Skip to the record
The gold standard in government transparency.

Original source · versioned page text

RFI - Stormwater Mgm Plan 20169 - SBSMP - Rev 4 (2)

of 92

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                     Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

Stormwater Drainage Design
PO1                                                      AO1                                                                   RO1
The development and its stormwater                       A stormwater management plan is prepared                              The proposal complies. Refer to the Site
management system is planned and designed                consistent with PSP6 Engineering Design                               Based Stormwater Management Plan
having regard to:                                        Standards - Roads, drainage and                                       (SBSMP) report prepared by MCE.
 (a) the natural features of the site;                   earthworks.
 (b) the need to avoid impacts and potential risks
     to ecologically important areas;
 (c) the likely effectiveness of erosion and                                                                        
     sediment control and stormwater drainage
     measures during rainfall events during and
     post construction; and
 (d) the need to protect environmental values
     and water quality of receiving waters both
     during and post construction
PO2                                                      AO2.1                                                                 RO2.1
Stormwater drainage infrastructure is planned,           Stormwater drainage planning, design and                              All stormwater design will comply with
designed and                                             construction is in accordance with PSP6                               the PSP6 Engineering Design Standards
constructed to:                                          Engineering Design Standards - Roads,                                - Roads, drainage and earthworks and
 (a) incorporate allowance for increased flood           drainage and earthworks and the latest                                the latest version of the Queensland
     risk and tidal inundation through pipework as       version of the Queensland Urban Drainage                              Urban Drainage Design Manual.
     a result of cilmate change and sea level rise;      Design Manual.
 (b) ensure the development is adequately                AO2.2                                                                 RO2.2
     drained; and                                        The stormwater drainage system connects to                            Refer to the SBSMP prepared by MCE
 (c) ensure stormwater is managed and lawfully           a lawful point of discharge in accordance                            for the lawful points of discharge.
     discharged without altering stormwater              with PSP6 Engineering Design Standards -
     drainage characteristics external to the site.      Roads, drainage and earthworks.
                                                         AO2.3                                                                 RO2.2
                                                         Stormwater flows discharging from the                                 The proposal complies. Two detention
                                                         development are demonstrated to be                                    basins will be utilised to mitigate flows
                                                         consistent with pre-development                                      prior to discharge to the legal points of
                                                         characteristics.                                                      discharge. Refer to the SBSMP prepared
                                                                                                                               by MCE.
                                                         AO2.4
                                                                                                                    N/A
                                                         Development provides for the management

1
    Solution:         Acceptable Solution                                                                                                                                                          Page 1 of 10
                A/S    Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A    Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                           Rev:      2
Site Address: 99, 101 & 105 Eumundi Noosa Road, Noosaville                                                                                                                                             13/10/2021
Log in to download the original file

RFI - Stormwater Mgm Plan 20169 - SBSMP - Rev 4 (2).pdf · 14.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.