Council archive · source document
07/2024 - Op Works - Access, S/Water & Frontage [As Published] · 142007.2024
NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 10 aa IN(@l@Ny3@ Local Laws, Policies & State MOMESSENSIA = Regulation Requirements INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM CONDITIONS OF APPROVAL 1. The applicant is advised that development contributions and infrastructure charges applicable to this development approval have been based on the following Uses Class/ Uses and applicable quantities:- Existing Development | o of, : ae Approved: Development Existing Use Class-t:; . Existing aur antity “Approved Use Classi | . Approved Quantity Vacant Land (one Multiple Housing - Type . Detached House Dwelling allocation) 2 - Duplex 2x 2 Bedroom Units 2. The applicant is informed that approval of this development application will trigger an Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated amount of $3,747 and is subject to variations in the Consumer Price Index, All Groups Brisbane from June 2007 until the date of payment. An Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated Planning Act 1997. 3. The applicant is informed that payment via credit card transaction will not be an acceptable method of payment: for development contributions conditioned in this permit or for infrastructure charge notices issued separately. 4. The applicant is advised that a Compliance Permit for all plumbing and drainage works within the boundaries of the development site shall be obtained from Council's Plumbing Services Section prior to obtaining a Development Permit for Building Works. 5. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of operational works exceeds $80,000, then a portable fong service leave levy is required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational works must be submitted to Council with the lodgement of any application for operational works over the site. 6. The development should be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions in accordance with the nuisance provisions of the Environmental Protection Regulation 1998 or Council's Local Law No. 12 ~ Control of Nuisances. 7. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement, concrete, builder's waste or rubbish should not be permitted to enter or be placed where it could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot fines apply for such offences. MG jf \datawrks\wrkcache\1417946\d 1544decnotice 153171,.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2024 - Op Works - Access, S/Water & Frontage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.