FINAL Ecological Management Plan Stage 1_Grasstree Court 5 February 2021

Attached to the e-mail Cover letter - Ecological Management Plan - Grasstree Ct Sunrise Beach.

Attached to the e-mail Cover letter - Ecological Management Plan - OPW18/0343.02 - Grasstree Court Sunrise Beach.

Attached to the e-mail OPW18 0343 - Sunrise Beach RAC - Grasstree Court Intersection.msg.

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
TABLE OF CONTENTS - ECOLOGICAL MANAGEMENT PLAN
1.       INTRODUCTION .......................................................................................................................................... 1
         1.1 SUBJECT LAND AND APPROVED DEVELOPMENT ................................................................................. 1
         1.2 PURPOSE OF THE PLAN ........................................................................................................................ 2
         1.3 OBJECTIVES .......................................................................................................................................... 2
         1.4 STATEMENT ......................................................................................................................................... 2
2.       STRUCTURE AND RESPONSIBILITY OF THE MANAGEMENT PLAN .............................................................. 3


ATTACHMENTS ......................................................................................................................... 6
FIGURE 1- SUBJECT LAND (IDENTIFIED BY WHITE DASHED OUTLINE) .................................................................. 7
FIGURE 2 - APPROVED DEVELOPMENT (MINOR CHANGE LOT 6) ......................................................................... 8
FIGURE 3A – APPROVED STAGED DEVELOPMENT ................................................................................................ 9
FIGURE 3B –STAGED CLEARING PLAN ................................................................................................................. 10


APPENDIX A - VEGETATION AND FAUNA MANAGEMENT PLAN – STAGE 1 .......................... 11
1.       INTRODUCTION ........................................................................................................................................ 12
2.       GLOSSY BLACK-COCKATOO TREES............................................................................................................ 12
         2.1 ACTIVE FEED TREE IDENTIFICATION ................................................................................................... 12
         2.2 SEED COLLECTION AND PROPAGATION ............................................................................................. 12
         2.2 THREATENED FLORA .......................................................................................................................... 13
3.       VEGETATION PROTECTION ...................................................................................................................... 14
4.       FAUNA MANAGEMENT ............................................................................................................................ 15
         4.1  PRE-CLEARING .............................................................................................................................. 15
         4.2  CLEARING & CONSTRUCTION ....................................................................................................... 15
         4.3  HABITAT CREATION ...................................................................................................................... 15
5.       VEGETATION CLEARING ........................................................................................................................... 16
         5.1  DEVELOPMENT AREA - LOT 6 - CLEARING METHODOLOGY ......................................................... 16
         5.2  BUSHFIRE BUFFER AREAS ............................................................................................................. 16
         5.3  CLEARING DIRECTION ................................................................................................................... 16
6.       LIGHTING.................................................................................................................................................. 17
7.       FENCING ................................................................................................................................................... 17
8.       COMMUNITY CONSULTATION ................................................................................................................. 18


APPENDIX B - REHABILITATION MANAGEMENT PLAN – STAGE 1 ......................................... 23
1.       INTRODUCTION ........................................................................................................................................ 24
2.       SITE TREATMENT AND TRANSFER METHODS .......................................................................................... 24
         2.1 OVERVIEW.......................................................................................................................................... 24
         2.2 SOIL SEED BANK TRANSFER................................................................................................................ 25
         2.3 CLEARING METHODOLOGY ................................................................................................................ 25
         2.4 TRANSPORTING MATERIAL ................................................................................................................ 25
3.       THREATENED FLORA AND SEED COLLECTION .......................................................................................... 26
4.       RECEIVING SITE REHABILITATION ............................................................................................................ 27
         4.1 DESCRIPTION AND TENURE ............................................................................................................... 27
         4.2 TREATMENT AREAS ............................................................................................................................ 27
         4.3 RECEIVING SITE PREPARATION .......................................................................................................... 27
         4.4 RECEIVING SITE PLANTING AND HABITAT CREATION ........................................................................ 28
         4.5 IRRIGATION AND WATERING ............................................................................................................. 28
5.       REHABILITATION ESTABLISHMENT AND MAINTENANCE ......................................................................... 29
6.       PERFORMANCE CRITERIA AND MONITORING ......................................................................................... 30

                                                                                                                                                                          ii
Log in to download the original file

FINAL Ecological Management Plan Stage 1_Grasstree Court 5 February 2021.pdf · 10.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.