EXTENSION TO CURRENCY PERIOD – DELEGATED REPORT
Author Development Planner, Matt Pinese
Development Assessment
APPLICATION DETAILS
Application No. DBW21/0183.01
Development Approval Building Work Assessable Against the Planning Scheme -
Extension to Currency Period
Applicant Ms Jill W Smith and Mr Peter R Smith
Request Received On 3 September 2024
Report Completed Date Andrew Gaffney - 9 October 2024
PROPERTY DETAILS
Property Address 22 Park Crescent, Sunshine Beach Qld 4567
RP Description Lot 590 on RP48112
Land Area 588m2
Existing Use of Land Dwelling House
STATUTORY DETAILS
SEQRP Designation Regional Plan
Locality Sunshine Beach
Zone Low Density Residential
Overlays Land Subject to Acid Sulfate Soils Overlay (OM-ASS)
- Above 5 metres AHD to 20 metres AHD (Area 2)
Coastal Protection Overlay Map (OM-CP)
- Coastal Protection and Scenic Amenity
Landslide Hazard Overlay Map (OM-LS)
- High Hazard Area
Assessment Type Extension to Currency Period
1. PROPOSAL
The applicant seeks an extension to the currency period for a further two years.
Page 1 of 2
Document Set ID: 23269699
Version: 4, Version Date: 10/10/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
EXTENSION TO CURRENCY PERIOD – DELEGATED REPORT
The applicant states that the landowner has not been able to commence the building works, as
approved by Council on 12 October 2022. These reasons for the requested extension relate to
both personal circumstances and difficulties experienced by the local construction industry.
No other changes to the development conditions and approved plans are requested and the
landowner will commence the development should Council approve the requested extension.
2. BACKGROUND
A development approval for Building Works assessable against the Planning Scheme
(DBW21/0183) – Dwelling House was issued on 12 October 2022.
This application assessed performance-based solutions for setbacks, building height and site
cover. These solutions were supported and the application was approved, subject to reasonable
and relevant conditions.
The currency period for the development was conditioned, as reproduced below:
6. This development approval lapses if the use has not happened by 7 October 2024, unless an
application to extend the currency period is approved by Council.
The landowner did not exercise any appeal rights under the Planning Act 2016 following the
receipt of this decision notice.
3. ASSESSMENT
The applicant has requested an extension to the currency period to the development approval
under section 86 of the Planning Act 2016.
Given the circumstances and reasons for the extension, a further period of two (2) years is
considered appropriate.
The relevant matters pertaining to the assessment of the original development application that
Council must consider have not changed since the application was approved on 12 October
2022.
Since the approval has been granted there has been no changes to the Noosa Plan 2020 and
therefore the development remains consistent with the current provisions.
Furthermore, there have been no changes to the applicable planning process that would apply to
an application for the development if it was to be made now. This includes no change to the level
of assessment and no referral agencies are now triggered.
4. CONCLUSION
In consideration of the landowner’s personal circumstances and the challenges being
experienced in the construction industry, an extension to the currency period of two (2) years is
appropriate and will give the landowner the time required to complete the development.
RECOMMENDATION
That Council note the report regarding Application No. DBW21/0183.01, for a Development
Permit for Building Work Assessable Against the Planning Scheme - Extension to Currency
Period situated at 22 Park Crescent, Sunshine Beach Qld 4567 described as Lot 590 on
RP48112, and approve the extension to the currency period and amend condition 6 to read as
follows:
6. This development approval lapses if the use has not happened by 7 October 2026, unless an
application to extend the currency period is approved by Council.