FINAL Ecological Management Plan Stage 1_Grasstree Court 5 February 2021

Attached to the e-mail Cover letter - Ecological Management Plan - Grasstree Ct Sunrise Beach.

Attached to the e-mail Cover letter - Ecological Management Plan - OPW18/0343.02 - Grasstree Court Sunrise Beach.

Attached to the e-mail OPW18 0343 - Sunrise Beach RAC - Grasstree Court Intersection.msg.

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Ecological Management Plan – Grasstree Court – Lot 6




 Figure 3B –Staged Clearing Plan




                                                       10


[OCR of page images]
Ecological Management Plan — Grasstree Court — Lot 6

 

 

 

CLEARING STAGE 1B:

(Clearing of Lot 6 (approx 0.8Ha)
CLEARING STAGE 1A:
(Cleared material to be relocated .
|to the first stage of the rehabilita- - \Clearing along Grasstree Crt Verges to en:
ition site as per EMP « jable installation of trunk services and foot-
‘ ipaths.

Minor Clearing within Lot 6 and Lot 9 to es-
itablish 2 x Transformer sites to enable

IBalance 2.8Ha to be spread on site |e
lfor temproaty stabilsittion, reused in|

\
landscape areas, or removed off

NOTE:

|The extents of clearing shown here
are indicative only. All trees nomin-
lated for retention to be retained as per

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ise te te] FOR APPROVAL i onooiset Tacifeua]| BLUE CARE SUNRISE BEACH OVERALL WORKS

T= NOT FOR CONSTRUCTION e Cc “eurvsess| RETIREMENT LIVING & PLAN

Ele pipes og toupee @slueCare i : i =m

FFs — ose Live life your way. Juicucocrsceomenceercomens Po — =
PE Leon ae © caltresous.com fos ogomcencrermmmscsosr 148-001942  1000-SK100__-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 3B —Staged Clearing Plan

 

 

 
Log in to download the original file

FINAL Ecological Management Plan Stage 1_Grasstree Court 5 February 2021.pdf · 10.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.