Council archive · source document
Appendix E Traffic Impact Assessment Report · MCU22/0038
Division 19 – Waste Management Code
Table 14-60
Specific Outcomes Probable Solutions Compliance Response
ü/û/NA
Waste separation N/A S1.1 not applicable
O1 S1.1 Construction, operational and demolition works
Development that generates several classes Construction, operational and considerations are beyond the scope of this traffic
of waste is designed so waste is collected, demolition works are planned and assessment.
stored and disposed of in a safe and managed in accordance PSP11
ecologically sustainable manner3. AND
S1.2 ü Complies with S1.2
Adequate area is provided for on-site The subject development includes the provision of a
for the collection and separate storage dedicated bin storage area capable of
of recyclable, non-recyclable, accommodating up to two 1,100L bulk bins, which is
vegetative and hazardous materials in considered adequate given the proposed land use is
their specific waste streams during expected to have a low waste generation potential.
construction, operational and
The disposal of medical waste is to be arranged by
demolition works;
individual tenants as required.
AND
O2 S2.1 ü Complies with S2.1
Waste storage areas provide for adequate Waste storage areas allow for the The subject development does not preclude the
separation of all recyclable and non- separate storage of different waste storage of a recycling bin alongside a general waste
recyclable materials. materials for reuse or recycling by— bin in the bin storage area. Signage would be
a) providing sufficient area to store resolved as part of the detailed design process.
all recyclable material and
recycling containers required; and
b) sign posting the types of waste
stored.
Design and location of waste storage ü Complies with S3.1
areas S3.1 The design of the proposed waste storage area is to
O3 Waste storage areas are designed and be resolved as part of the detailed design process;
Waste storage areas are located so that maintained in accordance with PSP 9; however the subject development does not preclude
they are convenient and safe to use and AND
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E Traffic Impact Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.