Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

RFI - Stormwater Mgm Plan 20169 - SBSMP - Rev 4 (2)

of 92

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                      Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                          requirement for specialized equipment for
                                                          maintenance techniques.
PO5                                                       AO5.1
Stormwater drainage infrastructure is aligned to          Stormwater drainage infrastructure avoids
avoid crossing waterways, wetlands, drainage              crossing waterways, wetlands drainage lines                N/A
lines and ecological important areas, or where it is      and ecologically important areas or follows
demonstrated this is unavoidable, disturbed areas         the edge of existing disturbed areas.
are reinstated and revegetated upon completion            AO5.2
of works.                                                 Stormwater drainage infrastructure avoids
                                                          crossing waterways, wetlands drainage lines                N/A
                                                          and ecologically important areas or follows
                                                          the edge of existing disturbed areas.
                                                          AO5.3
                                                          Temporary vehicular crossings of waterways
                                                          must be designed and constructed to be
                                                                                                                     N/A
                                                          consistent with the current International
                                                          Erosion Control Association Best Practice
                                                          Book Series.
Stormwater quality and protection of receiving waters
PO6                                                       AO6.1                                                                 RO6.1
Development is located, designed, constructed             Stormwater runoff discharging into High                               The proposal complies.
and operated to protect and enhance                       Ecological Value waters as a result of
environmental values and water quality of                 development causes no increase in gross
waterways, wetlands, lakes, ground waters and             pollutants, total suspended solids, total                  
drainage systems.                                         phosphorous or total nitrogen compared to
                                                          a pre-development scenario.
Editor’s note: Environmental values of waters             AND
and water quality objectives are prescribed in            AO6.2                                                                 RO6.1
Schedule 1 of the Environmental Protection                All stormwater runoff is treated to achieve                           The proposal complies. Two bio-retention
(Water) Policy 2009 and are identified on the             maximum removal of nutrients, gross                                   systems will be incorporated into the
State Planning Policy Interactive Mapping System          pollutants and suspended solids as                                    drainage design to achieve the target
                                                          determined by cost to efficiency ratios. (e.g.                       pollutant reduction loads. Refer to the
                                                          bioretention basins must be sized to                                  SBSMP prepared by MCE.
                                                          achieve at least 80% reduction in total
                                                          suspended solids, 60% reduction in total

1
    Solution:          Acceptable Solution                                                                                                                                                          Page 3 of 10
                A/S     Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A     Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                            Rev:      2
Site Address: 99, 101 & 105 Eumundi Noosa Road, Noosaville                                                                                                                                              13/10/2021
Log in to download the original file

RFI - Stormwater Mgm Plan 20169 - SBSMP - Rev 4 (2).pdf · 14.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.