 

   
      
  

Gf eboro "Resource erttittemant ( authonly details (vil) Official stamp of the department .
‘restiaeecitr oe capi Nah ® : _ __i- administering the resource ( :
RoRautoes, eh nd Wee ata re, a = " —-—-—— : applicable) 2
2otcathon irvatves, aay waldr ec: we : . (i) ‘Name of ted: officer : |

_ |
seine cine =e " i+ (8) Position of delegated officar an |

 

{h) e ignaire. of delegated offices

i
(wy Date .

_ (a) Expiry date of evidence of _ -
. (lee 7 ;

1. is thé IDAS Assessment Checklist completed and stiaoned to this application?

fo

 

 

“Faceasiment vag ce
This ctl dans ot Dooly tb apaeaton

   
 

 

 

 

 

 

  

 

 

‘compl Cves » : -, OUNO~ fhe assessment manager may tefisa to accept this application on tte
Moltecpie! keane apc Oe ‘ - grounds thal de eppheaton has oct been propery made
Plons / drawing » 428: Piansldraningalrepors accompanying ths application:
oat Seocalt cs aarmd ey [Plan Orawing f Report Nutiber Title Date
manager riferrél agencies and tly’ Dereon Viewty, '
«the appfcaton giring pula tarvting oepubic =} ED
Thay Lp traps acre St paps! YL petnesrerecessee cee ecceec cence enero arers CR ee tenes thet e nnn n ee nae t nena ‘a
nd ay SAT rp ; . \ (6) ; i
fe eececesssstmesseesafececoncecssesesscenecaneesnusadpeessenecceen
} »
4 (iv) YS

 

 

 

 

== Pee <—
PLEASE NOTE: ‘The essassment manager may refuss bs aecepi 2n plein ma. af the time of lodgement, fails to provide all appicable information required by Pan A
and any other relevast pod of For 7

OFFICE USE ONLY it
(oppbcable te masses —

i FEEC

 
 
   

 

 

 

coin wn een ait asthe wont Qeenier oye Dulding work seemed be in Oia Sppewton-

ww. SSN . ee

 

Page 10

+
INTEGRATED PLANNING ACT 1997 Part £, Version 3.0, 3 September 2007

Part E

Building &/or operational works assessable against a planning scheme

 

   
 

 

 

 

 

‘Nature of the works

1. Is the application seeking approval of building work assessable against the local goverment planning scheme?

[*] No
(Yes

2. Is the application seeking approval of operational work assessable against a planning scheme?

— No

@ [e] Yes

2(a) Is the application seeking approval for more that one type of operational work?
(]_ No- Complete Table 8
{e] Yes - Complete a new Table B for each type of operational work

 

Table B
(i) Whats the nature of the operational work?
[e} Roadworks ( Stormwater [_] Water infrastructure [_] Sewerage infrastructure
[) Landscaping (LJ Clearing vegetation under the planning scheme (_] Earthworks

 

([] Drainage Works () Other - Specify below

Access and Carparking

 

(ii) Is the application for operational work involving the creation of new lots?”
[e}] No
@ (1 Yes - Specify number below

(iii) What type of approval is being sought?
(J) Preliminary approval
[e] Development Permit

 

(iv) Is there a current Preliminary Approval for this operational work on the premises?

[e] No

([) Yes - Complete Table B(a)

(v) Are the works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?

(J No

[e] Yes - Complete Table B(b)

Table B(b)

 

List of approval references Date approved Date approval lapses

 

 

 

 

 

1 MCU Development Approval; Reference Number 2007/799 09-Aug-2007 08-Aug-2011

 

 

 

 

 

Page 11

 

t

INTEGRATED PLANNING ACT 1997 Part E, Version 3.0, 3 September 2007

 

Table B
(i) Whatis the nature of the operationat work?
[DJ Roadworks [e] Stormwater (D1) Water infrastructure {_] Sewerage infrastructure
[J Landscaping {Z) Clearing vegetation under the planning scheme (2) Earthworks

[1 Drainage Works (] Other - Specify below

 

Stormwater Drainage

 

 

 

(ii) Is the application for operational work involving the creation of new lots?

[e] No

[] Yes - Specify number below

r

(iii) What type of approval is being sought?
(J Preliminary approval
[e] Development Permit

 

(iv) Is there a current Preliminary Approval for this operational work on the premises?

[e] No

([] Yes - Complete Table 8(a)

(v) Are the works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?

 

 

 

 

 

 

 

(J No
[eo] Yes - Complete Table B(b)
Table B(b)
List of approval references Date approved | Date approval lapses
1 MCU Development Approval; Reference Number 2007/799 09-08-07 09-08-2011
Table B
(i) What is the nature of the operational work?
([] Roadworks (L) Stormwater ([] Water infrastructure {_] Sewerage infrastructure
[[] Landscaping ([] Clearing vegetation under the planning scheme (-] Earthworks

(LJ Drainage Works [e] Other - Specify below

 

Frontage Works

 

 

 

(ii) Is the application for operational work involving the creation of new lots?

[e] No

(] Yes - Specify number below

(iii) What type of approval is being sought?
[L Preliminary approval
[e] Development Permit

 

iv) Is there a current Preliminary Approval for this operational work on the premises?

[e] No

[1 Yes - Complete Table B(a)

(v) Are the works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?

(] No

[e] Yes - Complete Table B(b)

 

 

 

Page 12

.

14
INTEGRATED PLANNING ACT 1997

Part E, Version 3.0, 3 September 2007

 

 

 

 

 

 

 

 

 

 

 

(D) Drainage Works [e] Other - Specify below

Table B(b)
List of approval references | Date approved | Date approval lapses
1 MCU Development Approval; Reference Number 2007/7989 09-08-07 09-08-2011 :
Table B
(i) Whatis the nature of the operational work?
[7] Roadworks [7] Stormwater ([] Water infrastructure [_) Sewerage infrastructure
[_] Landscaping [_] Clearing vegetation under the planning scheme LJ] Earthworks

 

Erosion and Sediment Control

 

 

 

(ii) Is the application for operational work involving the creation of new lots?

[e] No

[7] Yes - Specify number below

 

(iii) What type of approval is being sought?
[Jj Preliminary approval
[e] Development Permit

(iv) ts there a current Preliminary Approval for this operational work on the premises?

[e] No

[] Yes - Complete Table Bia)

J Ne

[e] Yes - Complete Table Bib)

Table B(b)

(v) Are the works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?

 

List of approval references

Date approved

Date approval lapses

 

1 MCU Development Approval; Reference Number 2007-799

 

 

 

 

09-08-07

09-08-2011

 

 

 

(Mandatory Information

3. Confirm that the following mandatory information accompanies this application

 

 

Confirmation of
lodgement

Method of lodgement

 

Plans showing the nature and location of the proposed works (including the extent of any cut and fil)

 

 

Confirmed

mail

 

 

 

 

OFFICE USE ONLY

 

 

Date Received Reference Numbers

 

 

 

 

Page 13

.

» &
INTEGRATED PLANNING ACT 1997

Advice for completing Part E

Part E, Version 3.0, 3 September 2007

 

General advice

* Part A must also be completed for all IDAS development applications.
+ — All questions must be answered unless, following a response, there is a statement to go directly to a particular question.

 

development to occur.

 

Q1&2 Adevelopment permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise

 

 

 

Proposal ID

 

 

 

 

 

 

 

 

 

 

Click here to submit your DA

 

 

 

Page 14

   

”

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 Aprit 2007

 

Rein 1 Development Apiiccion . } tie |
IDAS Assessment
Checklist

(Formerly the “Referrals Checklist”)

 

 

IMPORTANT NOTE FOR ALL APPLICANTS:

1,

2.

10.

11,

This checklist was formerly referred to as the "Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

Under the IPA and IDAS framework, an application may require assessment by the loca! Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).

This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager" for the application.

Therefore, the completion of alt questions in section 4 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
itis the responsibility of the applicant to accurately complete this checklist.

Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.

Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identity
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager wilt also rely on this information when identifying if the
application triggers referral coordination?.

To assist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.

Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.qid.gov.au.

Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

 

 

‘Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.

SECTION 14 - STATE ASSESSMENT (completion mandatory)

 

Environmentally relevant activity 1. The application involves: (tick applicable box/es)

For more information refer to Guide 4. (1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
Unless you answered “none of the above” to Q1, has not been made - complete Part G of Form 1

the application requires assessment by the - nr . . .

administering author 3. Ci (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
tf an entity, other than the administering made - complete Part G of Form 1

authority, is the assessment manager for the kK] (iii) none of the above

application, the administering authority is a
concurrence agency for the application in relation
to this matter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part Kr of Form 1
for approval where an allocation under the Water
Act 2000 is required.

 

 

Continued overleaf

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (applicable fo assessment manager)

 

DATE RECEIVED REFERENCE NUMBER/S

 

 

 

The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.
For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?”
The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA),
Page 4

 

 

Page 15

v

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

State-controlled road matters 2. The application involves: (tick applicable box/es)
For mare information refer to Guide 3. CA development on land contiguous? to a State controlled road and for -
Untess you answered “none of the above” to Q2, . . .
the application tiggers referral to the Department (J (a) material change of use assessable against the planning scheme;
ae ml nat an ie [11 (b) reconfiguring a fot unless -
agency, whe in other cieumstences OMR will « the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Seneinle 2of te & Regulation wl assist youto Oo operational work (not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above)—
« associated with access to a State-controlled road; or
for filling or excavation; or
involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
(1 (ii) development on land not contiguous to a State-controlled road and -
(1 (a) material change of use -
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;

(1 (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation

and exceeding the thresholds set by that schedule;

©) (c) operational work (not associated with a material change of use assessable against the

planning scheme or reconfiguring a lot mentioned in (b) above)-
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
EX] (ili) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
pp

For more information refer to Guide 12. oO (i) material change of use -
Unless you answered “none of the above" to Q3, . . .
the application requires assessment by the (a) assessable against the planning scheme;
Department of Natural Resources and Water ining —
(NRW), (b) on a lot containing _
ifan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRWisa « if there is no property map of assessable vegetation for the lot - remnant vegetation;
fonaurTenoe agency forthe application in relebon (c) where the existing use of the land is a rural or environmental use; and
tf you ticked 03(}) or (i), your application requires| (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to NRW for assessment regardless of oO (ii) reconfiguring a lot -
whether vegetation clearing Is proposed or not .

(a) onalot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;

(b) where the size of the lot before the reconfiguration is 2 hectares or larger;

(c) where 2 or more lots are created; and

(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1

(ill) operational work -

(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and

(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 4

EX (iv)_ none of the above.
Strategic port land 4. The application involves:

For more information refer to Guide 11.

If you ticked (i) - the relevant Port Authority is the
assessment manager for the application.

If you ticked (i) Queensland Transport is a
concurrence agency for the application.

 

LD (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part ! of Form 1

UO (ii) a material change of use that is inconsistent with the land use plan approved under the
Tl Act for the strategic port land - complete Part | of Form 1

& (iii) none of the above

 

4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean tand - if part of the !and is within 100m of the State-controlled road; or that is part of a future State-

controlled road.

Page 2

 

Page 16

”
INTEGRATED PLANNING ACT 1997

Acid sulfate soits 5.
For more information refer to Guide 10.

Unless you answered “none of the above” to 05,
the application requires assessment by
Department of Natural Resources and Water
(NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is an advice
agency for the application in relation to this
matter.

IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves development on land situated in an identifieds local government area
and where the surface of the land is: (tick applicable box)
(I (i) below 20m AHDS and the development will involve the excavation of 1000m? or more of
soil or sediment at or below 5m AHD, or

LD (ii) at or below 5m AHO and the development will involve filling the site with 1000m? or more
of material

(iii) none of the above

 

 

Major hazard facilities or possible 6.
Major hazard facilities

For more information refer to Guide 17.

If you answered “YES” to Q6, the application
requires assessment by the Department of
Emergency Services (DES).

If an agency other than DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
elation to this matter.

 

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

NO
[YES - complete Part L of Form 1

 

Water related development under the | 7.
Water Act 2000

For more information about items (a) - (f), refer
to Guide 15. For more information about item
(g), refer ta Guide 14 Does my application
involve assessment of a referable dam?

Unless you answered ‘none of the above” to Q7,
the application requires assessment by the
Department of Natural Resources and Water
(NRW),

lf an agency other than NRW is the assessment
manager for the application, NRW Is a
concurrence agency for the application in
telation to this matter.

Removal of quarry material from a 8.
watercourse
For more information refer to Guide 16.

{f you answered “YES” to Q8, the application
requires assessment by the Department of
Natural Resources and Water (NRW).

if an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

Note; Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse Is also an
Environmentally Relevant Activity (ERA).

 

The application involves:

(1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)

(a) in a watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Ke, Ks, Ks, Ke, or Ks of Form 1 whichever is applicable;

( (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
Ky of Form 1;

C1 (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered

by a water resource plan, for use for purposes other than stock and/or domestic

use - complete Part K; of Form 1;

for a subartesian bore, in certain declared subartesian areas, for use for stock

and/or domestic purposes - complete Part Ky of Form 1;

for taking overland flow water in certain areas covered by a water resource plan

- complete Part Ks of Form 1;

for interfering with overland flow water in a drainage and embankment area -
complete Part Kioof Form 1

Of
(11 (g) for constructing a referable dam? or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; or

EX (ii) none of the above.

O@
Oe)

Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?

KI NO

(YES - complete Parts Kz and G of Form 1

 

Coy

The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cootoola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vate, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

Australian Height Datum (AHD).

The declared ground water areas are listed in Guide 13
Referabte dam is defined under the Water Act 2000.
Watercourse is defined in sch 10 of the IPA.

ment in a declared

Page 3

Page 17

©

.
INTEGRATED PLANNING ACT 1997

Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more information about prescribed tidal work in
local goverment tidal areas refer to Guide 24.
Unless you answered ‘none of the above” to 09,
the application requires assessment by the
Environmental Protection Agency (EPA).

If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
elation to this matter.

Local govemmentis the assessment manager
for all prescribed tidal work.

IDAS Assessment Checklist, Version 20, 2 April 2007
9. The application invalves operational work that is: (tick the applicable box/es)

LI (i) tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; or

CU (ii) tidal work that is prescribed tidal work" other than in a canal’? -complete Part P of Form 1; oF

Util) carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) fo ()) below are ticked.

(J (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;

[J (b) constructing a canal"? intended to be connected to tidal waters;

LJ (e) constructing an artificial waterway;

( (d) reclaiming land under tidal water;

[J (e) disposing of dredge spoil or other solid waste material in tidal water;

(1 (f) _ interfering with quarry material on State coastal land above high-water mark;

[1 (g)_ draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

(1 (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

O(i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

XI (iv) none of the above.

 

Operational work below high water
mark

For more information refer to Guide 18. For
more information about prescribed tidal work in
locat government tidal areas refer to Guide 24.
Unless you answered "none of the above” to
Q10, the application triggers referral to
Queensland Transport (QT) (Maritime Safety
Qld) as a concurrence agency.

Local government is the assessment manager
for all prescribed tidal work.

 

10. The application involves operational work that is: { tick the applicable box/es)

(i) tidal work"3 as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

C (ii) tidal work that is prescribed tidal work"4 - complete Part P of Form 4; oF
C1 (iii) carried out within a coastal management district'® under the Coastal Act and for -

(1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Mof Form 1;

[J (b) reclaiming land under tidal water - complete Part M of Form 1; or

Ci (c) constructing a canal!'2, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;

[KI (iv) none of the above.

 

Coastal management
For more information refer to Guide 18.

Unless you answered "none of the above" to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).

If an agency other than EPA Is the assessment
manager for the application, EPA is a
concurrence agency for the application in
elation to this matter.

 

11. The application involves: (tick the applicable box/es)

C1 (i) amaterial change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district's

D(ii) a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -
« the construction of a new premises with a GFA’ of at least 1000m2
e the enlargement of the GFA of existing premises by more than 1000m?

O(ii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

Ci (iv) reconfiguring a fot’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal’? - complete Part M of Form 1

(v) none of the above

 

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in tha Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area,
12 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regutation 2003 and includes certain tidal works completely or partly within a local government tidal area.

18 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.

16 GFA Is defined in sch 14 of the IPA to mean the gross fleor area. For a definition of how to calculated GFA, go to the ptanning scheme against which the application Is being assessed.

17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.

Page 4

Page 18

.
INTEGRATED PLANNING ACT 1997

Development within the limits of a

port

For more information refer to Guide 18. For

information about prescribed tidal work refer to

Guide 24.

if you answered "YES" to Q12, the application

triggers referral to the Port Authority.

The Port Authority is a concurrence agency if the

development is -—

¢ within 200m of a shipping channe! or an entry
and exit shipping corridor for the port

© within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

¢ within 1000m of a planned port facility
identified in a land use plan approved under
the Transport infrastructure Act 1994.

in all other situation the Port Authority is an

advice agency.

Marinas

For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24. The local
government is the assessment manager for all
prescribed tidal work.

If you answered “YES" to Q13, the application
triggers referral to Queenstand Fire and Rescue
Service as an advice agency,

 

 

13.

IOAS Assessment Checklist, Version 20, 2 Aprit 2007
Does the application invoive development below high water mark'® and within the limits of a port
under the Transport Infrastructure Act 1994?

x] No

(YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

Does the application involve operational work that is tidal work for a marina’? with more than 6
vessel berths?

XJ NO

(C1 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

 

Tidal works in strategic port land tidal
areas

For more information refer to Guide 18,

Unless you answered “NO” to Q14, the relevant
Port Authority is the assessment manager for the
application and the Environmental Protection

Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application.

Heritage

For further information refer to Guide 19.

Ifyou answered “YES” to Q15, the application
triggers referral to the Queensland Heritage
Council as concurrence agency for the
application.

 

Unless you answered “none of the above” to
Q15(b), the application involves referral to the

Environmental Protection Agency as an advice
agency for the application

=

4.

15.

Does the application involve tidal works within a strategic port land tidal area2°?
NO

(YES - complete Part M of Form 1

Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?

INO

(11 YES - complete Part C of Form 1

15(b)The application involves: (tick applicable boxes)

(i) amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;

QO (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
KX (iii) none of the above.

 

Declared catchment areas

For more information, inctuding a list of the
declared catchment areas within Queensland,
refer to Guide 13,

Untess you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

 

16,

The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)

(i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;

CL (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994,

1 (iii) none of the above

 

 

18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide,
19 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995,
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Page 19

.
INTEGRATED PLANNING ACT 1997,

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

Contaminated land 17. The application involves: (tick the applicable box/es)

Applications involving material change of use (1 (i) reconfiguring a fot for which all of part of the premises are -

anal of reconfgoing alot may bigger this (a) premises mentioned in the IPA, schedule 8, part 1, table 2 -

For more information refer to Guide 5. « item 5, including the exemption otherwise provided for by paragraph (d);

Unless you answered ‘none of the above” to « item 6, including the exemption otherwise provided for by paragraph (e); or

Q17, the application requires assessment by the « item 7, including the exemption otherwise provided for a mining activity or petroleum
Environmental Protection Agency (EPA). ff an activity; or

agency other than EPA is the assessment : ' .

manager for the application, EPA will be a (b) in an area for which an area management advice has been given for unexploded
Concurrence agency for the application in ordnance - complete Part N of Form 1

telation to this matter.

0 (i) a material change of use -

(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or

(b) assessable against the planning scheme and if all or part of the premises is in an area

for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
(iii) none of the above
Electricity infrastructure 18, The application involves: (tick the applicable box/es)
For more information refer to schedule 2of the {P DC () reconfiguring a fot where any part of the lot is -
Regulation. . . pete ae . oe A
Unless you answered “none of the abovet to . subject to an easement in favour of a distribution entity or transmission entity under the
18, the application triggers referral to the lectricity Act 1994 and the easement is for a transmission grid or supply network under
agency to which the easement is granted in that Act; or
favour of as advice agency. « situated within 100m of a substation site;

DI (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
any part of the premises is subject to an easement in favour of a distribution entity or

transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

Di (il) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;

Ci (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -

« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

« the work is located wholly or partly within 10m of a substation site;

EJ (v)_ none of the above.

Land designated for community 19. Does the application involve development assessable against the planning scheme and on land

infrastructure

Applications involving development on land
designated for community infrastructure may
trigger this referral.

For mare information refer to schedule 2 of the
IP Requiation.

If you answered "YES" to 019, the application
fequires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
if an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter.

 

designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
(i) on land not owned by or on behalf of the State; and
(iii) other than development -—

(a) for the designated purpose; or

(b) carried out by, or on behaif of, the designator.
NO
C)yes

 

Page 6

Page 20

’
INTEGRATED PLANNING ACT 1997

SEQ Regional Plan

For more information refes to schedule 2 of the
IP Requiation.

Refer to Chapter 2, part 5A and schedule 10 of

the integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.

Untess you answered “none of the above” to
020, the application requires assessment by the
Office of Urban Management (OUM).

IDAS Assessment Checklist, Version 20, 2 Aprit 2007
20. The application involves (tick applicable box/es) -
C1 (i) amaterial change of use of premises -
(a) in a Major Development Area in the Urban Footprint for -
6 @)  anurban activity -
(1s inanarea included in a structure plan where the IPA, section 3.1.6
applies;
[1s inan area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme
CJ (ii) intensive animal husbandry, or

OO (ili) residential development involving a rural residential purpose

{b) in the Regional Landscape and Rural Production Area for -
© (i) anurban activity and not specified in section 2.4(2); or
0 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

(d) in the Investigation Area for -
OO (i) anurban activity and not specified in section 2.10(2);
UO (ii) residential development involving a rural residential purpose and not

specified in section 2.12(2); or
CI (iii) intensive animal husbandry
LC (ii) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) notincluded in a structure plan; and
{b) not specified in section 3.1(2).

EJ (ii) none of the above

 

Fisheries matters

For more information refer to schedule 2of the IP
Regulation.

Untess you answered “none of the above" to
Q21, the application requires assessment by the
Department of Primary Industries and Fisheries
(OPI&F).

{fan agency other than DPI&F is the assessment)
manager for the application, DPI&F is a
concurrence agency for the application in
felation to items (i) - (Iv) and an advice agency
in relation to item (v).

21. The application involves: (tick the applicable box/es)

C1(i)_ an assessable material change of use for aquaculture - complete Part O; of Form 1;

C1 (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 1;

LD (ili) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;

[1 (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;

C1 (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;

 

1 (vi) none of the above.

 

Page 7

Page 21

‘
INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport

For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Requlation.

Unless you answered "none of the above”, the
application triggers referral to QT as a
concurrence agency,

{OAS Assessment Checklist, Version 20, 2 April 2007

22. The application involves: (tick the applicable box/es)—

C1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

D (ti) reconfiguring a lot—

[1 (@) _ onland that is completely or partly within a public transport corridor, and the
total number of lots increases;

[J (b) _ on land that is completely or partly within a future public transport corridor or
an airport's public safety area;

C1 (c) _ on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m2 or greater;

(1 @) for a residential purpose within the 25 ANEF contour for an airport;

LJ (e) for a residential purpose resulting in 100 or more allotments.

LU (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—

(1 (a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
C1 (b) _ will result in work that encroaches into an airport's operational airspace.

E41 (iv) none of the above.

 

 

 

Railway safety and efficiency 23, The application involves: (tick the applicable box/es)—
For mare information refer to Guide 23, schedule i) a material change of use assessable against the planning scheme for a purpose
BA of the PA & schedule 2 of ne IP Regulation aon. Oo mentioned in schedule 13D of the IP Regulation and excending the thresholds set by that
Untess you answered “none of the above’, the
application triggers referral to QT as a schedule.
concurrence agency. CO (ii) reconfiguring a lot
C1 (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(1 (b) on land thatis within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
CJ (c) _ ontand that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
[J (d) on tand that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
Ce) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(CO ( _ for a residential purpose resulting in 100 or more allotments.
LD (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—
C1 (a) is completely or partly within rail corridor land or commercial corridor tand, and
the work is not for rail transport infrastructure or other rail infrastructure;
(] (b) is completely or partly within future railway land, or a railway tunnel easement;
C1 (e) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
EX (iv) none of the above.
Moonie to Brisbane pipeline 24, The application involves the easement for the construction or operation of the Moonie to

For more information refer to schedule 2of the IP
Regulation.

Unless you answered “none of the above", the
application triggers referral to the holder of
pipeline licence No 1 issued under the Petrofeum|
Act 1923, currently Santos QNT Pty Ltd, for
advice.

 

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

C (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

C (ii) reconfiguring a lot

C (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

EX] (iv) none of the above.

 

Page 8

Page 22

.
INTEGRATED PLANNING ACT 1997

Koala habitat area

For more information, refer to Guide 26 and
schedule 2 of the IP Requiation.

Unless you answered “none of the above’, the
application requires referral to the Environmental
Protection Agency as a concurrence agency.

 

Wild river area
For more information, refer to Guide 27

Ifyou answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wild river area.
Note: Development can be ‘prohibited’ in a wild

fiver area because the application cannot be
accepted by the assessment manager,

IDAS Assessment Checklist, Version 20, 2 April 2007

25. The application involves: (tick the applicable box/es)—

LD (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in —

LI (a) clearing of native vegetation over an area greater than 2500m?,

(1) (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2;

(J (c)_ an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2,

(1 (a) extracting gravel, rock or sand from an area greater than 5000m2;

(5) (e) excavating or filling an area greater than 5000m?;

(J (f) additional traffic in a koala conservation area or koala sustainability area,

between 6p.m. on a day and 6a.m. on the following day.

OO (ii) reconfiguring a lot in a koala conservation area or koala sustainability area that will
result in -

[J (a) an increased number of lots;
[1 (b) clearing of native vegetation over an area greater than 2500m2.

(1 (ii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a fot mentioned in (ii) above) that wilt result in the clearing of native vegetation
over an area greater than 2500m2.

C1 (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in {i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -

L) (a) clearing of native vegetation over an area greater than 2500m?;
[1 (b) extracting gravel, rock or sand from an area greater than 5000m?;
[J (c) excavating or filling an area greater than 5000m?.

EX] (v) none of the above.
26. Does the application involve development in a wild river area declared under the Wild Rivers Act
2005?
KINO
OyYes

 

Preliminary Approval
if you answered YES to Q27, the application
triggers referral to the Department of Local

Govemment, Planning, Sport and Recreation as
an advice agency.

27. Does the application involve a development for which preliminary approval is sought under
Section 3.1.6 of the integrated Planning Act 1997?

EK] No
Dyes

 

Wetlands

Oomestic activity means the construction or use
of a single residence on a lot and any reasonably
associated building or structure. Examples of a
building or structure that could be reasonably
associated with a single residence include:
caretaker's residence, granny flat, building or
structure used for a home business.

Note: Wetland is defined in the Integrated
Planning Regulation 1998.

Unless you answered “none of the above” to
Q28, the application involves referral to the
Environmental Protection Agency as an advice
agency for the application.

 

28. The application involves: (tick the applicable boxes) -

L()) — amaterial change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;
OO (ii) reconfiguring a lot -

In or within 100m of a wetland that will result in
C1 (a) more than 10 lots being created; or
LJ (b) lots less than 5 hectares;

EX (iii) none of the above

Page 9

Page 23

s
INTEGRATED PLANNING ACT 1997
Conservation Estate

Urban purposes is defined in the Integrated
Planning Act 1997 as “purposes for which land is
used In cities or towns, including residential,
Industrial, sporting, recreation and commercial
purposes, but not including environmental,
conservation, rural, natural or wikdemess area
purposes”.

Unless you answered "none of the above" to
Q29, the application involves referral to the

Environmental Protection Agency as an advice
agency for the application.

 

IDAS Assessment Checklist, Version 20, 2 April 2007
29. The application involves: (tick the applicable box/es)—
~ £1(i) a material change of use for urban purposes that is in or within 100m of any of the
following -
Ci (a) aprotected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;;

(1 (b) a State forest or timber reserve under the Forestry Act 1959;

Cl (c) amarine park under the Marine Parks Act 2004;

(J (d) arecreation area under the Recreation Area Management Act 1988;

(J (e) aworld heritage area listed under the World Heritage Convention;

C1 (f) Brisbane forest park under the Brisbane Forest Park Act 1977.

U0 (ii) reconfiguring a lot if -

(1 (a) any part of the lot is situated in, or within 100m of, any of the following -

D(i) _— aprotected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
D(ii) a State forest or timber reserve under the Forestry Act 1959:
Di (ii) a marine park under the Marine Parks Act 2004;
(J (iv) arecreation area under the Recreation Area Management Act 1988;
(1 (¥) _ aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
(1) (») the reconfiguration involves more than 10 lots being created, or any tot
resulting from the reconfiguring is less than 5ha;
KX (iii) none of the above,

 

Page 10

Page 24

.
INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

SECTION 2 - ASSESSMENT IN A WILD RIVER AREA

(completion mandatory if the proposed development is located in a wild river area)

 

Wild River Area

It the responsibility of the applicant to
determine if the development is proposed in
a wild river area.

Information about wild river areas including the
geographical location and position of
management areas in relation to properties, can
be accessed by contacting the Department of
Natural Resources and Water (NRW), accessing
the department's website www.nrw.qid.qov.au or
contacting the department by email on:

wild [email protected]'d.qov.au

Note on Referrals

Referrals for development in a wild river area
{other than for agricultural activities and animal
husbandry activities) are not changed from the
existing referral arrangements.

Notes on development assessable
against the Wild Rivers Code

For information regarding development in a wild
iver area, see the relevant wild river dectaration
and Guide 27. The relevant wild river
declaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt
from wild river requirements.

The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
may vary between wild river areas. The relevant
declaration will provide the information applying
to each wild river area.

Applications for some new developments will not
be accepted if the proposed development is in a
high preservation area (HPA). Most applications
for development activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a relevant
wild river declaration.

 

1.

Which wild river area is the development proposed in?

 

NA

 

 

 

The proposed development is to be located in: (tick the applicable box/es}
(Ji) a high preservation area (HPA);

(J ii) a preservation area (PA) ;

(J iii) a wild river floodplain management area (FMA);

(J iv) a wild river nominated waterway;

(J v) a designated urban area (DUA).

 

Environmentally relevant activities
(ERAs) in a designated urban area

Ifyou answered YES, your application for an
ERA is exempt fram any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do not need to complete the
temaining questions in Section 2.

if you answered NO to Q2, please complete the
remaining questions in Section 2.

Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?

i) An ERA 28 or ERA 14; or
ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
NO Q YES (ensure you have completed Part G of Form 1)

 

Clearing native vegetation

If YES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Guide 27 for a list of relevant purposes for
which an application may be made In a HPA.

If YES and you ticked Q4 box i) the application
may be made and is assessable against the Wild
Rivers Code. If YES and you ticked 04 box fi}
the application will not be accepted.

Note: If clearing native vegetation is ina PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions
in Section 2.

4,

 

Is the application operational work for clearing native vegetation in a HPA?
NO O YES (ensure you have completed Part J of Form 1)

{f YES, is the clearing?

CO i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or

(CJ ii) in a HPA outside a registered area of agriculture?

 

Page 11

Page 25

“V

s
INTEGRATED PLANNING ACT 1997

Works in tidal areas, coastal
management districts and fish habitat
areas

lf you answered YES to Q5, and ticked any
boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.

Ifyou answered YES to Q5 and ticked box i) in
Q6, your application is required to be referred to
the EPA.

Note: If specified works are proposed in a local
government area, it is prescribed tidal work — the
relevant local government will be the
assessment manager with the EPA as 2
concurrence agency

If you answered YES to Q5, and ticked box #) or
id) in Q6, your application requires referral to
OPIF.

If you answered NO to QS and ticked box j) in
Q6, the application will not be accepted.

If you answered NO to Q5, ticked box ii) in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or if a
tequired permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will
not be accepted,

if you answered NO at Q5 and ticked box iii) in
Q6, the application may be made if the works are!
inaPA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.

For more information about specified works refer
to Guide 27

IDAS Assessment Checklist, Version 20, 2 April 2007
Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)

NO Ll yes

The application is for one or more of the following:

(J i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); OF

O ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1); OF

oO iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).

 

Residential, commercial or industrial
development

\f you answered YES to Q7, your application is
not subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild
fiver declaration ar Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.

Ifyou answered NO to Q7 and ticked either box
4) or ji) in Q8, the assessing agency is the
relevant local goverment. The application must
be assessed against and must comply with the
Wild Rivers Code.

Is the application for residential, commercial or industrial development in a designated urban

area?
Jno LJ yes

If NO, does the application for residential, commercial or industrial development involve:

(Ji) a material change of use made assessable in a local government planning scheme
{ensure you have completed Part D of Form 1); or

CJ it) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).

 

Animal husbandry activities

If you answered YES to Q9 your application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for animal husbandry
activities will not be accepted if proposed in a
HPA, For more details and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27,

Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?

{J No oO YES (ensure you have completed Part R of Form 1)

 

Agricultural activities

If you answered YES to Q10, your application
fequires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for agricultural activities will
not be accepted if proposed in a HPA. For more
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
27.

The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.

 

10.

Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
aPA?

No

If YES is the application for:
(J i) a material change of use; or
{J ii) operational works.

[1 YES (ensure you have completed Part of Form 1)

 

Page 12

Page 26

‘
INTEGRATED PLANNING ACT 1997

Works that take overland flow water

The relevant wid river declaration will state
works that take overland flow water are either
self assessable or assessable, or are exempt
from wild river requirements.

Ifyou ticked 013 i), your application must be
assessed by NRW against the Wid Rivers Code
and must comply with the code,

If you ticked Q13 Ii) an appiication is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application’
Is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

IF you ticked Q13 iii) your application is not
subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

13.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overland flow water in a HPA or an FMA?

(no ([] YES (ensure you have completed Part Ke of Form 1)

If YES, is the application for works stated in the relevant wild river declaration to be?
(Ji) assessable works

Oo il) self-assessable works

(J it) exempt works

 

Works that interfere with overland
flow water

The retevant wild river declaration will state
works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.

Ifyou ticked Q15 i}, your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

Hf you ticked Q15 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code,

If you ticked Q15 iii) your application is not
Subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

Does the application involve works that interfere with overland flow water in a FMA?
[xX] NO | YES (ensure you have completed Part Kyo of Form 1)

If YES, is the application for works stated in the relevant wild rivers declaration to be?
(J i) assessable works

L Jil) self-assessable works

CD itt) exempt works

 

Waterway barrier works

Applications for building or raising waterway
barrier works in a HPA will not be accepted.
If you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

16.

Does the application involve building or raising waterway barrier works in a PA?
&) NO O YES (ensure you have completed Part Os of Form 1)

 

Aquaculture (non ERA}

Applications for aquaculture in a HPA will not be
accepted.

Ifyou answered YES to Q17, your application

must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

Does the application involve aquaculture in a PA?
XX] No J] YES (ensure you have completed Part Os of Form 1)

 

 

Works that interfere with water in a
watercourse

Note: If the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse {including dams or weirs,
steam realignment or stream diversion) will not
be accepted.

In a PA, applications for instream dams and
weirs may be accepted in nominated waterways.
If you ticked box ii) in Q19, your apptication will
not be accepted.

Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.

More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website

www. ninw.qgid.gov.au or contacting the
department by email on:

wild. [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

XI No

IF YES,
Ol i) The application is for an instream dam or weir; or

Oo ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

a] YES (ensure you have completed the relevant Part K of Form 1)

Page 13

 

Page 27

Oa)

a
INTEGRATED PLANNING ACT 1997
Environmentally relevant activities

Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
Tequire referral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
local government (see EPA website for more
information on devolved ERAs)

Ifyou answered NO to Q20 you do not need to
complete Qs 21-24.

Ifyou answered YES to 20 and the
development is in a PA, your application must be
assessed by the administering authority?!
against the Wild Rivers Code and must comply
with the code, unless the proposal is for
development where an application will not be
accepted, or is exempt from wild river
fequirements (see Q2). You will be able to
determine if an application will not be accepted
for the development by answering O21 - Q24.

If you answered NO to Q21, you do not need to
complete Q22. If you answered YES to Q21 you
are required to complete Q22.

if you answered NO to 022, the application will
not be accepted. If you answered YES to Q22,
the application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code,

(f you answered NO to Q23 and the development
Is proposed in the HPA the application will not be
accepted. If you answered YES to Q23, the
application must be assessed by the EPA or
NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code.

Ifyou answered YES to Q24 the application will
not be accepted. If you answered NO to Q24,
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.

Exempt ERAs in a designated urban
area

If the development is proposed in a designated
urban area there may be no wild river
fequirements. See Section 2 Q2.

Note: All applications that can be accepted must
be assessed against and must comply with the

Wild Rivers Code (other than exempt ERAs in a
designated urban area).

20.

21.

22.

23.

(DAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve an ERA?

NO LJ YES (ensure you have completed Part G of Form1)

Is the application for an ERA 20 instream?

[xX] No Clyes
ls a quarry allocation notice held for the proposed ERA 20 instream?
Ino (yes

Does the application involve any of the following in a HPA?
i) alevel 2 ERA 11, (and is for specified works or a residential complex)
ii) an ERA 19 (dredging)

iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)

iv) an ERA 22 (out of stream)

EX] no (yes
Is the proposed development for ERA 20 (out of stream) and;
— in aFMA; and

— not low impact; and
— not for a residential complex in the area, or for specified works.

XI No (J Yes

 

Documentation

Ifyou answered NO to Q28, your application
may be subject to an information request and
processing of the application may ba delayed.

 

25.

Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code?

KX] No Clyes

 

2 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.

Page 14

Page 28

»
INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

SECTION 3 -

BUILDING REFERRALS (completion not mandatory)

 

Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.

 

Special fire services - generally 1,

For more information go to schedule 2 table and
schedule 2A of the IP Reaulation.

Assessment period 15 days. No response is a
deemed refusal.

An application may trigger referral to Old Fire and Rescue Services as an advice agency if the building work
tequires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
(IP Regulation) or includes an altemative solution assessed against the performance requirements of the
Building Code of Australia.

 

Fire safety for budget accommodation | 2,
For more information go to schedule 2 of the IP.
Regulation

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
the subject of the application requires the installation of a fire safety system for a budget accommodation
building.

 

Spray painting 3.
For more information go to schedule 2 of the IP.
Requiation

An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves a workplace incorporating spray painting.

 

Retail meat premises 4,
For more information go to schedule 2 of the IP.
Regulation

An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
retail meat premises.

 

 

 

Private health facilities 5
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Health as a concurrence agency if the application
involves a private health facility.

 

Workplace area less than 2.3m? 6.
For more information go to schedule 2 of the IP.
Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m2,

 

Land contiguous to a State-controlled | 7.
road

For mora information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
agency if the application involves land contiguous to a State-controlled road.

 

Pastoral workers accommodation 8.
For more information go to schedute 2 of the [P

Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves pastoral workers accommodation.

 

Child care centre 9.
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Communities as a concurrence agency if the
application involves a childcare centre.

 

Coastal development 10.

For more information go to schedule 2 of the [P
Requtation

An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
if the application involves land completely or partly seaward of a coastal building line22,

 

Heritage 1.

For more information go to schedule 2 of the IP
Reaulation

An application may trigger referral to the Heritage Council as a concurrence agency if the application
involves a heritage registered place.

 

Fisheries matters 12.

For more information go to schedute 2 of the IP
Regulation

An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
concurrence agency if the application involves assessable building work in a declared fish habitat area; or
as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area.

 

Integration of land use and public 13.

transport
For more information go to schedule 2 of the IP
Requiation

An application may trigger referral to Queensland Transport as a concurrence agency if the application
invalves existing or future public transport corridors, or airport operational airspace?3.

 

Railway safety and efficiency 14.

For more information go to schedute 2 of the 1P
Regulation

 

An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves future railway land.

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS

The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal, However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no

fesponse is taken to be a deemed approval.

 

Amenity and aesthetic impact of 15.

particular building work for single
detached class 1 building or class 10
building or structure

For more information go to schedule 2 table 1 of the
IP Regulation,

Assessment period 15 days. No response is a
deemed approval.

 

An application will trigger a referral to the local government if it is :
e fora single detached class 1 building or class 10 structure; and
«the local government has declared by resolution the following:
~ the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and
— the appearance of the building or structure would be in extreme conftict with the character of the
locality.

 

2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995.
2 Operational airspace is as defined in State Planning Policy 1/02 "Development in the Vicinity of Certain Airports and Aviation Facilities”.

Page 15

 

 

Page 29

4

*

> ©
INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

 

 

 

 

designated rainwater tank area

For more information go to schedule 2 table 1 of the
IP Regulation and the QOC part 25.

Assessment period 15 days. No response is a
deemed refusal.

 

 

Whether particular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a

occupied for residential purposes teferral to the local government as the concurrence agency.

For more information go to schedule 2 table 1 of the

IP Requtation,

Assessment period 15 days, No response is a

deemed refusal,

Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work

For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.

IP Regutation. 18. An application may trigger referral to the local government as the concurrence agency if the building work

Assessment period § days. No response Is a does not comply with the qualitative statement for building clearance and site cover.

deemed refusal. 19. An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.

Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the

accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has

For more information go to schedule 2 table 4 of the been completed.

(P Reaulation.

Assassment period 15 days. No response is a

deemed refusal,

Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the

services building work

For mora information go to schedule 2 table 1 of the © — complies with the performance criteria of the Queensland Development code part 15; and

IP Regulation and the QDC part 15. «the work does not comply with an acceptable solution stated in the part.

Assessment period 15 days. No response is a

deemed refusal.

Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential

For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger

IP Regulation and the QOC part 20. teferral to the tocal government as the concurrence agency.

Assessment period 15 days. No response Is a

deemed refusal.

Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger

rebuilding teferral to the local government as the concurrence agency.

For more Information go to schedule 2 table 1 of the

IP Regulation,

Assessment period 5 days. No response is a

deemed refusal.

Building work for rainwater tank in 24, An application may trigger referral to the local goverment as the concurrence agency to determine if the

building work or structure complies with the relevant performance criteria if -

e Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and

e Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria.

 

Page 16

 

Page 30

If telephoning or calling please ask for:

NOOSA Tracy Arthur, 5449 5228

Email: [email protected]

 

COUNCIL Application Ref: 2007/799
Your Ref:
00765 LO2 KG
9 August 2007
| oO _—
Calvin Albert Todd & Paul Joseph Lanskey i — “eee a
CARE Martoo Consulting Pty Ltd b™ £9 AUG 2 S.

PO Box 1684 i imal
NOOSA HEADS QLD 4567 i ak

 

Dear Sir/Madam,

Re: Application for a Development Approval for Material Change of Use for
Multiple Housing Type 2 Duplex situated at 15 Grant Street Noosa Heads
described as Lot 12 SP 179879

| refer to your application and advise that on 9 August 2007 Council decided to approve
the application and grant a Development Permit, subject to conditions.

Details of the decision are contained in the attached Decision Notice.

Please note that an Infrastructure Charge in accordance with the Coastal Major Road
Network Infrastructure Charges Plan has been triggered by the approval of this
development application. An Infrastructure Charge Notice is attached in compliance
with Chapter 5 of the Integrated Planning Act 1997.

You are entitled to appeal against this decision. A copy of the relevant appeal
provisions from the Integrated Planning Act is also attached.

During the appeal period, you as the applicant may make written representations to
Council about the conditions contained within the development approval. If Council
agrees with the representations, a “negotiated decision notice” will be issued. Only one
“negotiated decision notice’ may be given. Taking this step will defer your appeal
period, which will continue after Council makes its decision. (Sections 3.5.17 and
3.5.18 of the Integrated Planning Act refer).

Should you wish to obtain more information about Council’s decision, the reports and
staff recommendations regarding this application are available for viewing or purchase
at the Level 2 counter of Council offices: It would assist Council staff if you could bring
this letter with you.

Yours faithfully,

TrewuglOrthaw
Tracy Arthur
SENIOR PLANNING OFFICER

Encl: Decision Notice
Infrastructure Charge Notice

Award Winner ~ Australian Clean Beach = NIOQOQSA COUNCIL svnsenu
Challenge 2004 Litter Prevention 9 Pelican Street Tewantin PO Box 141 Tewantin Q 4565
Phone: 07 5449 5200 Fax: 07 5447 1062
Email: [email protected]

Page 31

 

N(OlONY-S Form 6 - Decision Notice
COUNCIL

 

 

INTEGRATED PLANNING ACT 1997, $3.5.15, IDAS DEVELOPMENT APPLICATION

 

 

File No: — 2007/799 Date of Decision: 9 August 2007
APPLICANT DETAILS ” ” 4
_ Name: Calvin Albert Toad & Pau! Joseph Lanskey

Postal address: CARE Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS QLD 4567

Phone no: 07 5455 5425 Fax no: 07 5455 5725

 

Street address: 15 Grant Street Noosa Heads

Real property: Lot 12 SP 179879
description:

   

ane cme

OWNER DETALS

 

 

 

   

 

 

 

 

   

 

Name: Calvin Albert Todd & others
Postal address: 480 Grieve Road
ROCHEDALE QLD 4123
[REFERRAL AGENCIES _. ed
Referral Agency Address : ‘ , Basis
Nil
Development Development Details : Preliminary Development
, Approval Permit
Material Change of Use Multiple Housing Type 2 Duplex No Yes

   

   

IN DETAILS

ras AMET ie iP tte MES AR 8 UND

    

“ Council decided to approve the ‘goplication and grant a Development Permit, subject to conditions.

a8 Meh A rhe Abd PRON URGRII PARLOR RENKIN) SEERA MME AE AOAC RRS TOPE ND LR MRI ALA

“7. APPLICABLE CODES :

BONN de Aba Tok PUN Tm TE Se Amy PR RE Neate seme pach AE Pane Se cen cere Sener teed

The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-

 

Nil.
“g SUBMISSIONS _ ~ .

 

Not Applicable.

  

The 2 approval is subject to conditions. Noosa Council's conditions are attached.

   

Page 32

NOOSA COUNCIL IDAS Development Application Decision Notice 2 of 10

   

 

-perenaas ae nS pert.

10. FURTHER DEVELOPMENT PERMITS REQUIA

 

3 imme a

 

Type of Development Permit required Subject of the required Development Permit

Development Permit for Building Works All Building Works
Development Permit for Operational Works Landscaping, Access and Carparking, Stormwater Drainage,

Frontage Works and Erosion & Sediment Control

 

 

(CE RESO hat = pares eect eee eh Pe

> 44. RIGHTS OF APPEAL

Reece 6 rem are Ee RRP Tree Te sc Lt ap

So

Rights of appeat in relation to this application are attached.

 

ASSESSMENT MANAGER t

Se mR Le NE eee ra

Name: Noosa Council Signature: Tray Orta Date: 9 August 2007

    
 

 

MG j\datawrks\wrkcache\1417946\d1544decnotice 153171.doc

Page 33

NOOSA COUNCIL IDAS Development Apptication Decision Notice 3 of 10

 

 

Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

 

Land Use

1.

10.

11.

Development undertaken in accordance with this approval must generally comply with the approved plans
af development. The approved plans are titled and numbered Floor Plans 07-3646 Sheet 1, Issue D1;
Plarn/Section 07-3646 Sheet 2, Issue D; Roof Plans 07-3646, Sheet 3, [ssue D; Elevations 07-3646 Sheet
4, Issue D and 3D Views 07-3646 Sheet 5, Issue D; prepared by Burleigh Design and Drafting and dated
13 June 2007 and as may be amended by these conditions.

Prior to the issue of Operational Works approval, amended architectural. plans shall be submitted
demonstrating compliance with site cover requirements of 40% and building height (2 storeys and 8
metres). In relation to building height, the area between the kitchen and work area above (floor to ceiling
height) shalt not exceed 5 metres and the central dividing wall located at the.rear of the building shall be
reduced in height to not exceed 8 metres above natural ground level.

The development must be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
emissions.

The open space and setback areas are to be landscaped in accordance with Council's Policy on
Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably qualified
Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises being
occupied and maintained at all times thereafter. The landscape plans required to be submitted are to
denote areas of existing vegetation or existing trees proposed or required to be retained and shalt
include:-

4.1 the provision of screen planting along the site's front (eastern) boundary;

4.2 the provision of dense screen planting, including at least 2 x 400 Litre pot size (per side) along the
site’s northern and southern boundaries to protect the privacy of adjoining premises, and

4.3 the provision of two street trees in the road reserve in front of the site.

Existing trees on the site and within road reserves are to be retained, except where required to be
removed due to building operations or the conduct of the approved use.

All fencing shall be setback at least 1 metre from the front property boundary, with at least half of the
fencing setback 2 metres. The area of land between the fence and the front property boundary shall be
densely landscaped to screen any fencing from the street.

The development shall not exceed a maximum building height of 2 storeys and 8 metres above natural
ground level.

A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged
with Council at completion of work confirming compliance with the maximum allowable building height as
required by either the conditions of approval or the Planning Scheme.

Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like, thus remaining
as open structures.

All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
(LPG or natural).

The proposed development shall have all kitchen, laundry and bathroom fittings that comply with the AAA
Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating
and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), with toilets to
comply with the AAAA Water Conservation Rating System. Ali tap ware and shower roses shall not
exceed a maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from this
requirement..

"MG jAdatawrks\wrkcache\141 7946\d1544decnotice 15317 1.doc

 

Page 34

NOOSA COUNCIL IDAS Development Application Decision Notice 40f 10

12.

13.

14.

15.

Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted,
to secure performance of all conditions of this approval, prior to the issue of a Development Permit for
Operational Works. The cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing performance of this
permit.

The requirements of this development approval are to be effected, prior to the use of the premises.
Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect
compliance with conditions.

The Development Permit for a material change of use of premises lapses if the use has not happened by
9 August 2011, unless an application to extend the currency is approved by Council.

The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to
obtaining a Development Permit for Building Works.

Land Development

Vehicle Access

16.

17.

18.

19.

A vehicular access driveway shall be constructed from the Grant Street frontage of the site with a
maximum width of 4.5m.

The driveway shall be designed and constructed to Council’s design standards and to grades that prevent
vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath
without any step or level difference. Should any driveways be constructed to grades that do not comply
with AS2890.1-2004 Council wilt require that the driveway be removed and reconstructed to levels that do
comply.

To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath, the

‘driveway and any associated fencing or vegetation near the driveway shall comply with the minimum sight

line requirements as defined in AS2890.1, section 3.2.4. The applicant shall demonstrate compliance by
illustrating these sight lines on the plans submitted for both Operational Works approval and Building
Works approval. .

All vehicles shail enter and leave the site in a forward direction.

Car Parking

20,

21,

22.

Carparking shall be provided within the site as shown on drawing number 07-3646 dated 31/01/07 by
Burleigh Design Drafting except as modified herein.

A minimum of 3 car parking spaces shall be provided on-site, with at least one space being available for
visitor parking.

The carparking area shall be designed to comply with the provisions of AS 2890,1-2004 for user class 1A
with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head
clearance (headroom) at any point of 2.2m.

Frontage Works

23.

24.

Footpath improvements such as topsoiling, grassing, and tree planting are required to the Grant Street
frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines.

A new 1.5m wide concrete path shail be constructed from the Grant Street kerb to the proposed front gate
of the site in accordance with Council's design standards and to an alignment that protects any significant
vegetation or any underground services.

MG j:\datawrks\wrkcache\1 417946\d1 544decnotice153171.doc

 

Page 35

NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 10

Roof Water & Stormwater Drainage

25. Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum
storage 5000 litres per dwelling) that is installed to ensure water from the tank is used for external uses
(such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools,
outdoor cleaning, etc) and for use in flushing of toilets internal to the dwelling. All rainwater tanks are to be
designed and installed in accordance with the Queensland Development Code (QDC), Part 25 —~
Rainwater Tanks, and shall be part of the plumbing application in conjunction with the building approval.
The location and capacity of the tanks shall be clearly shown on the plans submitted for Building Works /
Operational Works approval and any overflow shall be directed to the stormwater drainage system located
at the rear of the site.

All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater
drainage permitted to drain from the site shall be discharged to Council's existing drainage structure at the
rear of the site.

Sewer Mains

26, The site shall be connected to Council’s existing sewerage reticulation system that traverses the site at
the rear of the site and be constructed in accordance with Council's standards and requirements at no
cost to Council.

To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk of
damage no structures requiring a building permit (eg. buildings, swimming pools, retaining walls
exceeding 1m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’ (taken as
the area within a 45-degree angle measured from the invert of the sewer main to the finished surface
level) or within 1.5m of the centretine of the sewer main, whichever is the greater.

27. — Any landscaping or trees planting on or near the existing sewer and drainage easements at the rear of the
site shall take into consideration the recommendations of PSP 03 - Item 22 in relation to Planting in
Vicinity of Sewers and Manholes.

Town Water Supply

28. The site shall be connected to Council's existing town water supply and be constructed in accordance with
Council's standards and requirements at no cost to Council,

29. Each individual water connection to the water reticulation system shall extend to the property boundary
and be metered. All fees for the supply of water meters shall be paid to the Council.

30. All water meters must be located outside the property boundary and in an easily assessable !ocation to
facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
fences or locked gates. In this regard approval of the water meter configuration and location must be
obtained from Council's Water & Sewerage Capital Works Manager prior to lodgement and approval of
hydraulic drawings.

Earthworks

31. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or

. structures that border the development site. Fences that are affected shall be replaced prior to the
Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shall be
clearly shown on the plans submitted for Operational Works approval.

Erosion and Sediment Control!

32. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
waste, will be necessary.

In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.

MG j\datawrks\wrkcache\1417946\d1544decnotice 15317 1.doc

 

Page 36

NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 10

Contributions Towards Council Infrastructure

33. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
amounts under the current Council policies and requirements is outlined in the table betow:

 

 

 

 

 

 

 

 

 

 

Contribution Required For: < . [Amount: °
PSP12 — Public Open Space Contributions (Park) . $1,352
PSP16 — Sewerage Headworks Contributions . $1,234
PSP17 — Water Supply Headworks Contributions $1,833
PSP20 — Pathway Trunk Network Contributions : $972
$5,391
TOTAL Contribution Amount =
Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
from June 2007 until the date of payment.

 

 

All contributions must be paid prior to the issue of a Development Permit for Operational Works

General

34, | Any damage caused to any public utility during the course of construction shall be repaired to Council's
standards and at no cost to Council.

35. Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.

36. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.

Environmental Health

37. | The developer must provide waste storage and disposal facilities in accordance with Planning Scheme
Policy “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, including an
external imperviously paved area correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties.

38. Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool pumps etc)
shall comply with the following requirements:

39. The equipment shall be installed and located in a manner that prevents excessive noise in
accordance with Council’s Local Law No. 12 - Contro! of Nuisances. Infringement Notices (on-
the-spot fines) may apply for offences.

40. A person must not use equipment on any day if it makes or causes noise to be made:

41. From 10pm to 7am: More than the lower of either —

. 40 dB(A)

3 dB(A) above the background noise level

42. From 7am to 7pm: More than the tower of either —

° 50 dB(A)

. 5 dB(A) above the background noise level
43. From 7pm to 10pm: More than 3 dB(A) above the background noise !evel.
44. Pool pumps must not be audible at an effected premises between 10pm-7am.

MG j:\datawrks\wrkcache\1 417946\d1544decnotice 15317 1.doc

 

Page 37

NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 10

45. Submission of written certification from a suitably qualified person confirming that the noise levels
comply when measured at either the residential boundary or outside the most exposed part of an
affected building, whichever is the closest to the equipment. This is required immediately after
installation of the equipment and prior to any occupation of the building, and in a format approved
by Council. This assessment must take into account noise from ali fixed equipment on the
property e.g. swimming pool pump, heating equipment, that may increase the overall noise level
emitted.

Note: it is recommended that the consultant that will be engaged to certify the noise levels of mechanical
equipment is asked to comment on the position and installation of equipment at the plan design stage,
this way noise problems can be minimised or avoided cost effectively:

46. Noise from residential building works shall comply with the following —
47. Limited to between 7:00am to 6:30pm Monday to Saturday.
48. All reasonable measures are taken to minimise noise emissions.

49. Not permitted on Sunday or public holidays.

MG j:\datawrks\wrkcache\1417946\d1 544decnotice 153171.doc

 

Page 38

NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 10

 

aa IN(@l@Ny3@ Local Laws, Policies & State
MOMESSENSIA = Regulation Requirements

INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

 

THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM

 

 

 

 

 

 

 

 

 

CONDITIONS OF APPROVAL
1. The applicant is advised that development contributions and infrastructure charges applicable to this
development approval have been based on the following Uses Class/ Uses and applicable quantities:-
Existing Development | o of, : ae Approved: Development
Existing Use Class-t:; . Existing aur antity “Approved Use Classi | . Approved Quantity
Vacant Land (one Multiple Housing - Type .
Detached House Dwelling allocation) 2 - Duplex 2x 2 Bedroom Units
2. The applicant is informed that approval of this development application will trigger an Infrastructure

Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated
amount of $3,747 and is subject to variations in the Consumer Price Index, All Groups Brisbane from
June 2007 until the date of payment. An Infrastructure Charge Notice will be issued in accordance with
Chapter 5 of the Integrated Planning Act 1997.

3. The applicant is informed that payment via credit card transaction will not be an acceptable method of
payment: for development contributions conditioned in this permit or for infrastructure charge notices
issued separately.

4. The applicant is advised that a Compliance Permit for all plumbing and drainage works within the
boundaries of the development site shall be obtained from Council's Plumbing Services Section prior to
obtaining a Development Permit for Building Works.

5. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of
operational works exceeds $80,000, then a portable fong service leave levy is required to be paid. In
accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the
Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the
requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational
works must be submitted to Council with the lodgement of any application for operational works over the
site.

6. The development should be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions in accordance
with the nuisance provisions of the Environmental Protection Regulation 1998 or Council's Local Law No.
12 ~ Control of Nuisances.

7. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement,
concrete, builder's waste or rubbish should not be permitted to enter or be placed where it could
reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot
fines apply for such offences.

MG jf \datawrks\wrkcache\1417946\d 1544decnotice 153171,.doc

 

Page 39

NOOSA COUNCIL !DAS Development Application Decision Notice

9 of 10

 

 

COUNCIL

IWele@Syse Appeal Rights

 

    

,The following is an extract from the integrated:
Planning Act(Chapter4),
Division 8 - Appeals to court relating to
development applications

Appeals by applicants ©

4.1.27.(1) An applicant for a development application
May appeal to the court against any of the following-

(a) the refusal, or the refusal. in part; of a
development application;

(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.6;

{c) the decision to give a preliminary approval when a
development permit was applied for;

(d) the length of a currency period;
(e) a deemed refusal.

{2) An appeal! under subsection (1)(a) to (d) must
be started within 20 business days (the “applicant's
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant.

(3) An appeal under subsection (1)(e) may be
started at any time after the last day a decision-on the
matter should have been made.

Appeals by submitters

4.1.28.(1) A submitter for a development application
may appeal to the court about-

(a) the giving of a development approval, including
any conditions (er lack of conditions) or other
provisions of the approval; or

(b) the length of a currency period for the approval.

(2) The appeal must be started within 20 business
days (the “submitters appeal period”) after the day
the decision notice or negotiated decision notice is
given to the submitter.

(3) If a person withdraws a submission before the
application is decided, the person may not appeal the
decision.

(4) If an application involves both impact
assessment and code assessment, appeal rights for
submitters are available only for the part of the
application involving impact assessment.

(5) If an application is processed under section
6.1.28(2), appeal rights for submitters for the
application ‘are available only for the aspects of the
development that would have required public
Notification under the repealed Act.

* Section 3.1.6 (Preliminary approval may override local ptanning
instrument)

MG j:\datawrks\wrkcache\1417946\d1544decnotice153171.doc

INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

(6) \f an application involves assessment against
a concurrence agency code, appeal rights for
submitters for the application are not available
against the part of the approva! that represents the
concurrence agency's response for the code.

Appeals by advice agency submitters

4.1.29.(1) An advice agency may, within the limits of
its jurisdiction, appeal to the court about the giving of
a development approval for a development
application if-

(a) the development application involves impact
assessment; and

. (b) the advice agency told the applicant and the

assessment manager to treat its response to the
application as a submission for an appeal.

(2) The appeal must be started within 20 business
days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
submitter.

Appeals for matters arising after approval given
{co-respondents)

4.1.30.(1) For a development approval given for a
development application, a person to whom any of
the following notices have been given may appeal to
the court against the decision in the notice-

(a) a notice giving a decision on a request for
extension of the currency period for an approval;

({b) a notice giving a decision on a request to make a
minor change to an approval.

(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.

(3) Subsection (1)(a) does not apply if the
approval resulted from a development application
(superseded planning scheme) that was assessed as
if it were an application under a superseded planning
scheme.

(4) Also, a person who has made a request
mentioned in subsection (1) may appeal to the court
against a deemed refusal of the request.

(5) An appeal under subsection (4) may be
started at any time after the last day the decision on
the matter should have been made.

Division 9 - Appeals to court about other matters

Appeals for matters arising after approval given
(no co-respondents)

4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-

(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.

Page 40

NOOSA COUNCIL IDAS Development Application Decision Notice

(b) a notice under section 6.1.44? giving a decision to
change or cancel a condition of a development
approval. .

(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.

(3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.

(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.

Appeals against decisions to change approval
conditions under the repealed Act

4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repeated Act may
appeal to the court against-

(a) the decision; or
({b) a deemed refusal of the application.

(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.

(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.

Appeals against local laws

4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.

(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.

? Section 6.1.44 (Conditions may be changed or cancelled by
assessment managef of concurrence agency in certain
circumstances)

MG j:\datawrks\wrkcache\1417946\d 1544decnatice 153171.doc

Page 41

NOOSA SHIRE COUNCIL,
PLANS APPROVED

ure

 
 

Ketes
Maipia Houcing Type 2 Diet

Buldding Height - 2 Storays and Mix 80m High
‘{ Canered Carepace par Unit
1

    

 

 

 

 

 

 

 

 

 

 

 

i
i

 

 

ei
O

RAST Reek FS
Unit 1 Rest Foor
Unit2 Firt Foor

 

Lat No, R

‘&P No. 179873
Arca of bot int

Pattsh of ‘WEYBA
‘County of MARCH

       
     

 

 

E

 

 

 

o
D
. O
O
Oi

OOOGondoo
i
e

525520" 33.141

52° S520" 33711

Site coverage «268.53 (39.96%)
Total GFA MDATMP (4457%)

Feed Kates

(Geen FA's da not nominate fod iva.
of habla morne to he datareined
bby ung food oval ecards torn council
cr talecant catiyng mabey.

(Norn FPL rata to mint pretty
FFL b hited gond oat
Fad inal bbe torn coreying

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

main wets pyalcbia. Procaure not ts excend S00 kPa,

or
+] dufiding with 1 oF ? bodroome the betwaler

bag OK! be eifiie ts receive at inext 14
fenenratie energy coticeies

 

 

‘eter

 

UD STI 19.926

 

  
 

 

 

GROUKR Figen GFA
Unit Ground Floor siciet |

 

 

 

: nt Ra
GRANT STREET wnt Gredres _j ten GRANT STREET

 

 

 

 

 

wernt
FLOOR PLAKS

cane

GROUND FLOOR PLAN FIRST FLOOR PLAN ME & MBS TODD

 

 

"PROPOSED DUPLEX
LOT 11 GRANT STREET
NOOSA HEADS

4 Sheet 10F6
Sawing Neo 01-3646

 

 

 

 

Page 42

NOOSA SHIRE COUNCIL
PLANS APPROVED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|
Bh ne |
i cee aa | te
muna wll | re
Level r 1 ay Sarege Floor Level
Ef me) ms nage 7 = —Titteway Cate
+ T ate Store | . Compacted FI |
? | tounge cromo Kitchen 7 Foote
oor Level a | wes) ee
.
| 4 — — rey \
el "yun foxy | i | SECTION A-A
an ted ol re .
Ini sO
Unit $ wre pevnen saan)
Dn on 2
‘Bed Bah bon [est
e Stair wold wou
weld fates =

 

 

 

 

 

 

 

 

 

emer er eae
as_| as |

Ai work shall comply wth rokoverd Australien,
‘Bearedards ane Local Government By Laves,
‘Al. Smoralota to be chacknd an aa Prior to
ceamrmennament of work,
Da net Seat from drawings. Use figured
‘erwerrstons ory,

. ‘Theas plans may nat bo copled In whole
partwthou the witen peredalon of

a BURLEIGH DESIGN DRAFTING,

 

 

DESIGN WIND VELOCITY [ ‘

 

TERRAIN CATEGORY |

 

 

 

‘SECOND LOGE GFA
Unk { Second Reor 33.280"
Unit 2 Secand Floor 3320?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| "BRAN / SECTION

 

GRANT STREET — MR & MRS TODD

"PROPOSED DUPLEX
LOT tf GRANT STREET
NOOSA HERDS

 

 

 

 

SECOND FLOOR PLAN | I

 

a 01-3646

Page 43

 

 

 

FIRST FLOOR ROOF PLAN

}

+

feectes and capping

----------+-------4

       

taxcian ord capping

i

Ai

t
!
4
t
t
t
1
1
!
'
i
1
\
!
1
t
J

SECOND FLOOR ROOF PLAN

NOOSA SHIRE COUNCIL

PLANS APPROVE

D

SIGNATURE: eed tracy,
DATE: onl Prat Woe)...

~

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOT FOR CONSTRUCT

 

 

 

‘AX armemalone to be checked on ste Prior te

o
whocd the wehten perrieaton of .

 

 

TERRAIN CATEGORY

 

 

 

Beare
ROOF PLANS
aiat

 

 

MR a BRS TODD

 

“PROPOSED DUPLEX
107 ti GRANT STREET
AOOSA HEADS

 

 

Sheet 3oré

 

 

Orawring No. 07-3646

Page 44

_ - NOOSA SHIRE COUNCIL
PLANS APPROVED

SIGNATURE: Drtuparfunr..
DATE: cou Paguak 106]

 

 

 

 

 

NORTH WEST ELEVATION

 

 

 

 

 

 

 

 

 

 

 

      

 

 

. ene GOW Comregatod moat ahaeting
fess end door xo & Cetabend pty tn ev cpg
CCobrbond puters, fess and capptog » 7 : ‘Scloct rendered frieh to eter wa cad

Feature Honed Polished biockwork to dea boda watie

XR Comugated shes recfing Uaeere ie pn

°
igs
\
o

 

een fra
dourary ire

 

 

 

 

 

een nS
EES

 

 

 

 

 

 

 

 

 

 

 

uteatnggt nto, — oley, Serene = =— Sf SEES a ee Soe it —-- Aomblagit sata
a eee “i . siete ‘Brn hlegh setback “Toase plore may not be cctied ih whale or
Roan ee te part whhout the writen parrrtasion of
\ oat aia = ripen BURLEIGH DESIGN DRAFTING.
( a i e a
sagt Rona — mt pts)
Af ie fe a : Gearire ee! doo DESIGN WIND VELOCITY | a
| marae a F + ‘Aurion tare’ : TERRAIN cATEGORY | tH
3 i Aa Pest
| Gite eee : St Fate : SOA NITHORE os
S reer & see om
: Shatin aac fom yy
nS QBSA No 08544
wr oe Pe H Haw Ortvaseny Entry Levet (UNDLIGHT HOLDINGS PTY, LTD, ACN (00 082 772
ec i
4 oe a Rea Exit Ground Level
sis : : Sdlect tore dating ver
04450 bck ers
Aurbim bared
Exiting Ground Level ‘Giese batestracta Estaing Ground Laval

 

 

SOUTH WEST ELEVATION “wmawns Toon
SOUTH EAST ELEVATION seat

LOT 11 GRANT STREET
WCOSA READS
Sheet 40F6

Sreng No. 07-3646

 

 

 

 

 

Page 45

90 1632 90 1908.90 Timber Floor Joieta
@ 450 cis to Eng. Details

240,, 1450 100
tT Tt | Steal RHS to Eng, Details

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

           

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

“Tp
15380 re Ae ot
: . ee — at
8 . ie 1060, 1910 4650 140, 4650 1910, 1060 ey Ss oH e
3000 Litre ~ ~~ 3 2 Too | Fe se — s g =
— — 3000 Litre 3 _—
Under Water nk aoo'ss0" 18.924 ~~ oo ister ane a f 1690 ‘s 490 ____ 14a 4400 2 1690 it 2020 ! IF zs i he
: + TT — = ~— 250, 1660 | 350 4300140 4300 360, | 1660 250 ele 4} -
2 18 Na | 9 z PVC Stormwater Ppa = g ~ ~~ 5/8 = | | 0 s
3 3 g |“ Eng. Details : ~~ SF = 250 3710 2600140 2600 3710 130}, 1120 brick pier winwiz —7 300, | 1320 [ff 1810 _|0
- Easement, see SP179879 120 ft 2560130. 1150 2600 oir 2600 1150 130 2560 ! redo "
Easement, see SP179879 +~— 1492 I (AN , { M492 4004100 HWO Post
\o1/ | To s + 2
3 3 [100100 HAND Post w07 an yoo = Z| = | DIECIK
3 r wo Oe ne ne es 2 = s
L Codes of Reference 4 a= oS a e “Beek BRINIVI ll Ne
= - £ “ 1 B AS 10042 Part? Non evelonic areas = ee lomge omnes | Ase) s = % *
- 1 _- . 2 o Ss o - eee ane Soy di 2 OME ee ee
~ 1 1_ fe ~~ ' : ey * 8 S| S a S| RL 1381 -d05 fL - S
| | . & a 2 pe ROSS * =
e | 8 a 3 ! $ = gs s wu  fVd02 ~ eo e sf
ot aa 2 — €---4---4 Property Description ° = 38
“ L | RLA3913) + Ie perty P a = Unit 2 2
SH ae [RL 13.913) a tb dion tag Betaig  LOt No. 12 a | * Unit 1 a4 Dining +t <8
N I ™ SP No. 179879 2 = Dining a =
iB Area of lot 672m? Be) 3 r— wo z
Bp MM ee ~~ Parish of WEYBA — ~ Zz FE s a
a County of MARCH a g > * = BI
. =| & s & 0 =. 0 Zl a
JCStormwater Pipe | Site coverage 267.85m*? ( 39.86% ) S| a ~ 5 Kueh o + 8
Hydraulics Eng. Detail “1 «© \ - : — = _
Eno, Dota — o \ Se = st & = B * s
= — D/ IN & ™ =
BB 4 “ Ss * 3 Q @ HH? I= 4
~ MA y =
E|R . C4 z | *
- lo — Bis =
MS | tO s Ss 260 o o S
= — = 5 S| = .
RL 19.413] |. ~ & iS 4196__s5|| er) _aars = Note:
+ fe eee2 i s = All Bracing, Tiedown, Concrete footings,
Ss s Concrete Slabs, Structural Timber &
3 ~ = Structural Steel to Engineers Specifications
~ 4 2 and Details
= = (BN (BY xs “ Co en)
aR S — , REVISION ISSUE No.
~---- ak &  \oL/ \OV/ S = "22 | SEPTOT PRELIMINARY PLANS 1
fe _ = 20 | SEPT.07 [PRELIMINARY PLANS 2
~~ 3 26 | SEPT.07 |Co-ordinated with Hydraulics Plans 3
Flood Notes LRN
Given FFL's do not nominate flood level. oY
RL of habitable rooms to be determined NOT FOR CONSTRUCTION
‘ Orrelevantcertving author. et [ator
= Beefitae ~~ 7 T a “ 130 3750140 3750130) 1492 mee ns
oe : . Nominated FFL relates to minimum proximity
* : ; 5 . 1097 2680 1 68090 1 / :
055) (2 of FFL to finished ground level. " my 2681 02 . a Stavderds and Lord Gevemerert or Laws
*Sy- o Flood level to be obtained from certifying 3345 3345 ales iors
, r —— —— B authority unless otherwise stated. comencerent of were nn On site Prior to
=; = y 1901 1430 140 430 190 sment of work
" " Do not Scale from drawings. Use figured
190| 4690 140 4690 190} mensions only
—_ — 2 . TT . These plans may not be copied in whole or
__---K 4 --- fgg - Na ee + ---  o-- _ Energy Efficiency 190), 3360140) 3360_———190) part wihout the writen permieaion of
TT 5 3
1 = és - | hotndlinnnae «the build 2740 1330 3690 3550 1330 2740
19.924m [RL18.746] [2 . ® OF total intemal Noor area of the duilding, DESIGN WIND VELOCITY u2
_ £246 including an associated garage, shall be 15380
, tenn 4 me illuminated with fluorescent or compact TERRAIN CATEGORY A)
. : ‘onsen GROUND FLOOR PLAN fearStecona | ET
“e @. edge of bitumen cy 4000 %, oosa ire Ounci rconatan ee
‘@ ‘S ” % . *
PLUMBING FIXTURES: OBSA, No. 085414
G R A N T S$ T R E E T -Ail shower roses to be 3 star rated or AAA. LINDLIGHT HOLDINGS PTY. LTD. ACN O10 852 212
nt Te neni a -Pressure limiting devices to be fitted where S burleigh design
e g 53 g s mcten ot ete main water available. Pressure not to exceed 500 kPa. Termite Protection Ground Fir Area's m? 7
"s bitumen formation —_—_=> -Toilets to be duel flush with max 6 litre full flush . Pre eT BST eee OLD 4215
z 3 and 3 litres on half flush. The supply of stainless steel mesh by Termi-Mesh UNIT 1 Fax : (07) 5591 2188
\ 3 » Xe 5 Hot water system to be one of the following: to be installed to manufacturers specifications by an 01 Ground Floor Area §2.41 SHEET TITLE
e °% tane marking s ’ i ician. i i
Bement ie USL en EEE MB hc a 19 (A) Five star gas hot water system. accredited technician, in accordance with the current 02 Ground Floor Deck 15.58 SITE PLAN
3 20 — ~~; TT tsa 3 (B) Either a heat pump or solar hot water system where:- AS 3660 and B.C.A. 3.1.3.1. Maintain 75mm clearance 68.00 CUENT
a ae (i) in a building with 3 or more bedrooms, the hot to external paving below all weep holes. UNIT 2
24 et _ water system must be eligible to receive at least Final perimeter spray recommended 01 Ground Floor Area 52.41 MR a. MRS TODD
—S xs 294 22 renewable energy certificates; or - - 02 Ground Floor Deck 15.58 PROMS
eo _ > na a (ii) in a building with 1 or 2 bedrooms the hot water Stairs Calculations 68.00 PROPOSED DUPLEX
? 3 2 ge of bitumen . 3 system must be eligible to receive at least 14 START RISERS GOINGS [ANDINGS/] 2R-+6 136.00 oT ne FT
x 8 renewabie ene: rtificat RANT STR
"ay cermncates (rm) [(No) | (mmm) [(No) | WINDERS
' 178.89 | 9 250 {6 2 Winders | 608 NOOSA HEADS
SITE PLAN vo125/8 | 20 (6 [1 winter | 572.20 Sheet 10F8
185.71] 14 | 250 [41 | 2 Landings [ 621.42 Drawing No.
(4) | 14.29]7 J 250 |e 618.58 e 07-3646

 

 

 

 

 

 

 

 

 

 

 

Page 46

 

322°55'20” 19.924m

 

CO 15T&20CW RUNS! IN WALL TO SERVE B'S

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

  

 

  

 

  

 

 

  

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

  

 

      

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

       

 

 

 

      

 

    

 

 

 

 

 

 

 

 

 

 

 

   

 

 

          

 

 

 

 

 

 

 

 

 

 

   

 

 

    
      

 

 

 

          
       

 

 

 

 

 

 

 

 

 

 

     

   

 

 

 

 

 

        

         

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

          

 

  

 

 
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

"wal TOSEREBS— SM DHAEST DROPS |IN WALL TO SERVE TW
15T&20CW RUNS INI WALL TO SERVE B'S ne UTE
20H&CW DROPS IN 105] Tv SHR
AND ENSUITE BTH5 B 1STWY UNDER VANITY AT
Deck Bone ENSUITE. FIXTURES
{STW CONCEALED QNDER VANITY: AT-
HIGH LEVEL TO f 1STRCW DROPSN WALL TO SERVE BTH
15T&CW DROPS IN BALL TO SERVE BTH t RY FORGERY RUNIN CA
20H,C&RW RUN IN Bed] Wal. PIPEWORK we CA
PIPEWORK ca At she ee
RHC IN WALK WN RCTS et 7 1 TO SERVE WC
15RW DROPS IN CI / © cA
» aS aN
20H,CARW RUN IN ; = CARW DROPS
Void fs t Voi COE 20H, ¢ DROPS
20H,CARW DROPS co Woid REFER 30 GROUND
AND RUNS IN WALL
BELOW. REFER TO GROUND. ———
FLOOR PLAN FOR CONTINUATION
1SCW RUNS IN WALL TO ad wt 8
1SRW RISES (N WALL TO
ABOVE TO SERVE WC AND 1 FROM
DROPS IN WALL TO SERVE Wil
20HW RUNS 15T&CW
TUB AND TO
aor LEV POWDER ROOM
AND UPSTARH BATHROOM FIGURES TO SERVE up
ISTRCW RUNS WN WAL TEESE Gs | =
oun} ( Dn r Void
PIPEWORK Void |If\on
15RW
4 = Garage
\ ( Store Garage Unit 2
RISES ON WALL | . RL_18.038) ni
i \a ABOVE | Unit 1 fe +
-HWU TO'BE 310L RHEEM HEAT . _. PO? “a
Un ifaey Wo. 581310 og | Visitor oe Nv Visitor
» | a NX vd | “N CTE]
\—REFER TO GROUND FLOOR PLAN SO IIL ~ -
FOR CONTNUATION OF SERVCES|| = td RIES] a
L _ + 4 ~
FIRST FLOOR PLAN SECOND FLOOR PLAN
SCALE 1:100 SCALE 1:100
© eR Concrete Oriveway L| 3 3 3
rl § - 7
18 A__| PLUMBING & DRAINAGE APPROVAL| 7777
. ERAL NOT WATER MANAGEMENT SYSTEM: Se T sumer oe
18 GENERAL NOTES: 1, ALL WC PANS SHALL BE FITTED WITH A 6/3 LITRE DUAL FLUSH TYPE CISTERN AND PAN (MAXIMUM). AMENDMENTS
I 1. _ 2. ALL TAPWARE OUTLETS TO BE FITTED WITH FLOW CONTROL REGULATORS WITH THE FOLLOWING PROJECT
19 — | "PUAING AND ORIAAGE ACT 2002, PUMON AND DRARAGE REGULATON 2005, FLOW RATES: SINK 9 LIT/MIN. SHOWER 9 UT/MIN. BASIN 6 LIT/WIN. TUB 9 LIT/MMN. LOT 12 ON SP179879
___|CREHC(NON POTAE a ee YY — STANDARD PLMBNG AIO ORARACE REGULATION 2005, BULONG MCT MMENDMENT ACT 1891,
_—— ° : , 5 . BUILDING AUSTRALIA, AS 3500, LOCAL AUTHORITY REGULATIONS. .
zs a : 5 BULDNG CODE OF AIST AS 500, LOL LEGEND: seme sons COUNTY OF MARCH
5B ORL 142°55°20" 19.924m 25s 5. THESE DRUMINGS TO GE RED BY CONUNCION WH THe ARCHITECTS, ENGINEERS AND LANDSCAPE Sw EXISTING STORMWATER PARISH OF WEYBA
#83 2 § ety CONSULTANTS DRAWINGS AND SPECIFICATIONS R RAINWATER REUSE 15 GRANT STREET
% % 5 os 4, CONTRACTOR TO VERIFY ALL SURFACE LEVELS, INVERT LEVELS AND COVER OVER WASTE DRAINAGE LINES ————_ Sewer
= “ =} = ter oien Fj Pe ARE, CORRECT AND OBTANABLE BEFORE COMMENCEMENT OF WORK ON SITE — —— —_ STORMWATER NOOSA HEADS
419. 5. LOCATIONS OF EXISTING SERVICES ON SITE ARE ONLY APPROXIMATE AND HAVE NOT BEEN VERIFIED —-— —-___ COLD WATER ARCHITECT
% % eae of bitumen , ‘ee, THE CONTRACTOR SHALL VERIFY LOCATIONS OF SERVICES BEFORE COMMENCEMENT OF WORK. ——..———_ HOT WATER
; AL PES LAD UME U8 BE MAIMUM DEPTH OF 400mm TO VERT LEVEL AND SHALL BE 100mm ven AER wou : es ms rm vd nafth 882 22
GC R A \ qT S i KOE E | DMAUN  EEIEEIE EEE OOO SOP VALVE bur!
8 ~ 2 s S im mated 8. DO NOT SCALE FROM MINI CISTERN STOP VALVE P.O. Box 217, CHIRN PARK, QLD 4215
2 & = 2 3 son ot vate : ————>————__ CHECK VALVE
zfs eet SANITARY PLUMBING, DRAINAGE AND STORMWATER: (_eeeuere
“3 1. ALL ORANAGE SHALL BE 100mm DIA UPVC RUN AT MINIMUM GRADE OF 1:60 U.N.O. . a
a fy e, 5 2, ALL VENT PIPES TO TERMINATE IN ACCORDANCE WITH AS 3500. ABBREVIATIONS: sweet design
g —, = 3 AL L0°S UNDER CONCRETE TO BE TEN TO SURFACE LEVEL AND FIED WT APPROVED BRASS SCREW CAP. AFL ABOVE FINISHED FLOOR LEVEL innovations
Se ee 4, ALL FWG'S SHALL HAVE 100mm DIA RISERS AND REMOVABLE METAL SCREW GRATES CHROME PLATED WHERE EXPOSED.
7 x sghotien of bank eI 9 5, WHERE PVC PIPES PENETRATE OR ARE BUILT INTO WALLS OR SLABS THE PIPES SHALL BE LAGGED B BASIN LL INVERT LEVEL
2 2 = id 90 WITH APPROVED MATERIAL IN ACCORDANCE WITH AS 3500. BTH BATH 10 INSPECTION OPENING INNOVATIVE HYDRAULIC SERVICES DESIGN. ABN 75 662 887 875
1 stone pitched 6. MATERIALS: c COLD 10S INSPECTION OPENING TO SURFACE UNIT 4/9 SILKWOOD STREET,
STORMWATER, WASTE AND VENT PIPES AND FITTINGS: UPVC CLASS 'SN6’ SMOOTH WALL PPE TO AS 1260 CB CEILING BELOW JU JUMP UP ALGESTER, QUEENSLAND 4115
° aa 54 FITTED WITH FIRESTOP COLLARS WHERE REQUIRED. CA CEILING ABOVE NP NON POTABLE PHONE — (07) 3276 1996
s » ae i oi HOUSE ORANAGE: UPVC CLASS ‘SN6’ SMOOTH WALL PIPE TO AS 1260 CW COLD WATER NPW NON POTABLE WATER [email protected]
$ » 2 eae of ben " ; zat He oe SOREN FXED TO FLOOR WITH NYLON Cuene Ture Se CWR COLD WATER RISER ORG OVERFLOW RELIEF GULLY CuENT
° 5 ® 3 INCLUDING SHALL op DOWN PIPE PLV PRESSURE Lai NE MR&MRS TODD
. R RW RAIN WATER (REUSE) UNTREATED
SITE/GROUND FLOOR PLAN HOT AND COLD WATER: BASING yO
SCALE 1:100 1, PIPES LOCATED IN MASONRY WALLS TO BE INSULATED KEMLAG TUBE OR CONDUITED REHAU OR SIMILAR APPROVED. FFL FINISHED FLOOR LEVEL SHR SHOWER
2. LOCATIONS OF CONTROL VALVES ARE SHOWN DIAGRAMMATICALLY ONLY. LOCATE ON SITE FGL FINISHED GROUND LEVEL SL SURFACE LEVEL ™E
IN ACCESSIBLE POSITIONS. FSL FINISHED SURFACE LEVEL SS STAINLESS STEEL WATER SERVICES
3. HOT AND COLD WATER PIPEWORK IS SHOWN DIAGRAMMATICALLY ONLY. FU FIXTURE UNITS sv STOP VALVE
4. ALL HOT AND COLD WATER LINES TO INDMIDUAL FIXTURES TO BE MINMUM 15mm DIA AND 20mm FW FLOOR WASTE SW STORM WATER RETICULATION, GENERAL
JO TWO OR MORE FIXTURES OR AS SHOWN ON THE DRAWINGS. FWG FLOOR WASTE GULLY TD TUNDISH NOTES AND DETAILS
5, HOT WATER UNITS TO BE CAPABLE OF ATTANING AND MAINTAINING TEMPERATURES IN EXCESS OF THOSE cDU GARBACE DISPOSAL UNIT TUB LAUNDRY TUB
REQURED AT THEIR PONT OF USE AND INSTALLED IN ACCORDANCE WITH RELEVANT AUSTRALIAN STANDARDS. 6S GALVANISED STEEL WV TEMPERING VALVE
8. MATERIALS: GT GREASE TRAP Ww TEPID WATER
COLD WATER SERVICE INTERNALLY: REHA CROSS LINKED HDPE TO ISO 9001 OR POLYBUTYLENE (CONDUITED Gy GROUP VENT UNO UNLESS NOTED OTHERWISE
WHERE CAST IN CONCRETE) OR COPPER TYPE 'B’ TO AS 1432 CHROME PLATED WHERE EXPOSED oe GROUP VENTED BRANCH u/G UNDERGROUND
COLD WATER SERVICE EXTERNALLY: COPPER TYPE ’B TO AS 1432 CHROME PLATED WHERE EXPOSED Ow CLASS WASHER U/S UNDERSIDE HYDRAULIC SERVICES
CEC ey CHE H HOT ( VENT ang ESERED aT
HOT/TEPID WATER SERVICE INTERNALLY: REHAU CROSS LINKED HOPE TO ISO 9001 LAGGED OR POLYBUTYLENE ,
LAGGED (CONDUITED WHERE CAST IN CONCRETE) OR COPPER TYPE ‘8’ TO AS 1432 INSULATED. HC HOSE COCK vp VENT PIPE apne SA STN SWEET_}_1121072
7. HOT WATER UNITS TO BE LOCATED IN NON-CORROSIVE SAFE TRAY WITH 50 DIA WASTES IN ACCORDANCE WITH HW HOT WATER we WATER CLOSET "293 “WS 1102
AS 3500.4 DISCHARGING AS SHOWN ON THE DRAWINGS HWU HOT WATER UNIT Wu WASHING MACHINE ISSUE DWG. No.
8. ALL HC'S SHALL BE FITTED WITH APPROVED BACKFLOW PREVENTION DEVICES Vv INSPECTION JUNCTION XLPE CROSSLINKED HIGH DENSITY POLY ETHYLENE } —_P1__ HO1
25.09.07

 

 

 

 

Page 47

 

322'55'20" _19.924m ECT
¥ . + * 0 er coy
13a 2 = AL 11.360. BUST FOL 12.260, ale

 

  

 

       

 

    

 

                

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

  

 

 

 

 

      

 

 

 

 

 

 

       

 
 
        

 

        
   

        

 

 

      

 

 

 

 

 

 

 

 

  

 

 

     

   
 

          

 

 

 

 

          

 

 

 

      

 

 

 

  

 

 

 

   

 

 

      

  

 

      

  
  

 

 

 

 

 

 

3 . Nw BN © (INFORMATION FROM COUNCIL #ECORDS) SP pn nnn nnn
i S s $30
\ LL. 11,860 ——#igll gf a
3 , D LL Deck
\toqas—9 050 ro te Au 1287 —\—
600 SQUARE ACO GRATED S/W P———Y_ AFL. 12 ——( (a tae — “p
TPE 66 Wi 8054 = ; § pe (60 SRATE S/W Pr Bed 1
EELOUARD GRATE. (MEDIAN 3 ie + — BEF CRATE (MEDIUM DUTY)
DVERTOR WATER DISCHARGES TO = ‘DIVERTOR WATER DISCHARGES TO FETA TO BE A WINMUM OF
GRATED PMT. PLEASE NOTE THAT | ~~4.__ GRATED PMT. PLEASE NOTE THAT X $30DEEP WITH 1S0DEEP
BE REMNED IN S/W PIT FOR CLEANING BE REIMAN S/W PIT FOR CLEANING eon
AD THEREFORE SHOULD BE WSTALED y | Logage ie AND THEREFORE SHOULD BE INSTALLED ewe
1 0 & ITS wl TOP OF PIT TO BE SAME HEIGHT
RAIN HARVESTING. INGROUND \— Rae
PRSTFUSH-WATER OVERTER | ee oF ‘ PRSTFLUSH WATER DVERTER el vw | ii EAVES GUTTER TO BE. SAME
DISCHARGE TO GRATED S/w mr’ 4 SH LA L + TOP. OF 8 DSUHARGE TO GRATED §/M PI
ADCENT DNERTOR, IM LONG =e a Limit 218788 FISHED eS | pecans ee
(77L._OF WATER TO BE S| alg ] Shing Blow (112. OF WATER TO BE
DIVERTED EACH RAINFALL) N =e ~ | 2 EACH RAINFALL)
OSL PER 1M2 FOR FIRST FLUSH = 15 Slo L 132001 | ost FOR FIRST FLUSH BOX GUTTER TO BE A MINIMUM OF:
Smee ~ fe fale on ee a Se
4 SSN. Sls
: 3 Sif 13 pall Kitchen 4 150 Ie |@1:100
: ! RL 15.525] Bed 2
15 = + PLAN FOR CONTINUATION
REFER TO GROUND fan Topp
3 | PLAN FOR CONTINUATION '
ie
——___ 4 3 | orch.
P TO GROUND FLOOR
PLAN FOR CONTINUATION Corage
REFER TO GROUND FLOOR REFER TO FOR g
PLAN FOR CONTINUATION CONTINUATION. OF arage Unit 2
| . RL1B.038 ni
16 —+ | sorD Unit 1 |) eo +
po. ban. Unit 11 Visitor --=4 > aa Visitor |
N 4 oN ;
s 8 | 7 Sct Le ~ |] Boe
218 | — fon Paar
2 | Lo tht 500° 1500P
2 ACO K200 CLASS 'B’ GRATED DRAN
8 |
_ FIRST FLOOR PLAN SECOND FLOOR PLAN
SCALE 1:100 SCALE 1:100

 

 

 

 

 

 

 

 

EAVES TO HAVE A
OF 4 CROSS SECTION AREA

 

 

 

 

 

 

 

 

 

 

 

 

A PLUMBING & DRAINAGE APPROVAL] 7777
ISSUE SUBJECT OATE.

 

 

 

 

 

 

 

 

LOT 12 ON SP179879

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

: I | COUNTY OF MARCH
| PARISH OF WEYBA
TT e tention” 19.924m 7802 EAVES TO HAVE A MINIMUM
Bs 142°55'20 | . Sats | / OF BS00NMME CROSS SECTON AREA AN 15 GRANT STREET
Zz on % 3 Aa, back of kerb Ry yO +00 BOX GUTTEN Gift 200MM WIDE >= NOOSA HEADS
= 419 % aaa ames S om Void TD BACK OF EAVES GUTTER ‘| esa No, 065414
NY 2 nN \ 1 ¢ T | R F FE T Box GUT se zu woe | eu SHE 1 le és | enough de PTY, LTD. ACN 010 852 22
SITE/GROUND FLOOR PLAN a ( eaememo <
SCALE 1:100 ORES ATO | ot f 2188
I> G SECOND FLOOR ROOF PLAN sweet design
YS von(N oa roe SCALE 1:100 innovations
INNOVATIVE, UNTT 4/9 SILKWOOD ‘SIR ET 887 875
@ ib nr aE re ae
We HECHT ADJUSTED ° Es GEN GE A MINIMUM OF 18000MM2 [email protected]
IT SLOPE OF CROSS SECTION AREA. CLIENT

= 130MM+SLOPE

 

MR&MRS TODD

 

BOXGUTTER

105 .
Sey 3 SCE 1:100

 

 

 

 

SANITARY PLUMBING,
DRAINAGE, STORM WATER,
AND SCHEMATICS

HYDRAULIC SERVICES

 

 

 
 

 

BOXGUTTER AND RAINHEAD DETAIL ELEVATED DRAINAGE SCHEMATICS

NOT TO SCALE NOT TO SCALE

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
3.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2024 - Op Works - Access, S_Water & Frontage [As Published].pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.