Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                         20169 - SBSMP/4
                                                                                                        Page 17




6.3 Operational Phase
The proposed development has been assessed against the latest State Planning Policy 2017 (SPP
2017). The proposed development will entail the material change of use for urban purposes, which
will involve a land area greater than 2,500m2. Consequently, State Planning Policy 2017 (SPP 2017)
is triggered and stormwater quality treatment is will be required for this development.

Water quality objectives (WQO’s) for South East Queensland as set out in State Planning Policy 2017
(SPP 2017) should be achieved by identifying and adopting best practise techniques in accordance
with the abovementioned guidelines. Refer to Table 6.3 for the target WQO’s.

                           Table 6.3 – Minimum Mean Annual Load Reductions

                                                             Minimum Mean Annual
                                    Contaminant
                                                                Load Reductions

                            Total Suspended Solids (TSS)             ≥ 80%
                               Total Phosphorus (TP)                 ≥ 60%
                                Total Nitrogen (TN)                  ≥ 45%
                               Gross Pollutants (GP)                 ≥ 90%

6.3.1 Sources of Contaminants
Potential sources of contaminants and stormwater quality improvement devices identified for the
operational phase of the development are outlined in Table 6.4

                                   Table 6.4- Sources of Contaminants

                                                 Pollutant
               Target Pollutant Type                             Acceptable Treatment Examples
                                                   Size

         Primary        Screening of gross                     Litter baskets, swales, buffer strips,
                                                 >5000um
        Pollutants          pollutants                              GPT’s, Bio-retention basins

                        Sedimentation of
        Secondary                                125um -
                        coarse to medium                       Swales, sedimentation basins, ponds
        Pollutants                               5000um
                            sediment
                                                                Bio-retention basins, constructed
                           Enhanced
                                                  10um –      wetland macrophyte zones, other bio
                      sedimentation of fine
                                                  125um         technologies, proprietary tertiary
                          particulates
                                                                   stormwater treatment dvices
         Tertiary     Adhesion and filtration                Constructed wetland macrophyte zones,
                                                 0.45um –
        Pollutants    of very fine / colloidal                 other bio technologies, proprietary
                                                   10um
                             sediment                         tertiary stormwater treatment dvices
                       Biological uptake of                  Constructed wetland macrophyte zones,
                                                 <0.45um
                        dissolved particles                          other bio technologies




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville
Log in to download the original file

RFI - Stormwater Mgm Plan 20169 - SBSMP - Rev 4 (2).pdf · 14.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.