Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                     Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                         to be dedicated as public assets are
                                                         established and maintained during the
                                                         maintenance period to ensure optimal
                                                         vegetated growth and that the functional
                                                         elements of the system achieve the design
                                                         function at the end of the maintenance
                                                         period.
PO9                                                      AO9.1                                                                 RO9.1
Treatment systems are designed to eliminate or           Free draining inlets and outlets are provided                         The proposal complies. The proposed
minimise health, safety and aesthetic hazards,           to ensure that waters do not pond for more                           stormwater treatment system will be
including risks associated with insect breeding,         than 24 hours.                                                        design to be free draining.
odour and public safety.                                 AO9.2                                                                 RO9.2
                                                         Developments are designed to eliminate                                A safety fence will be installed around
                                                         retaining walls in excess of 0.8m for any                             the perimeter of the basin and a lockable
                                                         water quality treatment device.                                       gate located at the maintenance access
                                                                                                                              ramp to prevent public access. In
                                                                                                                               addition, education signage will be
                                                                                                                               installed at each basin location to inform
                                                                                                                               the residences of the function each basin
                                                                                                                               provides.
Hydraulic and Waterway Stability
PO10                                                      AO10                                                                 RO10
Development prevents increased bed and bank               The development is designed to:                                      The proposal complies. Refer to the
erosion and sedimentation in receiving waterways         (a) limit the peak 1 year ARI event discharge                         SBSMP prepared by MCE.
by avoiding changes in low rate, peak flow run-off           within the receiving waterway to the pre-
and flow duration.                                           development peak 1 year discharge;
                                                         (b) maximise pervious areas by using
                                                             pervious alternatives for otherwise
                                                             impervious areas wherever possible;                    
                                                         (c) provide for capture and reuse of
                                                             stormwater for non-potable purposes for
                                                             gardening, toilet flushing, laundry and hot
                                                             water supply uses;
                                                         (d) incorporate appropriate detention
                                                             features; and

1
    Solution:         Acceptable Solution                                                                                                                                                          Page 5 of 10
                A/S    Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A    Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                           Rev:      2
Site Address: 99, 101 & 105 Eumundi Noosa Road, Noosaville                                                                                                                                             13/10/2021
Log in to download the original file

RFI - Stormwater Mgm Plan 20169 - SBSMP - Rev 4 (2).pdf · 14.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.