Council archive · source document
07/2024 - Op Works - Access, S/Water & Frontage [As Published] · 142007.2024
v INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 State-controlled road matters 2. The application involves: (tick applicable box/es) For mare information refer to Guide 3. CA development on land contiguous? to a State controlled road and for - Untess you answered “none of the above” to Q2, . . . the application tiggers referral to the Department (J (a) material change of use assessable against the planning scheme; ae ml nat an ie [11 (b) reconfiguring a fot unless - agency, whe in other cieumstences OMR will « the total number of lots is not increased; and be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased; Seneinle 2of te & Regulation wl assist youto Oo operational work (not associated with a material change of use assessable against the concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above)— « associated with access to a State-controlled road; or for filling or excavation; or involving the redirection or intensification of site stormwater from the land, through a pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a State-controlled road. (1 (ii) development on land not contiguous to a State-controlled road and - (1 (a) material change of use - « assessable against the local government's planning scheme; and « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by that schedule; (1 (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation and exceeding the thresholds set by that schedule; ©) (c) operational work (not associated with a material change of use assessable against the planning scheme or reconfiguring a lot mentioned in (b) above)- « assessable against the local government's planning scheme; and * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by that schedule. EX] (ili) none of the above Clearing vegetation 3. The application involves: (tick applicable box/es) pp For more information refer to Guide 12. oO (i) material change of use - Unless you answered “none of the above" to Q3, . . . the application requires assessment by the (a) assessable against the planning scheme; Department of Natural Resources and Water ining — (NRW), (b) on a lot containing _ ifan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or manager for the application, NRWisa « if there is no property map of assessable vegetation for the lot - remnant vegetation; fonaurTenoe agency forthe application in relebon (c) where the existing use of the land is a rural or environmental use; and tf you ticked 03(}) or (i), your application requires| (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1 referral to NRW for assessment regardless of oO (ii) reconfiguring a lot - whether vegetation clearing Is proposed or not . (a) onalot containing a category 1, 2 or 3 area shown on a property map of assessable vegetation or, if there is no property map of assessable vegetation for the lot, remnant vegetation; (b) where the size of the lot before the reconfiguration is 2 hectares or larger; (c) where 2 or more lots are created; and (d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1 (ill) operational work - (a) for the clearing of native vegetation where the vegetation clearing is made assessable under Schedule 8 of the IPA; and (b) not associated with a material change of use assessable against the planning scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of Form 4 EX (iv)_ none of the above. Strategic port land 4. The application involves: For more information refer to Guide 11. If you ticked (i) - the relevant Port Authority is the assessment manager for the application. If you ticked (i) Queensland Transport is a concurrence agency for the application. LD (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI Act) - complete Part ! of Form 1 UO (ii) a material change of use that is inconsistent with the land use plan approved under the Tl Act for the strategic port land - complete Part | of Form 1 & (iii) none of the above 4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean tand - if part of the !and is within 100m of the State-controlled road; or that is part of a future State- controlled road. Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2024 - Op Works - Access, S/Water & Frontage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.