Skip to the record
Search everything, all in one place.

Original source · versioned page text

RFI - D - Civil Engineering Response

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Our Reference: 2008

23 July 2020


Property Projects Australia
PO Box 1264
New Farm Qld 4005

Attention: Alan Irvin



Dear Alan,


RE:      RESPONSE TO COUNCIL INFORMATION REQUEST DATED
         19/05/2020, APPLICATION No. MCU20/0037
         11 MARGIT CRESCENT, SUNRISE BEACH
         (LOT 135 on RP132135)


We refer to Council’s Information Request letter dated 19 May 2020, and provide the
following partial response to engineering items as listed in the above request.

ISSUE 9
The proposed development includes 2 separate driveways and no on-site manoeuvring
area to permit vehicles to exit in a forward gear. The 2 driveways will result in a loss of
on-street parking space. The proposal does not achieve the specific outcomes of the
relevant codes and is not in accordance with the relevant probable solution:
       i. The Eastern Beaches Locality Code:
                a. Specific Outcome O42, Probable Solutions S42.3 and S42.4
       ii. The Driveways and Carparking Code:
                a. Specific Outcome O1, Probable Solution S1.2
                b. Specific Outcome O8
                c. Specific Outcome O11, Probable Solution S11.1
       iii. The Transport, Roads and Drainage Code:
                a. Specific Outcome O4

Information Required:
Provide amended plans that achieve the specific outcomes of the applicable codes and/or
are in accordance with the probable solutions. Alternatively provide sufficient justification
from suitably qualified persons to demonstrate how the development achieves the specific
outcomes of the applicable codes

RESPONSE
TTM Consulting Pty Ltd (TTM) have prepared a traffic impact statement for the proposed
development (Ref: 20BRT0181), providing justification to demonstrate how the
development achieves the specific outcomes of the applicable codes. A copy of TTM’s
statement has been enclosed with this letter.




2008 – Margit Cres, Sunrise Beach                                                           1
CL/cl
Log in to download the original file

RFI - D - Civil Engineering Response.pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.