RFI - Stormwater Mgm Plan 20169 - SBSMP - Rev 4 (2)

of 92

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                         20169 - SBSMP/4
                                                                                                    Page 13




                                       Table 5-5 - Comparison of Peak Flows
         XPSTORM       XPSTORM         XPSTORM       XPSTORM         XPSTORM                  XPSTORM
        Catchment A   Catchment A     Catchment B   Catchment B     Catchment C              Catchment C
  ARI       Pre-         Post-            Pre-         Post-            Pre-                    Post-
(years) development   development     development   development     development              development
           Flows    Flows (Mitigated)    Flows    Flows (Mitigated)    Flows                    Flows
           (m3/s)        (m3/s)          (m3/s)        (m3/s)          (m3/s)                   (m3/s)
   1         0.036             0.032           0.058            0.046            0.027          0.016

   2         0.043             0.038           0.071            0.056            0.030          0.018

   5         0.068             0.052           0.112            0.084            0.041          0.024

   10        0.087             0.060           0.142            0.102            0.050          0.027

   20        0.107             0.067           0.175            0.120            0.060          0.031

   50        0.129             0.084           0.210            0.137            0.070          0.031

  100        0.146             0.106           0.240            0.157            0.080          0.031


The XPSTORM hydraulic modelling has demonstrated that the proposed mitigation implemented will
maintain pre-development flows (or less) for all design storms at the LPDs located within Lot 46
and 62 on SP132578, southeast of the site, and Lot 79 on SP138388, northeast of the site. The
modelling has also demonstrated that post-development mitigated flows up to Q20 can be conveyed
through the 225 to 450mm diameter stormwater line traversing the rear of Lots 45, 46 and 62 on
SP132578 and Lots 42-44 on SP144002 and the existing 300mm diameter stormwater line within the
driveway of Lot 79 on SP138388.

Refer to Appendix H for the pre-development XPSTORM results, Appendix I for the post-
development XPSTORM results and Appendix J for the XPSTORM post-development mitigated
results.

5.4.5 Sensitivity Analysis for 1% AEP Storm Event at end of Planning Period 2100
A sensitivity analysis has been undertaken to determine the impact from a 1% AEP storm event at
end of planning period 2100 takes into account a 20% increase in rainfall intensity for climate
change. As part of the sensitivity analysis, post-development mitigated peak mean/median flow
rates were calculated in XPSTORM as a result of incorporating the 20% increase in rainfall intensity
for the catchment and are shown in Table 5-6 below for a 1% AEP storm event.

                       Table 5-6 – 2100 Post Development Mitigated Peak Flows
          XPSTORM Catchment A                XPSTORM Catchment B           XPSTORM Catchment C
 AEP
     Post-development Flows (Mitigated) Post-development Flows (Mitigated) Post-development Flows
 (%)
                  (m3/s)                             (m3/s)                        (m3/s)
   1                   0.142                                 0.201                          0.037


The XPSTORM hydraulic modelling shows that the water level exceeds the emergency weir level in
the southern basin by approximately 36mm. However, as can be seen when comparing flows
between Table 5-5 and Table 5-6, pre-development flows are still maintained for Catchment A.
There is also a 300mm wide gap between the boundary and the basin wall where emergency
overflow will fall onto natural ground level prior to sheet flowing across the boundary. Therefore,
pre-development drainage conditions are not expected to be worsened for the downstream
properties within Lot 46 and 62 on SP132578, southeast of the site.

Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville
Log in to download the original file

RFI - Stormwater Mgm Plan 20169 - SBSMP - Rev 4 (2).pdf · 14.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.