Council archive · source document
07/2024 - Op Works - Access, S/Water & Frontage [As Published] · 142007.2024
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007 \Mandatory attachments and supporting information j 12. Whatare the other parts of IDAS Application Form 1 submitted with this application, and the other mandatory attachments and supporting information accompanying this application, not identified in those other form paris? ~"Description of attachment or information Title (if applicable) eT Sali (e.g. Part C of Form 1, owner's consent, evidence af | (e.g. General Authority,James Street Traffic Date Method of ee very to resource allocation/entitlement, plans, drawings, reports) Report) assessment manager 1 Part E 25-Sep-2007 | mail 2 IDAS Assessment Checklist 25-Sep-2007 | mail 3 Architectural plans prepared by Burleigh Dey Proposed Duplex for Colvin Todd | 13-Sep-2007 | mail 4 Hydraulic plans prepared by Sweet Designgy 25-Sep-2007 | mail [Portable Long Service Leave (PLSL) levy for building and construction work | 13, 1s payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit for the applicati [e] No [_} Yes 13(a). ion can be given? Indicate the reason PLSL is not applicable [1 The application is not for building and construction work under the Building and Construction Industry (Portable Long Service Leave) Act 1991, section 3AA (e.g. the application is only for a change of use or for the following types of work carried out solely for farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or controlling weeds or pests); OF (1 Allcosts, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or O The work is being carried out under an owner-builder permit issued under the Queensiand Building Services Authority Act 1991- Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be sighted by the assessment manager before a development permit can be given OFFICE USE ON! LY Date Received | Reference Numbers FOR COMPLETION BY ASSESSMENT MANAGER @ Is a QLeave Notification and Payment Form required for this application? ([) No LL] Yes - Complete Table M NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER To Council | have been engaged as the private certifier for the building work referred to in this application Date of engagement Accreditation number Name BSA Certification number Building classification
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2024 - Op Works - Access, S/Water & Frontage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.